}

Tender For Item Rate Contract For Rewinding Of Various Types And Capacities Of Motors Along With Allied Works In Respect Of Jal Shakti Phe Mechanical Division Rajouri, rajouri-Jammu And Kashmir

Public Health Engineering Department has published Tender For Item Rate Contract For Rewinding Of Various Types And Capacities Of Motors Along With Allied Works In Respect Of Jal Shakti Phe Mechanical Division Rajouri. Submission Date for this Tender is 21-09-2023. Lifting Equipment Tenders in rajouri Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

39383765
Corrigendum : Tender For Item Rate Contract For Rewinding Of Various Types And Capacities Of Motors Along With Allied Works In Respect Of Jal Shakti Phe Mechanical Division Rajouri
Open Tender
Indian
Jammu And Kashmir
Rajouri
21-09-2023

Tender Details

Item Rate Contract For Rewinding Of Various Types And Capacities Of Motors Along With Allied Works In Respect Of Jal Shakti Phe Mechanical Division Rajouri- 1 Disconnecting Of Power Connections From Starter / Panel, Extraction Of Submersible Pump Set ( V-4 ) From Borewell Along With Column Pipes By Way Of Hoisting Chain Pulley Block. Then Lowering Of Repaired Submersible Pump Set Along With Column Pipes, Making Of Power Connections To Starter / Panel. Complete Job Includes Cost Of Material Such As Nut / Bolts, Insulation Tapes, Thimbles & Gaskets Etc. And Labour Charges ( Skilled / Semi- Skilled ) . 2 Disconnecting Of Power Connections From Starter / Panel, Extraction Of Submersible Pump Set ( V-6 ) From Borewell Along With Column Pipes By Way Of Hoisting Chain Pulley Block. Then Lowering Of Repaired Submersible Pump Set Along With Column Pipes, Making Of Power Connections To Starter / Panel. Complete Job Includes Cost Of Material Such As Nut / Bolts, Insulation Tapes, Thimbles & Gaskets Etc. And Labour Charges ( Skilled / Semi- Skilled ) . 3 Disconnecting Of Power Connections From Starter / Panel, Extraction Of Submersible Pump Set ( V-8 ) From Borewell Along With Column Pipes By Way Of Hoisting Chain Pulley Block. Then Lowering Of Repaired Submersible Pump Set Along With Column Pipes, Making Of Power Connections To Starter / Panel. Complete Job Includes Cost Of Material Such As Nut / Bolts, Insulation Tapes, Thimbles & Gaskets Etc. And Labour Charges ( Skilled / Semi- Skilled ) . 4 Disconnecting Of Power Connections From Starter / Panel, Extraction Of Submersible Pump Set ( V-6 ) From Dugwell Along With Column Pipes By Way Of Hoisting Chain Pulley Block. Then Lowering Of Repaired Submersible Pump Set Along With Column Pipes, Making Of Power Connections To Starter / Panel. Complete Job Includes Cost Of Material Such As Nut / Bolts, Insulation Tapes, Thimbles & Gaskets Etc. And Labour Charges ( Skilled / Semi- Skilled ) . 5 Disconnecting Of Power Connections From Starter / Panel, Extraction Of Submersible Pump Set ( V-8 ) From Dugwell Along With Column Pipes By Way Of Hoisting Chain Pulley Block. Then Lowering Of Repaired Submersible Pump Set Along With Column Pipes, Making Of Power Connections To Starter / Panel. Complete Job Includes Cost Of Material Such As Nut / Bolts, Insulation Tapes, Thimbles & Gaskets Etc. And Labour Charges ( Skilled / Semi- Skilled ) . 6 Labour Charges For Carriage / Shifting Of Submersible Pump Set From Pumping Station To Road Side And Back To Pumping Station On Head Load Including Loading / Unloading Charges. ( Up To 25 Hp ) 7 Up To 200 Mtr. 8 Up To 500 Mtr. 9 Up To 1000 Mtr. 10 Up To 1500 Mtr. 11 Beyond 1500 Mtr. 12 Labour Charges For Carriage / Shifting Of Submersible Pump Set From Pumping Station To Road Side And Back To Pumping Station On Head Load Including Loading / Unloading Charges. ( 26 Hp To 50 Hp ) 13 Up To 200 Mtr. 14 Up To 500 Mtr. 15 Up To 1000 Mtr. 16 Up To 1500 Mtr. 17 Beyond 1500 Mtr. 18 Labour Charges For Carriage / Shifting Of Submersible Pump Set From Pumping Station To Road Side And Back To Pumping Station On Head Load Including Loading / Unloading Charges. ( 51 Hp To 75 Hp ) 19 Up To 200 Mtr. 20 Up To 500 Mtr. 21 Up To 1000 Mtr. 22 Up To 1500 Mtr. 23 Beyond 1500 Mtr. 24 Dismantling / Assembling And Testing Of Submersible Pump Set At Workshop Including Loading / Unloading. 25 Disconnecting Of Power Connections From Starter / Panel, Disconnecting From Delivery Line And Extracting Out Mono Submersible Pump Set Complete Along With Column Pipes Andsubmersible Cable By Hoisting Chain Pulley Block / Manual Labour At Dug Well / Percolation Well. The Job Also Includes Stacking Of Column Pipes At Suitable Place And Loading Of Damaged Mono Submersible Pump Set In Mechanical Transport. 26 Lowering Of Standby / Repaired Mono Submersible Pump Setalongwith Column Pipes Andsubmersible Cable By Hoisting Chain Pulley Block / Manual Labour At Dug Well / Percolation Well. The Job Includes Connecting Of Power Connection To Starter / Panel With Proper Thimbling, Insulation And Connectingdelivery Of Pump With The Pipe Line. Complete Job Includes Cost Of Labour, Nut Bolts, Rubber Joints, Insulation Material Etc. At Site Of Work. 27 Dismantling / Assembling And Testing Of Mono Submersible Pump Set At Workshop Including Loading / Unloading. 28 Labour Charges For Carriage / Shifting Of Mono Submersible Pump Set From Pumping Station To Road Side And Back To Pumping Station On Head Load Including Loading / Unloading Charges 29 Complete Rewinding Of Submersible Motors 30 3.0 Hp 31 5.0 Hp 32 7.5 Hp 33 10.0 Hp 34 12.5 Hp 35 15.0 Hp 36 17.5 Hp 37 20.0 Hp 38 22.5 Hp 39 25.0 Hp 40 27.5 Hp 41 30.0 Hp 42 33.0 Hp 43 35.0 Hp 44 37.0 Hp 45 40.0 Hp 46 45.0 Hp 47 50.0 Hp 48 60.0 Hp 49 75.0 Hp 50 Complete Rewinding Of Submersible Motors ( Single Phase ) 51 1 Hp 52 1.5 Hp 53 2.00 Hp 54 3.00 Hp 55 Complete Rewinding Of Open Well Mono Sub Motors ( Three Phase ) 56 3 Hp 57 5 Hp 58 7.5Hp 59 10 Hp 60 12.5 Hp 61 15 Hp 62 20 Hp 63 Complete Rewinding Of Horizontal Squirel Cage Motors High Speed ( Threephase ) 64 7.5 Hp 65 10.0 Hp 66 12.5 Hp 67 15.0 Hp 68 20.0 Hp 69 25.0 Hp 70 30.0 Hp 71 35.0 Hp 72 40.0 Hp 73 50.0 Hp 74 60.0 Hp 75 75.0 Hp 76 80.0 Hp 77 100.0 Hp 78 Disconnecting Of Power Connection Of Damaged Induction Motor Then Dismantlingfrombase Frame By Way Of Unscrewing Of Nuts Bolts. Refitting By Way Of Mounting Of Repaired Motor On The Base Frame, Making Alignment Then Coupling With The Pump And Making Of Power Connections With The Help Of Skilled Labours. The Job Includes Cost Of Copper Thimbles, Nuts / Bolts, Sundry Items And Testing Of Hcp Set On Load. 79 Up To 40Hp 80 41 Hp To 60Hp 81 61 Hp To 100Hp 82 Labour Charges For Carriage / Shifting Of Induction Motor From Pumping Station To Road Side And Back To Pumping Station On Head Load Including Loading / Unloading Charges. ( Upto40 Hp ) 83 Up To 200 Mtr. 84 Up To 500 Mtr. 85 Up To 1000 Mtr. 86 Up To 1500 Mtr. 87 Beyond 1500 Mtr. 88 Labour Charges For Carriage / Shifting Of Induction Motor From Pumping Station To Road Side And Back To Pumping Station On Head Load Including Loading / Unloading Charges. ( 41Hp To60 Hp ) 89 Up To 200 Mtr. 90 Up To 500 Mtr. 91 Up To 1000 Mtr. 92 Up To 1500 Mtr. 93 Beyond 1500 Mtr. 94 Labour Charges For Carriage / Shifting Of Induction Motor From Pumping Station To Road Side And Back To Pumping Station On Head Load Including Loading / Unloading Charges. ( 61Hp To100 Hp ) 95 Up To 200 Mtr. 96 Up To 500 Mtr. 97 Up To 1000 Mtr. 98 Up To 1500 Mtr. 99 Beyond 1500 Mtr.

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 09-09-2023 EXTENSION OF DUE DATE Date 15-09-2023
2 15-09-2023 EXTENSION Date 21-09-2023

Key Value

Document Fees
INR 1000 /-
EMD
INR 25000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail