Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | DISTRIBUTION SYSTEM |
| 2 | Supply of following sizes and type of pipes with all jointing materials such as socket, rubber gasket as per IS 4984/1995 and IS-8329/2000 or their latest amendment including F.O.R. destinationand all taxes and insurance etc. with loading, unloading and stacking all complete. |
| 3 | HDPE PipePN-6 PE-100 |
| 4 | 110 mm dia |
| 5 | 140 mm dia |
| 6 | 160 mm dia |
| 7 | DI Pipe Class K-7 |
| 8 | 200 mm dia |
| 9 | 250 mm dia |
| 10 | 300 mm dia |
| 11 | 350 mm dia |
| 12 | 400 mm dia |
| 13 | Supply of specials for above Pipes. |
| 14 | HDPE Pipes (5 %of Sl.No 1.03 to 1.06 ) |
| 15 | D.I. Pipe (10 %of Sl.No 1.08 to 1.13 ) |
| 16 | Carting of following size & type of pipes and specials from departmental store to site of work and lowering them into the trenches and laying true to alignmentand gradient and jointing etc. complete including testing of pipe lines and cutting of pipes. |
| 17 | HDPE PipePN-6 PE-100 |
| 18 | 110 mm dia |
| 19 | 140 mm dia |
| 20 | 160 mm dia |
| 21 | DI Pipe Class K-7 |
| 22 | 200 mm dia |
| 23 | 250 mm dia |
| 24 | 300 mm dia |
| 25 | 350 mm dia |
| 26 | 400 mm dia |
| 27 | Excavation for pipeline work in ordinary Soil with lift up to 1.5 M and lead up to 50 M including filling back the excavated earth into the trenches with watering, ramming and disposal of surplus earth with in 50 M lead. |
| 28 | Supply of following sizes C.I.D./F Sluice valve including F.O.R. destination and taxes and insurance etc. complete as per relevant IS. |
| 29 | C. I. D/F Sluice Valve |
| 30 | 100 mm dia |
| 31 | 125 mm dia |
| 32 | 200 mm dia |
| 33 | 250 mm dia |
| 34 | 300 mm dia |
| 35 | 350 mm dia |
| 36 | 400 mm dia |
| 37 | Scour valve 80 mm dia |
| 38 | Fire Hydrant 80 mm dia |
| 39 | C.I. Single ball type Air Valve 50 mm dia |
| 40 | Carting of following sizes C.I.D./F Sluice Valve and specials from departmental store to site of work and lowering them into the trenches, fixing in position and jointingthem with pipelines and testing etc. complete including supply of jointing materials. |
| 41 | C. I. D/F Sluice Valve |
| 42 | 100 mm dia |
| 43 | 125 mm dia |
| 44 | 200 mm dia |
| 45 | 250 mm dia |
| 46 | 300 mm dia |
| 47 | 350 mm dia |
| 48 | 400 mm dia |
| 49 | Scour Valve 80 mm dia |
| 50 | Fire Hydrant 80 mm dia |
| 51 | C.I. Single ball type Air Valve 50 mm dia |
| 52 | Supply of all materials and construct following chambers as per type design with supply of all labour, T&P etc. complete. |
| 53 | Masonary Type |
| 54 | Fire Hydrant Chamber |
| 55 | Air Valve Chamber |
| 56 | Surface Box Type |
| 57 | Scour Valve Chamber |
| 58 | Dismentling of following type of road and stacking of useful materials including supply of all materials, labour, T&P etc. complete. |
| 59 | BOE Road |
| 60 | C.C. Road |
| 61 | Bitumen Road |
| 62 | Interlocking |
| 63 | Reinstatement of following type road As per PWD specification |
| 64 | BOE Road (with40 % New Bricks and 60 % old Undamaged serviceable bricks) |
| 65 | C.C. Road (with 150 mm PCC base of 1:4:8 cement: coarse sand: 40 mm Stone Aggregate and 100 mm Cement Concrete course of 1:1.5:3 cement: coarse sand: 20 mm Stone Aggregate) |
| 66 | Bitumen Road Nagar Palika1.granular sub-base With material conforming to Grade-I (size range 75 mm to 0.075 mm ) having CBR Value-25 125 mm layer thickness.2.granular sub-base With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 125 mm layer thickness.3. Providing, laying, Spreading & Compacting graded stone aggregateto wet mix macadam. (150 mm thickness)4. Providing & applying PrimeCoat with medium bitumen VG 10 on prepared surfacespreading primer at the rate of 0.75 Kg./Sqm.5.P/L of 40mm thick BC with 100-120 TPH batch type HMP Producing and Avg. Output of 75 TPH using crushed aggt. Of specified grading premixed with bituminous binder VG 30 @ 5.5 %6.Providing and laying seal coat over prepared surface of road with bitumen heated in bitumen boiler fitted with the spray set spraying using 98 kg of bitumen of grade VG - 10 and blinding surface with 0.90 cum of stone aggregate of 6.7 mm size7. Providing all necessary barricating and road painting work. |
| 67 | Bitumen Road PWD1.granular sub-base With material conforming to Grade-I (size range 75 mm to 0.075 mm ) having CBR Value-25 125 mm layer thickness.2.granular sub-base With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 125 mm layer thickness.3. Providing, laying, Spreading & Compacting graded stone aggregateto wet mix macadam. (150 mm thickness)4. Providing & applying PrimeCoat with medium bitumen VG 10 on prepared surfacespreading primer at the rate of 0.75 Kg./Sqm.5.P/L of 40mm thick BC with 100-120 TPH batch type HMP Producing and Avg. Output of 75 TPH using crushed aggt. Of specified grading premixed with bituminous binder VG 30 @ 5.5 %6.Providing and laying seal coat over prepared surface of road with bitumen heated in bitumen boiler fitted with the spray set spraying using 98 kg of bitumen of grade VG - 10 and blinding surface with 0.90 cum of stone aggregate of 6.7 mm size7. Providing all necessary barricating and road painting work. |
| 68 | Interlocking Tile Road (40 % New interlocking tile 80 mm thick M 35 Grade and 60 % old serviceable tiles , Palin cement concrete in 75 mm thickness 1:6:12 cement :sand: 40 mm coarse stone aggregate in base.) |
| 69 | Making house connection should be done atleast 2 m inside the boundary wall with provision of tap from distribution line to outer wall of house with supply of 1 m above GL G.I. pipe ( 15 mm ) ( above ground ) & average 5 mtr. MDPE Pipe ( 20 mm) ( below ground) including specials saddle Tapetc. of suitable size T&P etc. including excavation laying and jointing for proper completion of work as per instructions of Engineer as per Dwg 12 (excluding road restoration) |
| 70 | Surveysite Investigation Planning, design Drawings as per State Road manual and vetting / checked from State Road Divisional Office and taking NOC for trenchless crossing of National highway road and Railway track(crossing length 15m to 25m ), Road for of required dia Rising main/Ditribution pipe with casing pipe as required for proper completion of work required size of MS casing pipe as per drawing and as per (IS:3589 & made from confining to IS:2062) with 750 Micron PU coating internally and 250 micron anti corrosive bituminous paint externally by trenchless technology method at an average depth 3.60 mtr from normal ground level up to top of casing pipe including excavation & filling of Pit, Dewatering arrangement, Supporting system for soil,also including supply and fixing of 2 no Sluice valve ISI Mark, construction of sluice valve chamber etc. all complete work including supply & fixing specials in carrier pipe over main pipe, as per specification given in the bid documents including supply of all materials, labour T&P etc. for proper completion of work as per instruction of Engineer. |
| 71 | State Highway road crossing(Upto Dia 350 mm) |
| 72 | Road Crossing - Excavation in foundation of trench of proper sizein soil mixed with moorum, Shingle, Kankar, soft rock, hard rock, including refilling, dressing and ramming earth or sand or bajri, ballast, including providing, supply, carting, lowering, laying and jointing of casing pipe of DI-K9 150MMwith appropriate size, with rubber ring joint,sand filling in gap inside DI pipe, insertion of distribution pipe into the encasing pipe including supply of T&P, including concrete of 150 mm thick in with 40mm gauge brick ballastlocal sand and cement in proportion of 8:4:1, provision for barricading, labour for traffic diversion etc. complete for proper completion of work as per instruction of Engineer. |
| 73 | Provision for following types of Culvert crossing along the alignment of pipe line complete as per instructions of Engineer -in -charge. (casing of pipe is done by concreting) |
| 74 | Nala/Culvert Crossing (width -3.5 m) upto dia 300 mm |
| 75 | Canal Crossing ( width 5-10m) |
| 76 | Supply of all material, labour, T&P and construct RCC thrust blocks at the bends etc. comlete. |
| 77 | From 150mm to 400mm |
| 78 | LAYING OF RISING MAIN |
| 79 | Supply of D.I. pipes (K-7)offollowing size/wall thickness with I.S. 8329/2000 or its latest amendments with jointing materials including for destination and all taxes and insurance and including ALL SPECIALSOF RISING MAINetc. complete. |
| 80 | 200mm dia DI K-9 |
| 81 | 150mm dia DI K-9 |
| 82 | Excavation of earth for pipe line trenches with lift upto 1.5 and lead upto 50M filling back the earth into trenches including watering, ramming and disposal of surplus material with in 50M lead etc. complete. |
| 83 | Dismentling of following type of road and stacking of useful materials including supply of all materials, labour, T&P etc. complete. |
| 84 | Bitumen Road |
| 85 | Reinstatement of following type road As per PWD specification |
| 86 | Bitumen Road |
| 87 | Supply of all material, labour, T&P and construct RCC thrust blocks at the bends etc. comlete. |
| 88 | From 150mm to 400mm |
| 89 | Provide all materials, labour, T&P etc. complete and constructed Bye-pass chamber for pump house ( 1000 (L) x 1000 (W) x 1150 (H) mm ) drawing (drawing no.D-3) and as per the specifications for civil work given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in -charge. |
| 90 | Provide all materials labour T&P etc. complete and construct Pump house size (3.6x3.0x3.0)m Chlorinating room size (2.60x1.80x3.0)m as per departmental type design and drawing (drawing No-D-2) and as per the specifications for civil work given in the bid document including supply of all material labour and T&P etc complete as per instructions of Engineer -in - charge. |
| 91 | Provide all materials labour, T&P etc. and construct single room staff quarter at water works site identified by the Engineer-in-charge as per department type design and drawing and specifications of civil works laid down in the bid document, includingallmaterial labour,T&Petccompleteforproper completion of work as per instructions of Engineer -in -charge. (Drawing No.D-7) |
| 92 | Construction of O.H.T. |
| 93 | Supply of all materials labour T&P etc. complete and construction of R.C.C. (M25 Grade) Over Head Tank of following capacity and staging above ground level with all work complete, including cost of soil testing. All the components of OHT will be casted in M25 concrete & specially in M-30 construction of water bearing structure with cement, coarse sand and approved stone grit as per I.S. 11682, I.S.3370 part (I) & (II) and I.S.456.Minimum depth of foundation below original ground level will be 2.5M. Seismic effects and wind load should be taken into consideration as I.S. 1893 for earthquake resistance and as per I.S. 875 part-III for wind load on structure (this area is in seismic Zone IV and high damage risk zone for wind).The cost of OHT should be quoted assuming the bearing capacity of soil as 8 M.T.per sqm. including 1M wide RCC staircase from ground level to balcony. M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars(specification of M.S. should be as per IS 800-2007)with hand rails of 20mm medium class G.I. pipes on both sides in three rows from balcony to top dome resting on an RCC platform (75cmx75cm and 10cm thick) projecting from top ring beam and one aluminum ladder |
| 94 | inside the tank body (from manhole in top dome to bottom as per design and specification approved by Engineer in charge. 1 m wide R.C.C. M25 balcony around the tank at the junction point of vertical wall and conical wall. Proper railing of 20mm dia medium class G.I. pipe (in 3 rows) on both sides of stair case, around the balcony, at each landing and from landing with top ring beam upto manhole on the top dome and at the periphery of top dome. The G.I. Pipes will be supported on M.S. posts made ofor RCC post,spaced at intervals not more than 1.5m.Proper ventilator at top dome in circular shape of 1.2 m dia. along with an R.C.C. cover of minimum 1.50m dia and with mosquito net of standard quality along with expanded metaled jali between top dome and RCC cover. Water level indicator fabricated with good quality minimum45mm x 45mm section, of 3mm thick M.S. plate should have a clear width of minimum 25cm painted with good paint with brass wire rope, pulley, copper ball float, pointer etc.Lightening conductor should be as per I.S.S.2309 or its latest amendments of latest electricity rules. C.I. manhole cover of min 60x60cm size with locking arrangement, Supply, fixing & jointing of C.I.D./F Pipes (for inlet, outlet, washout and overflow pipes) and specials, duck foot bend and fixing of the sluice |
| 95 | valve at outlet and wash put pipe with all specials; construction of sluice valve chamber, floor and apron with semi circular drain around the apron with 25mm PCC 1:2:4 over 75 mm PCC 1:4:8, Apex painting on outer surface of OHT, painting on MS ladder, railing, vertical pipe etc. as per approved make; excavation in all type of soil and all other works required for proper and complete construction of OHT, testing of tank for water tightness as per the satisfaction of Engineer In-Charge. |
| 96 | Zone 3, 1850Kl Capacity/20M staging |
| 97 | Zone 4, 1700Kl Capacity/20M staging |
| 98 | Zone 5, 1650Kl Capacity/20M staging |
| 99 | Zone 6, 1350Kl Capacity/20M staging |
| 100 | RENOVATION OF RCC OVERHEAD TANK |
| 101 | Renovation of OHT at zone 1, 1100 kl/18M |
| 102 | Renovation of OHT at zone 2, 1650 kl/20M |
| 103 | CONSTRUCTION OF NEW BOUNDARY WALL, APPROACH ROAD AND GATE |
| 104 | Construction of boundary wall around pumphouse and O.H.T as per type design including supply of all Materials, Labour, Tools and Plants etc. complete. |
| 105 | Supply & fixing of 3.60 M wide MS Gate including fabrication and supply of steel and construction of boundary pillars all complete. |
| 106 | Supply and fixing of 1.2M wide MS Wicket gate including fabricationand supply of steel and construction of boundary pillars all complete. |
| 107 | Supply Earth filling in plingth including filling, dressing and ramming earth or sand or bajari or ballast or kankar or shingle. |
| 108 | Construction of interlocking approach road with both side brick Eadge and earth filling including supply of all materials, labour, tools and plants etc. complete. |
| 109 | Construction of drain |
| 110 | Water recharge mechanism within the water works campus |
| 111 | E/M WORKS |
| 112 | For Zone- 1 |
| 113 | Transportation of Rig Machine & its T&P/equipment\"s to the site of work including loading & unloading, baricating, erection & dismantling etc. |
| 114 | Transportation of Air Compressor and its T&P including loading & unloading, erection & dismantling etc. |
| 115 | Transportation of OP Unit and its T&P including loading & unloading. erection &dismantling etc. |
| 116 | Supply including loading & unloading of TW assembly of MSERW pipe. |
| 117 | 300mm dia size MSERW housing pipe 7.1mm thick including with 1 no 300 X 200mm dia M.S reducer 16mm thick, 1 noM.S. well cap 12mm thick ,10 no M.S. ring 100X12mm thick, M.S. S/I clamp ,T.W. Support (I Section) etc complete in all respect . |
| 118 | 200mm dia MSERW 7.1mm thick plain /slotted pipe including with 20 no M.S ring 100X12mmthick , 1 noM.S. bail plug , 8 no center guide etc comp in all respect. |
| 119 | Drilling of Bore (Including water arrangement) |
| 120 | Logging of Bore |
| 121 | Drilling of 600mm dia bore from G.L. to 65 m BGL. |
| 122 | Drilling of 500mm dia bore from 65m BGL to 100m BGL. |
| 123 | Drilling of 500mm dia bore from 100m BGL to165m BGL. |
| 124 | Welding and lowering of TW Assembly (including electrodes welding set and generator etc. required for completion of work) as per following : Lowering of 300mm X 200mm dia (tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 150m BGL. |
| 125 | Lowering of 300mm dia MSERW 7.1mm thick plain pipe from GL to 60 m BGL. |
| 126 | Lowering of 200mm die MSERW plain/slotted pipe 7.1mm thick from 60 m BGL to 100m BGL. |
| 127 | Lowering of 200mm dia MSERW plain/slotted pipe 7.1mm thick from 100m BGL to 150m BGL. |
| 128 | Supply of Pea Gravel Size 1.6mm to 4.80mm of Lalkuwan quarry duly screened , washed and proper stacking at site. |
| 129 | Development of \"Tubewell |
| 130 | Cutting of T.W. cover by gas cutter, re-welding of T.W. cover by Electric welding after complete development of work. |
| 131 | By Air compressor of 250 PSI capacity including T&P, labour and material required for completion of work. |
| 132 | Cutting of T.W. cover by gas cutter, re-welding of T.W. cover by Electric welding after complete development of work. |
| 133 | By OP Unit of Sutaible capacity including T&P, labour and material required for completion of work. |
| 134 | Chemical and bacteriological test |
| 135 | Miscellaneous work of T/W e.g vehicle for watch & ward during construction period, safety, baricadding and other site arrangements |
| 136 | Supply, Inatallation, Commissioning & Testing of Pumping Plant,Chlorinating Plant & Stabilizer |
| 137 | 1200 LPM, 58m head 2900rpm, 25 H.P. submersible clear water pumping plant suitable to operate on 415+ %5 volt, 50 Hz, 3 phase A.C. supply (as per IS 8034-1989). |
| 138 | Main piping and valves of 150 MM dia 5.4 mm thick M.S. column pipe 30m,D/F Pipe 1.0m long 01 No.,D/F Pipe 1.5m long 02 No., D/F Bend 01 No., A/F Tee, 01 No. D/F Sluice Valve 2 No., D/F Reflex Valve 1No., Enlarger / Reducer 1 No, Gauges with air line fittings, Earthing material, tool kit, 2 Ton Chain pully block, SCADA Compatable Chlorinating Systeme, Internal Electrification of pump house, Painting etc. |
| 139 | Fully automatic ServoVoltage Stabilizer having capacity40 KVA fully copper winding 3- phase A.C. Supply 50 Hz.input voltage 90-150 V output voltage 360 - 440 V with T/F oil ,power cable & earthing etc.complete in all respect. |
| 140 | Supply & Installation of sutable sizearmoured cable including lugs itc. Complete works. |
| 141 | CE / UL certified Intelligent smart energy meter |
| 142 | Motor OperatedActuator without Sluice Valve (150mm) |
| 143 | CE / UL certified Electromagneticflowmeter of size:150mm |
| 144 | Digital Soft starter (22 KW) |
| 145 | Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (125 Amps) |
| 146 | CE / UL certified Hydrostatatic type sub soil water level transmitter |
| 147 | CE / UL certified Pressure Transmitter |
| 148 | Complete Cabling for tubewell including all power & control cables of all equipment at pumphouse and OHT |
| 149 | Required Equipments & Instrumentation to be installed at Existing TW |
| 150 | SCADA compatable chlorinatingSystem |
| 151 | Supply & Erection of Servo Stabilizer of 40 KVA |
| 152 | CE / UL certified Intelligent smart energy meter |
| 153 | Motor OperatedActuator without Sluice Valve (150mm) |
| 154 | CE / UL certified Electromagneticflowmeter of size:150mm |
| 155 | Digital Soft starter (22 KW) |
| 156 | Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (125 Amps) |
| 157 | CE / UL certified Hydrostatatic type sub soil water level transmitter |
| 158 | CE / UL certified Pressure Transmitter |
| 159 | Complete Cabling for tubewell including all power & control cables of all equipment at pumphouse and OHT |
| 160 | RequiredEquipment to be installed atOHT |
| 161 | Motor operated Sluice Valve with Actuator 350 mm Size |
| 162 | Electromagnetic Flowmeter of 350 mm Size |
| 163 | Cost of Cutting outlet pipe & Installation of Flowmeter of 350 mm. |
| 164 | Trial & Run of pumping plant |
| 165 | Three Month Trial & Run, handing over of T/W, Pumping plant, accessorieswithSodium hypochloride solution, vehicle, watch & ward . |
| 166 | SUPPLY ,INSTALLATION TESTING & COMMISSIONINGOF SCADA FOR NEW/ EXISTINGT/W & OHT |
| 167 | Fully Automation of T/W through SCADA complete in all respect including mobile based app development and interconnection with MCS and Central Control Room Lucknow. |
| 168 | Automation ofOHTincluding automation of interconnected tubewells, Level sensors etc. |
| 169 | For Zone- 2 |
| 170 | Required Equipments & Instrumentation to be installed at Existing TW |
| 171 | SCADA compatable chlorinatingSystem |
| 172 | Supply & Erection of Servo Stabilizer of 40 KVA |
| 173 | CE / UL certified Intelligent smart energy meter |
| 174 | Motor OperatedActuator without Sluice Valve (150mm) |
| 175 | CE / UL certified Electromagneticflowmeter of size:150mm |
| 176 | Digital Soft starter (22 KW) |
| 177 | Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (125 Amps) |
| 178 | CE / UL certified Hydrostatatic type sub soil water level transmitter |
| 179 | CE / UL certified Pressure Transmitter |
| 180 | Complete Cabling for tubewell including all power & control cables of all equipment at pumphouse and OHT |
| 181 | RequiredEquipment to be installed atOHT |
| 182 | Motor operated Sluice Valve with Actuator 400 mm Size |
| 183 | Electromagnetic Flowmeter of 400 mm Size |
| 184 | Cost of Cutting outlet pipe & Installation of Flowmeter of 400 mm. |
| 185 | Trial & Run of pumping plant |
| 186 | Three Month Trial & Run, handing over of T/W, Pumping plant, accessorieswithSodium hypochloride solution, vehicle, watch & ward . |
| 187 | SUPPLY, INSTALLATION TESTING & COMMISSIONINGOF SCADA FOR EXISTING T/W & OHT |
| 188 | Fully Automation of T/W through SCADA complete in all respect including mobile based app development and interconnection with MCS and Central Control Room Lucknow. |
| 189 | Automation ofOHTincluding automation of interconnected tubewells, Level sensors etc. |
| 190 | For Zone- 3 |
| 191 | Transportation of Rig Machine & its T&P/equipment\"s to the site of work including loading & unloading, baricating, erection & dismantling etc. |
| 192 | Transportation of Air Compressor and its T&P including loading & unloading, erection & dismantling etc. |
| 193 | Transportation of OP Unit and its T&P including loading & unloading. erection &dismantling etc. |
| 194 | Supply including loading & unloading of TW assembly of MSERW pipe. |
| 195 | 300mm dia size MSERW housing pipe 7.1mm thick including with 1 no 300 X 200mm dia M.S reducer 16mm thick, 1 noM.S. well cap 12mm thick ,10 no M.S. ring 100X12mm thick, M.S. S/I clamp ,T.W. Support (I Section) etc comp in all respect . |
| 196 | 200mm dia MSERW 7.1mm thick plain /slotted pipe including with 20 no M.S ring 100X12mmthick , 1 noM.S. bail plug , 8 no center guide etc complete in all respect. |
| 197 | Drilling of Bore (Including water arrangement) |
| 198 | Logging of Bore |
| 199 | Drilling of 600mm dia bore from G.L. to 65 m BGL. |
| 200 | Drilling of 500mm dia bore from 65m BGL to 100m BGL. |
| 201 | Drilling of 500mm dia bore from 100m BGL to165m BGL. |
| 202 | Welding and lowering of TW Assembly (including electrodes welding set and generator etc. required for completion of work) as per following : Lowering of 300mm X 200mm dia (tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 150m BGL. |
| 203 | Lowering of 300mm dia MSERW 7.1mm thick plain pipe from GL to 60 m BGL. |
| 204 | Lowering of 200mm die MSERW plain/slotted pipe 7.1mm thick from 60 m BGL to 100m BGL. |
| 205 | Lowering of 200mm dia MSERW plain/slotted pipe 7.1mm thick from 100m BGL to 150m BGL. |
| 206 | Supply of Pea Gravel Size 1.6mm to 4.80mm of Lalkuwan quarry duly screened , washed and proper stacking at site. |
| 207 | Development of \"Tubewell |
| 208 | Cutting of T.W. cover by gas cutter, re-welding of T.W. cover by Electric welding after complete development of work. |
| 209 | By Air compressor of 250 PSI capacity including T&P, labour and material required for completion of work. |
| 210 | Cutting of T.W. cover by gas cutter, re-welding of T.W. cover by Electric welding after complete development of work. |
| 211 | By OP Unit of Sutaible capacity including T&P, labour and material required for completion of work. |
| 212 | Chemical and bacteriological test |
| 213 | Miscellaneous work of T/W e.g vehicle for watch & ward during construction period, safety, baricadding and other site arrangements |
| 214 | Supply, Inatallation, Commissioning & Testing of Pumping Plant,Chlorinating Plant & Stabilizer |
| 215 | 1200 LPM, 58m head 2900rpm, 25 H.P. submersible clear water pumping plant suitable to operate on 415+ %5 volt, 50 Hz, 3 phase A.C. supply (as per IS 8034-1989). |
| 216 | Main piping and valves of 150 MM dia 5.4 mm thick M.S. column pipe 30m,D/F Pipe 1.0m long 01 No.,D/F Pipe 1.5m long 02 No., D/F Bend 01 No., A/F Tee, 01 No. D/F Sluice Valve 2 No., D/F Reflex Valve 1No., Enlarger / Reducer 1 No, Gauges with air line fittings, Earthing material, tool kit, 2 Ton Chain pully block, SCADA Compatable Chlorinating Systeme, Internal Electrification of pump house, Painting etc. |
| 217 | Fully automatic ServoVoltage Stabilizer having capacity40 KVA fully copper winding 3- phase A.C. Supply 50 Hz.input voltage 90-150 V output voltage 360 - 440 V with T/F oil ,power cable & earthing etc.complete in all respect. |
| 218 | Supply & Installation of sutable sizearmoured cable including lugs itc. Complete works. |
| 219 | CE / UL certified Intelligent smart energy meter |
| 220 | Motor OperatedActuator without Sluice Valve (150mm) |
| 221 | CE / UL certified Electromagneticflowmeter of size:150mm |
| 222 | Digital Soft starter (22 KW) |
| 223 | Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (125 Amps) |
| 224 | CE / UL certified Hydrostatatic type sub soil water level transmitter |
| 225 | CE / UL certified Pressure Transmitter |
| 226 | Complete Cabling for tubewell including all power & control cables of all equipment at pumphouse and OHT |
| 227 | Required Equipments & Instrumentation to be installed at Existing TW |
| 228 | SCADA compatable chlorinatingSystem |
| 229 | Supply & Erection of Servo Stabilizer of 40 KVA |
| 230 | CE / UL certified Intelligent smart energy meter |
| 231 | Motor OperatedActuator without Sluice Valve (150mm) |
| 232 | CE / UL certified Electromagneticflowmeter of size:150mm |
| 233 | Digital Soft starter (22 KW) |
| 234 | Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (125 Amps) |
| 235 | CE / UL certified Hydrostatatic type sub soil water level transmitter |
| 236 | CE / UL certified Pressure Transmitter |
| 237 | Complete Cabling for tubewell including all power & control cables of all equipment at pumphouse and OHT |
| 238 | RequiredEquipment to be installed atOHT |
| 239 | Motor operated Sluice Valve with Actuator 400 mm Size |
| 240 | Electromagnetic Flowmeter of 400 mm Size |
| 241 | Cost of Cutting outlet pipe & Installation of Flowmeter of 400 mm. |
| 242 | Trial & Run of pumping plant |
| 243 | Three Month Trial & Run, handing over of T/W, Pumping plant, accessorieswithSodium hypochloride solution, vehicle, watch & ward . |
| 244 | SUPPLY ,INSTALLATION TESTING & COMMISSIONINGOF SCADA FOR NEW/ ExistingT/W & OHT |
| 245 | Fully Automation of T/W through SCADA complete in all respect including mobile based app development and interconnection with MCS and Central Control Room Lucknow. |
| 246 | Automation ofOHTincluding automation of interconnected tubewells, Level sensors etc. |
| 247 | For Zone- 4 |
| 248 | Transportation of Rig Machine & its T&P/equipment\"s to the site of work including loading & unloading, baricating, erection & dismantling etc. |
| 249 | Transportation of Air Compressor and its T&P including loading & unloading, erection & dismantling etc. |
| 250 | Transportation of OP Unit and its T&P including loading & unloading. erection &dismantling etc. |
| 251 | Supply including loading & unloading of TW assembly of MSERW pipe. |
| 252 | 300mm dia size MSERW housing pipe 7.1mm thick including with 1 no 300 X 200mm dia M.S reducer 16mm thick, 1 noM.S. well cap 12mm thick ,10 no M.S. ring 100X12mm thick, M.S. S/I clamp ,T.W. Support (I Section) etc comp in all respect . |
| 253 | 200mm dia MSERW 7.1mm thick plain /slotted pipe including with 20 no M.S ring 100X12mmthick , 1 noM.S. bail plug , 8 no center guide etc complete in all respect. |
| 254 | Drilling of Bore (Including water arrangement) |
| 255 | Logging of Bore |
| 256 | Drilling of 600mm dia bore from G.L. to 65 m BGL. |
| 257 | Drilling of 500mm dia bore from 65m BGL to 100m BGL. |
| 258 | Drilling of 500mm dia bore from 100m BGL to165m BGL. |
| 259 | Welding and lowering of TW Assembly (including electrodes welding set and generator etc. required for completion of work) as per following : Lowering of 300mm X 200mm dia (tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 150m BGL. |
| 260 | Lowering of 300mm dia MSERW 7.1mm thick plain pipe from GL to 60 m BGL. |
| 261 | Lowering of 200mm die MSERW plain/slotted pipe 7.1mm thick from 60 m BGL to 100m BGL. |
| 262 | Lowering of 200mm dia MSERW plain/slotted pipe 7.1mm thick from 100m BGL to 150m BGL. |
| 263 | Supply of Pea Gravel Size 1.6mm to 4.80mm of Lalkuwan quarry duly screened , washed and proper stacking at site. |
| 264 | Development of \"Tubewell |
| 265 | Cutting of T.W. cover by gas cutter, re-welding of T.W. cover by Electric welding after complete development of work. |
| 266 | By Air compressor of 250 PSI capacity including T&P, labour and material required for completion of work. |
| 267 | Cutting of T.W. cover by gas cutter, re-welding of T.W. cover by Electric welding after complete development of work. |
| 268 | By OP Unit of Sutaible capacity including T&P, labour and material required for completion of work. |
| 269 | Chemical and bacteriological test |
| 270 | Miscellaneous work of T/W e.g vehicle for watch & ward during construction period, safety, baricadding and other site arrangements |
| 271 | Supply, Inatallation, Commissioning & Testing of Pumping Plant,Chlorinating Plant & Stabilizer |
| 272 | 1200 LPM, 58m head 2900rpm, 25 H.P. submersible clear water pumping plant suitable to operate on 415+ %5 volt, 50 Hz, 3 phase A.C. supply (as per IS 8034-1989). |
| 273 | Main piping and valves of 150 MM dia 5.4 mm thick M.S. column pipe 30m,D/F Pipe 1.0m long 01 No.,D/F Pipe 1.5m long 02 No., D/F Bend 01 No., A/F Tee 01 No., D/F Sluice Valve 2 No., D/F Reflex Valve 1No., Enlarger / Reducer 1 No, Gauges with air line fittings, Earthing material, tool kit, 2 Ton Chain pully block, SCADA Compatable Chlorinating Systeme, Internal Electrification of pump house, Painting etc. |
| 274 | Fully automatic ServoVoltage Stabilizer having capacity40 KVA fully copper winding 3- phase A.C. Supply 50 Hz.input voltage 90-150 V output voltage 360 - 440 V with T/F oil ,power cable & earthing etc.complete in all respect. |
| 275 | Supply & Installation of sutable sizearmoured cable including lugs itc. Complete works. |
| 276 | CE / UL certified Intelligent smart energy meter |
| 277 | Motor OperatedActuator without Sluice Valve (150mm) |
| 278 | CE / UL certified Electromagneticflowmeter of size:150mm |
| 279 | Digital Soft starter (22 KW) |
| 280 | Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (125 Amps) |
| 281 | CE / UL certified Hydrostatatic type sub soil water level transmitter |
| 282 | CE / UL certified Pressure Transmitter |
| 283 | Complete Cabling for tubewell including all power & control cables of all equipment at pumphouse and OHT |
| 284 | RequiredEquipment to be installed atOHT |
| 285 | Motor operated Sluice Valve with Actuator 400 mm Size |
| 286 | Electromagnetic Flowmeter of 400 mm Size |
| 287 | Cost of Cutting outlet pipe & Installation of Flowmeter of 400 mm. |
| 288 | Trial & Run of pumping plant |
| 289 | Three Month Trial & Run, handing over of T/W, Pumping plant, accessorieswithSodium hypochloride solution, vehicle, watch & ward . |
| 290 | SUPPLY, INSTALLATION TESTING & COMMISSIONINGOF SCADA FOR NEW T/W & OHT |
| 291 | Fully Automation of T/W through SCADA complete in all respect including mobile based app development and interconnection with MCS and Central Control Room Lucknow. |
| 292 | Automation ofOHTincluding automation of interconnected tubewells, Level sensors etc. |
| 293 | For Zone- 5 |
| 294 | Transportation of Rig Machine & its T&P/equipment\"s to the site of work including loading & unloading, baricating, erection & dismantling etc. |
| 295 | Transportation of Air Compressor and its T&P including loading & unloading, erection & dismantling etc. |
| 296 | Transportation of OP Unit and its T&P including loading & unloading. erection &dismantling etc. |
| 297 | Supply including loading & unloading of TW assembly of MSERW pipe. |
| 298 | 300mm dia size MSERW housing pipe 7.1mm thick including with 1 no 300 X 200mm dia M.S reducer 16mm thick, 1 noM.S. well cap 12mm thick ,10 no M.S. ring 100X12mm thick, M.S. S/I clamp ,T.W. Support (I Section) etc comp in all respect . |
| 299 | 200mm dia MSERW 7.1mm thick plain /slotted pipe including with 20 no M.S ring 100X12mmthick , 1 noM.S. bail plug , 8 no center guide etc complete in all respect. |
| 300 | Drilling of Bore (Including water arrangement) |
| 301 | Logging of Bore |
| 302 | Drilling of 600mm dia bore from G.L. to 65 m BGL. |
| 303 | Drilling of 500mm dia bore from 65m BGL to 100m BGL. |
| 304 | Drilling of 500mm dia bore from 100m BGL to165m BGL. |
| 305 | Welding and lowering of TW Assembly (including electrodes welding set and generator etc. required for completion of work) as per following : Lowering of 300mm X 200mm dia (tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 150m BGL. |
| 306 | Lowering of 300mm dia MSERW 7.1mm thick plain pipe from GL to 60 m BGL. |
| 307 | Lowering of 200mm die MSERW plain/slotted pipe 7.1mm thick from 60 m BGL to 100m BGL. |
| 308 | Lowering of 200mm dia MSERW plain/slotted pipe 7.1mm thick from 100m BGL to 150m BGL. |
| 309 | Supply of Pea Gravel Size 1.6mm to 4.80mm of Lalkuwan quarry duly screened , washed and proper stacking at site. |
| 310 | Development of \"Tubewell |
| 311 | Cutting of T.W. cover by gas cutter, re-welding of T.W. cover by Electric welding after complete development of work. |
| 312 | By Air compressor of 250 PSI capacity including T&P, labour and material required for completion of work. |
| 313 | Cutting of T.W. cover by gas cutter, re-welding of T.W. cover by Electric welding after complete development of work. |
| 314 | By OP Unit of Sutaible capacity including T&P, labour and material required for completion of work. |
| 315 | Chemical and bacteriological test |
| 316 | Miscellaneous work of T/W e.g vehicle for watch & ward during construction period, safety, baricadding and other site arrangements |
| 317 | Supply, Inatallation, Commissioning & Testing of Pumping Plant,Chlorinating Plant & Stabilizer |
| 318 | 1200 LPM, 58m head 2900rpm, 25 H.P. submersible clear water pumping plant suitable to operate on 415+ %5 volt, 50 Hz, 3 phase A.C. supply (as per IS 8034-1989). |
| 319 | Main piping and valves of 150 MM dia 5.4 mm thick M.S. column pipe 30m,D/F Pipe 1.0m long 01 No.,D/F Pipe 1.5m long 02 No., D/F Bend 01 No, A/F Tee 01 No,D/F Sluice Valve 2 No., D/F Reflex Valve 1No., Enlarger / Reducer 1 No, Gauges with air line fittings, Earthing material, tool kit, 2 Ton Chain pully block, SCADA Compatable Chlorinating Systeme, Internal Electrification of pump house, Painting etc. |
| 320 | Fully automatic ServoVoltage Stabilizer having capacity40 KVA fully copper winding 3- phase A.C. Supply 50 Hz.input voltage 90-150 V output voltage 360 - 440 V with T/F oil ,power cable & earthing etc.complete in all respect. |
| 321 | Supply & Installation of sutable sizearmoured cable including lugs itc. Complete works. |
| 322 | CE / UL certified Intelligent smart energy meter |
| 323 | Motor OperatedActuator without Sluice Valve (150mm) |
| 324 | CE / UL certified Electromagneticflowmeter of size:150mm |
| 325 | Digital Soft starter (22 KW) |
| 326 | Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (125 Amps) |
| 327 | CE / UL certified Hydrostatatic type sub soil water level transmitter |
| 328 | CE / UL certified Pressure Transmitter |
| 329 | Complete Cabling for tubewell including all power & control cables of all equipment at pumphouse and OHT |
| 330 | RequiredEquipment to be installed atOHT |
| 331 | Motor operated Sluice Valve with Actuator 400 mm Size |
| 332 | Electromagnetic Flowmeter of 400 mm Size |
| 333 | Cost of Cutting outlet pipe & Installation of Flowmeter of 400 mm. |
| 334 | Trial & Run of pumping plant |
| 335 | Three Month Trial & Run, handing over of T/W, Pumping plant, accessorieswithSodium hypochloride solution, vehicle, watch & ward . |
| 336 | SUPPLY, INSTALLATION TESTING & COMMISSIONINGOF SCADA FOR NEW T/W & OHT |
| 337 | Fully Automation of T/W through SCADA complete in all respect including mobile based app development and interconnection with MCS and Central Control Room Lucknow. |
| 338 | Automation ofOHTincluding automation of interconnected tubewells, Level sensors etc. |
| 339 | For Zone- 6 |
| 340 | Transportation of Rig Machine & its T&P/equipment\"s to the site of work including loading & unloading, baricating, erection & dismantling etc. |
| 341 | Transportation of Air Compressor and its T&P including loading & unloading, erection & dismantling etc. |
| 342 | Transportation of OP Unit and its T&P including loading & unloading. erection &dismantling etc. |
| 343 | Supply including loading & unloading of TW assembly of MSERW pipe. |
| 344 | 300mm dia size MSERW housing pipe 7.1mm thick including with 1 no 300 X 200mm dia M.S reducer 16mm thick, 1 noM.S. well cap 12mm thick ,10 no M.S. ring 100X12mm thick, M.S. S/I clamp ,T.W. Support (I Section) etc comp in all respect . |
| 345 | 200mm dia MSERW 7.1mm thick plain /slotted pipe including with 20 no M.S ring 100X12mmthick , 1 noM.S. bail plug , 8 no center guide etc complete in all respect. |
| 346 | Drilling of Bore (Including water arrangement) |
| 347 | Logging of Bore |
| 348 | Drilling of 600mm dia bore from G.L. to 65 m BGL. |
| 349 | Drilling of 500mm dia bore from 65m BGL to 100m BGL. |
| 350 | Drilling of 500mm dia bore from 100m BGL to165m BGL. |
| 351 | Welding and lowering of TW Assembly (including electrodes welding set and generator etc. required for completion of work) as per following : Lowering of 300mm X 200mm dia (tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 150m BGL. |
| 352 | Lowering of 300mm dia MSERW 7.1mm thick plain pipe from GL to 60 m BGL. |
| 353 | Lowering of 200mm die MSERW plain/slotted pipe 7.1mm thick from 60 m BGL to 100m BGL. |
| 354 | Lowering of 200mm dia MSERW plain/slotted pipe 7.1mm thick from 100m BGL to 150m BGL. |
| 355 | Supply of Pea Gravel Size 1.6mm to 4.80mm of Lalkuwan quarry duly screened , washed and proper stacking at site. |
| 356 | Development of \"Tubewell |
| 357 | Cutting of T.W. cover by gas cutter, re-welding of T.W. cover by Electric welding after complete development of work. |
| 358 | By Air compressor of 250 PSI capacity including T&P, labour and material required for completion of work. |
| 359 | Cutting of T.W. cover by gas cutter, re-welding of T.W. cover by Electric welding after complete development of work. |
| 360 | By OP Unit of Sutaible capacity including T&P, labour and material required for completion of work. |
| 361 | Chemical and bacteriological test |
| 362 | Miscellaneous work of T/W e.g vehicle for watch & ward during construction period, safety, baricadding and other site arrangements |
| 363 | Supply, Inatallation, Commissioning & Testing of Pumping Plant,Chlorinating Plant & Stabilizer |
| 364 | 1000 LPM, 58m head 2900rpm, 25 H.P. submersible clear water pumping plant suitable to operate on 415+ %5 volt, 50 Hz, 3 phase A.C. supply (as per IS 8034-1989). |
| 365 | Main piping and valves of 100 MM dia 5.4 mm thick M.S. column pipe 30m,D/F Pipe 1.0m long 01 No.,D/F Pipe 1.5m long 02 No., D/F Bend 01 No, A/F Tee 01 No, D/F Sluice Valve 2 No., D/F Reflex Valve 1No., Enlarger / Reducer 1 No, Gauges with air line fittings, Earthing material, tool kit, 2 Ton Chain pully block, SCADA Compatable Chlorinating Systeme, Internal Electrification of pump house, Painting etc. |
| 366 | Fully automatic ServoVoltage Stabilizer having capacity40 KVA fully copper winding 3- phase A.C. Supply 50 Hz.input voltage 90-150 V output voltage 360 - 440 V with T/F oil ,power cable & earthing etc.complete in all respect. |
| 367 | Supply & Installation of sutable sizearmoured cable including lugs itc. Complete works. |
| 368 | CE / UL certified Intelligent smart energy meter |
| 369 | Motor OperatedActuator without Sluice Valve (150mm) |
| 370 | CE / UL certified Electromagneticflowmeter of size:150mm |
| 371 | Digital Soft starter (22 KW) |
| 372 | Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (125 Amps) |
| 373 | CE / UL certified Hydrostatatic type sub soil water level transmitter |
| 374 | CE / UL certified Pressure Transmitter |
| 375 | Complete Cabling for tubewell including all power & control cables of all equipment at pumphouse and OHT |
| 376 | RequiredEquipment to be installed atOHT |
| 377 | Motor operated Sluice Valve with Actuator 400 mm Size |
| 378 | Electromagnetic Flowmeter of 400 mm Size |
| 379 | Cost of Cutting outlet pipe & Installation of Flowmeter of 400 mm. |
| 380 | Trial & Run of pumping plant |
| 381 | Three Month Trial & Run, handing over of T/W, Pumping plant, accessorieswithSodium hypochloride solution, vehicle, watch & ward . |
| 382 | SUPPLY, INSTALLATION TESTING & COMMISSIONINGOF SCADA FOR NEW T/W & OHT |
| 383 | Fully Automation of T/W through SCADA complete in all respect including mobile based app development and interconnection with MCS and Central Control Room Lucknow. |
| 384 | Automation ofOHTincluding automation of interconnected tubewells, Level sensors etc. |
| 385 | SUPPLY, INSTALLATION TESTING & COMMISSIONINGOF SCADA MCS (MASTER CONROL STATION) FOR ZONE- 01 TO 6 |
| 386 | SCADA MCS (MASTER CONROL STATION) Complete in all respect. |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail