| 1 | Excavation of Trench and laying of ductThe cost of Excavation of trench up to depth as mentioned for various soil types, as per the specification given in tender, backfilling with the excavated soil is covered under this head. This includes clearance ofany physical obstacle on the route such as bushes, roots, stacking ofstone chips, ballast or heap of sand/soil etc, preparation of OFC etc.As per technical specification in tender |
| 2 | Blowing of OFC in HDPE DuctThe cost ofOFC blowing/ pulling in HDPE duct is covered under this head & backfilling work is covered under this head.As per technical specification in tender |
| 3 | Laying of HDPE duct through HDDThe cost ofinstalling/ laying HDPE duct via HDD method is covered under this head. Job shall be done as per the methodology mentioned in tender document.As per technical specification in tender |
| 4 | Supply and Installation of RCC Joint PitThe cost of supplying and installing/ laying RCC joint pit for housing OFC joint closures is covered under this head |
| 5 | Splicing of 24 FibresThe cost of splicing 24 Fibres is covered under this head.As per technical specification in tender |
| 6 | Termination of 24 F OFC in FTCThe cost of termination and dressing of 24F OFC inside FTC including supply of FTC is covered under this head ,Borosl, IP,Koshama, Glass,Kharaz, UPL.As per technical specification in tender |
| 7 | Asphalt Road Cutting & Duct LayingThe cost of asphalt road cutting & HDPE Duct laying is covered under this head. It also includes the cost of restoration of the road which is cut for the purpose.As per technical specification in tender |
| 8 | Supply & installation of Gl pipeThe cost of supplying and installing/ laying GI pipe is covered under this head.As per technical specification in tender |
| 9 | Protection of Duct/ GI PipeThe cost of any kind of protection work such as PCC work at washout areas/ over GI pipe is covered under this head.As per technical specification in tender |
| 10 | Supply and installation of Stone Route MarkersThe cost of supplying and installing/ laying stone route markers for OFC is covered under this head. The route markers shall be as per the specification mentioned in Technical Specification |
| 11 | Roads PermissionNational Highways (NH) - for laying of OFC (Optical FiberCable),acrossandparallel to National Highways (within RoW of NH).State Highways (SH), other PWD roads ( ODR/MDR), Irrigation roads, roads under City Municipal Limit, rural roads etc. forlaying OFC, parallel to and Within RoW of respective crossing. |
| 12 | Railways PermissionObtaining crossing permission/NOC for laying ofOFC, across and parallel to Railway Track (within RoW of Railway Track) either in compositeapplication/proposal or separately for laying of pipeline and OFC as the case may be, as desired by the concerned authorities. |
| 13 | RFID Marker for Tracking of Joint Chamber.As per technical specification in tender |
| 14 | Supply of 24 F Armoured OFC Cable.As per technical specification in tender |
| 15 | Supply of 40 mm HDPE Duct.As per technical specification in tender |