}

Tender For Supply Installation Testing Commissioning Of Ict Networking Equipment For Usdma Building, dehradun-Uttarakhand

World Bank Group has published Tender For Supply Installation Testing Commissioning Of Ict Networking Equipment For Usdma Building. Submission Date for this Tender is 11-12-2023. CCTV System Tenders in dehradun Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

39131227
Corrigendum : Tender For Supply Installation Testing Commissioning Of Ict Networking Equipment For Usdma Building
Open Tender
Indian
Uttarakhand
Dehradun
11-12-2023

Tender Details

Supply Installation Testing Commissioning Of Ict Networking Equipment For Usdma Building , Core Network Switches , Supply Installation Testing Commissioning Of Core Switch Having 48 X 1 / 10G / 25G Ports Fiber Ports Should Have6 X 40 / 100G Qsfp+ Ports, 32Gb Dram And 64Gb Flash Storage, 3.6 Tbpsswitching Capacity, Mac Addresses 90, 000 No. , Oem Support For Above Switch 5 Year , Supply Installation Testing Commissioning Of Sfp+ Module For 10G , Access Network Switches - Data, Phones, Wifi & Cctv , Supply, Installation, Testing & Commissioning Of Access Switch 24 Port Non- Poe, Access Switches With Switching Capacity Of 128 Gbps, Forwarding Performance 95 Mpps, Having24 X 10 / 100 / 1000Base-Tand 4 X 10G Sfp+ Uplink Ports, Should Have Support For 8 Switch Stacking Withbandwidth Of Minimum 80 Gbps Or More. , Oem Support For Above Switch 5 Year , Supply, Installation, Testing & Commissioning Ofaccess Switch 48 Port Poe Access Switches With Switching Capacity Of 270 Gbps, Forwarding Performance 130 Mpps, Havingminimum 32 X 10 / 100 / 1000 Base-T, 16 X 1G / 2.5G Baset, 06 Poe Ports Each Supporting 30W Each And 4 X 1 / 10G Sfp+ Ports. Switch Should Have 1440W Of Poe Power Budget, Should Have Support For 8 Switchstacking Withbandwidth Of Minimum 160 Gbps. , Oem Support For Above Switch 5 Year , Supply, Installation, Testing & Commissioning Ofaccess Switch 48 Port Poe+ Access Switches With Switching Capacity Of 270 Gbps, Forwarding Performance 130 Mpps, Havingminimum 32 X 10 / 100 / 1000 Base-T, 16 X 1G / 2.5G Baset, 06 Poe+ Ports Each Supporting Up To 60W And 4 X 1 / 10G Sfp+ Ports, Switch Should Have 1440W Of Poe Power Budget, Should Have Support For 8 Switchstacking Withbandwidth Of Minimum 160 Gbps. , Oem Support For Above Switch 5 Year , Wifi , Supply, Installation, Testing & Commissioning Of Virtual Wireless Controller ( Software ) With 10Gbps Of Throughput Dedicated Hardware Appliance, Purpose Built For Wi-Fi Control And Management, Should Support Min 200 Ap. , Supply, Installation, Testing & Commissioning Of Wireless Indoor Access Point Combined Data Rate Supportdual 5Ghz : 4.8Gbps , 802.11Ax, 2.4 Ghz / 5Ghz. , Ucs Telephony System , Supply, Installation, Testing & Commissioning Of Virtual Appliance Based ( Software ) Voip System Support Up To 1000 Sip Phones And 50 Analogue Phones ( Redundant Soft Server In Active – Active Mode ) ; To Be Supplied With Two Sets Of Zonal Paging And Roip Cards , Supply, Installation, Testing & Commissioning Of Wired Head Sets , Supply, Installation, Testing & Commissioning Of Wireless Head Sets , Supply, Installation, Testing & Commissioning Of Unified Communication ( Uc ) System With Softphone Support And 250 User Licenses , Supply, Installation, Testing & Commissioning Of Basic Sip Phones , Supply, Installation, Testing & Commissioning Of Type-Ii Sip Phone , Supply, Installation, Testing & Commissioning Of Vip ( Premium ) Sip Telephone , Supply, Installation, Testing & Commissioning Of Pc Basedconsole For Operator , Supply, Installation, Testing & Commissioning Of Analogue Phones With Display. , Supply, Installation, Testing & Commissioning Of Wall Hung Analogue Phones. , Two Way Walkie Talkie For Security Communications , Router , Supply, Installation, Testing & Commissioning Of Standalone / Modularrouter, 19 Rack Mountable. Router Should Have At Least 6 X 1G Rj-45 And 4 X 1 / 10G Sfp Ports Supporting Both Lan And Wan Protocols From Day 1 And 5 Year Support. , Supply, Installation, Testing & Commissioning Of Ac Power Supply For Internet Router , Utm Cum Firewall ( Ha Mode ) , Supply, Installation, Testing & Commissioning Of Utm Firewall With 4 X 10G Sfp+ Ports, 8X 1G Ports. The Device Should Have 9Gbps Of Firewall Throughput And 1.5 Gbps Of Ngfw Throughput. 4 Gbps Ips Throughput, 3 Gbps Of Ipsec Vpn With 1500 Vpn Tunnels Support. Should Have Min 16Gb Internal Dram. Should Have Redundant Power Supply. ( 500 User ) , Nac ( Ha Mode ) , Supply, Installation, Testing & Commissioning Of Nac For 500 Users As Per Specifications In Ha Mode. , Manpower Cost For Managing The Entire Network , Ict & Communications Expert For Operations And Maintenance Of The Systems For 24X7 Operations For 5 Years

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 02-12-2023 change date Date 11-12-2023
2 04-10-2023 Extension of date Date 25-10-2023
3 09-11-2023 Change Date Date 28-11-2023
4 16-09-2023 Date Change Date 12-10-2023
5 18-10-2023 Deadline extension Date 06-11-2023
6 18-11-2023 Revised BOQ BOQ 04-12-2023
7 18-11-2023 date extension Date 04-12-2023
8 21-08-2023 Information regarding prebid meeting Other 27-09-2023
9 28-10-2023 Extension of Dates Date 16-11-2023
10 30-11-2023 Addendum Other 04-12-2023

Key Value

Document Fees
INR 5000 /-
EMD
INR 1300000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail