Amrut-Amrut 2.0 - Swap- 2 -Uwss To Kattappana Municipality Providing Functional Household Tap Connections To Households-Pipeline Work-2 100.98.240:Supply Of Pvc Pipe, 10Kg / Cm2, 200Mm Dia. 3 Od188348 / 2022-2023: Supply Of Specials For Pvc Pipe, 10Kg / Cm2, 200Mm Dia 4 100.98.227:Supply Of Pvc Pipe, 8Kg / Cm2, 200Mm Dia. 5 Od188378 / 2022-2023:Supply Of Specials For Pvc Pipe, 8Kg / Cm2, 200Mm Dia 6 100.98.217:Supply Of Pvc Pipe, 6Kg / Cm2, 200Mm Dia. 7 Od188382 / 2022-2023:Supply Of Specials For Pvc Pipe, 6Kg / Cm2, 200Mm Dia 8 100.98.239:Supply Of Pvc Pipe, 10Kg / Cm2, 160Mm Dia. 9 Od188367 / 2022-2023:Supply Of Specials For Pvc Pipe, 10Kg / Cm2, 160Mm Dia 10 100.98.226:Supply Of Pvc Pipe, 8Kg / Cm2, 160Mm Dia. 11 Od188386 / 2022-2023:Supply Of Specials For Pvc Pipe, 8Kg / Cm2, 160Mm Dia 12 100.98.238:Supply Pvc Pipe, 10Kg / Cm2, 140Mm Dia. 13 Od188389 / 2022-2023:Supply Of Specials For Pvc Pipe, 10Kg / Cm2, 140Mm Dia 14 100.98.237:Supply Of Pvc Pipe, 10Kg / Cm2, 110Mm Dia. 15 Od188397 / 2022-2023:Supply Of Specials For Pvc Pipe, 10Kg / Cm2, 110Mm Dia 16 100.98.222:Supply Of Pvc Pipe, 8Kg / Cm2, 75Mm Dia. 17 Od188409 / 2022-2023:Supply Of Specials For Pvc Pipe, 8Kg / Cm2, 75Mm Dia 18 100.98.212:Supply Of Pvc Pipe, 6Kg / Cm2, 75Mm Dia. 19 Od188413 / 2022-2023:Supply Of Specials For Pvc Pipe, 6Kg / Cm2, 75Mm Dia 20 100.98.221:Supply Of Pvc Pipe, 8Kg / Cm2, 63Mm Dia. 21 Od188418 / 2022-2023:Supply Of Specials For Pvc Pipe, 8Kg / Cm2, 63Mm Dia 22 100.98.211:Supply Of Pvc Pipe, 6Kg / Cm2, 63Mm Dia. 23 Od188429 / 2022-2023:Supply Of Specials For Pvc Pipe, 6Kg / Cm2, 63Mm Dia 24 100.98.220:Supply Of Pvc Pipe, 8Kg / Cm2, 50Mm Dia. 25 Od188444 / 2022-2023:Supply Of Specials For Pvc Pipe, 8Kg / Cm2, 50Mm Dia 26 Od77002 / 2022-2023:Supply Of Gi 150Mm Pipe ( M ) 27 Od188335 / 2022-2023: Specials For 150 Mm Gi Pipe ( 3% Of Total Cost For Pipe ) 28 Od77265 / 2022-2023:Supplying For 125 Mm G.I Pipe 29 Od188566 / 2022-2023:Specials For 125 Mm Gi Pipe 30 Od77000 / 2022-2023:Supply Of 100Mm G.I Pipe 31 Od188567 / 2022-2023:Specials For 100 Mm Gi Pipe ( 3% Of Total Cost For Pipe ) 32 100.98.458:Supply Of Ci Double Flanged Sluice Valve Conforming To Is 14846 - 2000, Sluice Valve With Cap Pn 1.6, Size 100Mm. 33 100.98.459:Supply Of Ci Double Flanged Sluice Valve Conforming To Is 14846 - 2000, Sluice Valve With Cap Pn 1.6, Size 125Mm. 34 100.98.460:Supply Of Ci Double Flanged Sluice Valve Conforming To Is 14846 - 2000, Sluice Valve With Cap Pn 1.6, Size 150Mm. 35 100.98.461:Supply Of Ci Double Flanged Sluice Valve Conforming To Is 14846 - 2000, Sluice Valve With Cap Pn 1.6, Size 200Mm. 36 100.98.440:Supply Of Ci Air Valve, Conforming To Is 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25Mm. 37 100.98.444:Supply Of Ci Air Valve, Conforming To Is 14848 - 2000, Single Orifice, Large Orifice Type S2, Size 50Mm. 38 Working Charges 39 100.12.11:Conveying And Fixing G.I. Pipes Complete With G.I. Fittings Including Trenching And Refilling Etc., But Excluding Cost Of Pipes And Fittings For External Work: 150Mm Diameter Nominal Bore. 40 100.12.10:Conveying And Fixing G.I. Pipes Complete With G.I. Fittings Including Trenching And Refilling Etc., But Excluding Cost Of Pipes And Fittings For External Work: 125Mm Diameter Nominal Bore. 41 100.12.9:Conveying And Fixing G.I. Pipes Complete With G.I. Fittings Including Trenching And Refilling Etc., But Excluding Cost Of Pipes And Fittings For External Work: 100Mm Diameter Nominal Bore. 42 18.12.8:Providing And Fixing G.I. Pipes Complete With G.I Fittings Including Trenching And Refilling Etc. External Work80 Mm Dia Nominal Bore 43 18.12.7:Providing And Fixing G.I. Pipes Complete With G.I Fittings Including Trenching And Refilling Etc. External Work65 Mm Dia Nominal Bore 44 18.12.6:Providing And Fixing G.I. Pipes Complete With G.I Fittings Including Trenching And Refilling Etc. External Work50 Mm Dia Nominal Bore 45 100.1.1:Excavating Trenches Of Required Width For Pipes, Cables, Etc., Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms, Depth Up To 1.5M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20Cm In Depth, Including Consolidating Each Deposited Layer By Ramming, Watering, Etc., And Disposing Of Surplus Excavated Soil As Directed, Within A Lead Of 50M, In All Kinds Of Soil. 46 100.1.5:Excavating Trenches Of Required Width For Pipes, Cables, Etc., Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms, Depth Up To 1.5M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20Cm In Depth, Including Consolidating Each Deposited Layer By Ramming, Watering, Etc., And Disposing Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M, In Ordinary Rock. 47 100.2.4:Excavating Trenches Of Required Width For Pipes, Cables, Etc., Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms, Depth Exceeding 1.5M But Not Exceeding 3M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20Cm In Depth, Including Consolidating Each Deposited Layer By Ramming, Watering, Etc., And Disposing Of Surplus Excavated Soil As Directed, Within A Lead Of 50M, In Medium Rock Requiring Blasting. 48 100.1.9:Excavating Trenches Of Required Width For Pipes, Cables, Etc., Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms, Depth Up To 1.5M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20Cm In Depth, Including Consolidating Each Deposited Layer By Ramming, Watering, Etc., And Disposing Of Surplus Excavated Soil As Directed, Within A Lead Of 50M, In Hard Rock Requiring Blasting. 49 100.8.1:Fencing One Side Of Trenches, 1.50M Height With Two Rows Of 10Cm Plastic Caution Tape In Vertical Casuarina Pole ( Girth 15Cm To 24Cm ) Fixed At 2M Intervals. 50 100.59.1:Cutting The Bituminous / Concrete Roads With Cutting Machine For A Minimum Depth Of 200Mm Along The Sides Of Proposed Alignment Of The Pipe To Be Laid Without Causing Any Damage To Other Utilities, Including The Charges For Hire And Conveyance Of Tools And Plant, Cost Of Consumables And Charges For Lighting, Watching, Ribbon Fencing, Caution Boards, Traffic Diversion, And As Per The Direction Of Departmental Officers Etc. Complete, Before Carrying Out The Demolition Of Bituminous / Concrete Road By Mechanical Means And Carrying Out The Excavation. 51 Od189791 / 2022-2023: Dismantling By Manually / By Mechanical Means And Disposal Of Materials With In 50 M Lead As Per Direction Of Engineers In Charge<>Bituminous Road 52 15.2.2:Demolishing Cement Concrete Manually / By Mechanical Means Including Disposal Of Material Within 50 Metres Lead As Per Direction Of Engineer - In-Charge.Nominal Concrete 1:4:8 Leaner Mix ( Including Equivalent Design Mix ) 53 100.9.5:Laying Upvc Pipes Of Class 2 To Class 6 And Specials, Lowering To The Trenches Already Made, Placing In Position Aligning The Pipeline To The Lines And Levels And Jointing The Pipes And Specials With Solvent Cement And Testing The Pipeline With Water To The Required Test Pressure ( Excluding Cost Of Pipes And Specials ) : 50 Mm Nominal Outside Diameter Pipes. 54 100.9.6:Laying Upvc Pipes Of Class 2 To Class 6 And Specials, Lowering To The Trenches Already Made, Placing In Position Aligning The Pipeline To The Lines And Levels And Jointing The Pipes And Specials With Solvent Cement And Testing The Pipeline With Water To The Required Test Pressure ( Excluding Cost Of Pipes And Specials ) : 63 Mm Nominal Outside Diameter Pipes. 55 100.9.7:Laying Upvc Pipes Of Class 2 To Class 6 And Specials, Lowering To The Trenches Already Made, Placing In Position Aligning The Pipeline To The Lines And Levels And Jointing The Pipes And Specials With Solvent Cement And Testing The Pipeline With Water To The Required Test Pressure ( Excluding Cost Of Pipes And Specials ) : 75 Mm Nominal Outside Diameter Pipes. 56 100.9.9:Laying Upvc Pipes Of Class 2 To Class 6 And Specials, Lowering To The Trenches Already Made, Placing In Position Aligning The Pipeline To The Lines And Levels And Jointing The Pipes And Specials With Solvent Cement And Testing The Pipeline With Water To The Required Test Pressure ( Excluding Cost Of Pipes And Specials ) : 110 Mm Nominal Outside Diameter Pipes. 57 100.9.10:Laying Upvc Pipes Of Class 2 To Class 6 And Specials, Lowering To The Trenches Already Made, Placing In Position Aligning The Pipeline To The Lines And Levels And Jointing The Pipes And Specials With Solvent Cement And Testing The Pipeline With Water To The Required Test Pressure ( Excluding Cost Of Pipes And Specials ) : 140 Mm Nominal Outside Diameter Pipes. 58 100.9.11:Laying Upvc Pipes Of Class 2 To Class 6 And Specials, Lowering To The Trenches Already Made, Placing In Position Aligning The Pipeline To The Lines And Levels And Jointing The Pipes And Specials With Solvent Cement And Testing The Pipeline With Water To The Required Test Pressure ( Excluding Cost Of Pipes And Specials ) : 160 Mm Nominal Outside Diameter Pipes. 59 100.9.13:Laying Upvc Pipes Of Class 2 To Class 6 And Specials, Lowering To The Trenches Already Made, Placing In Position Aligning The Pipeline To The Lines And Levels And Jointing The Pipes And Specials With Solvent Cement And Testing The Pipeline With Water To The Required Test Pressure ( Excluding Cost Of Pipes And Specials ) : 200 Mm Nominal Outside Diameter Pipes. 60 100.31.1.2:Conveying And Fixing C.I. Sluice Valves ( With Cap ) By Providing Bolts, Nuts, Rubber Insertions Etc., Complete, But Excluding The Cost Of The Valve ( Tail Pieces, If Required, Will Be Paid Separately ) : 100Mm Diameter, Class I. 61 100.31.1.3:Conveying And Fixing C.I. Sluice Valves ( With Cap ) By Providing Bolts, Nuts, Rubber Insertions Etc., Complete, But Excluding The Cost Of The Valve ( Tail Pieces, If Required, Will Be Paid Separately ) : 125Mm Diameter, Class I. 62 100.31.1.4:Conveying And Fixing C.I. Sluice Valves ( With Cap ) By Providing Bolts, Nuts, Rubber Insertions Etc., Complete, But Excluding The Cost Of The Valve ( Tail Pieces, If Required, Will Be Paid Separately ) : 150Mm Diameter, Class I. 63 100.31.1.5:Conveying And Fixing C.I. Sluice Valves ( With Cap ) By Providing Bolts, Nuts, Rubber Insertions Etc., Complete, But Excluding The Cost Of The Valve ( Tail Pieces, If Required, Will Be Paid Separately ) : 200Mm Diameter, Class I. 64 100.32.1:Conveying And Fixing C. I. Single Acting Air Valve Of Approved Quality With Bolts, Nuts, Rubber Insertions Etc., Complete, But Excluding The Cost Of Air Valve ( Tail Pieces, If Required, Will Be Paid Separately ) : 25Mm Single Acting Air Valve. 65 100.32.3:Conveying And Fixing C. I. Double Acting Air Valve Of Approved Quality With Bolts, Nuts, Rubber Insertions Etc., Complete, But Excluding The Cost Of Air Valve ( Tail Pieces, If Required, Will Be Paid Separately ) : 50Mm Double Acting Air Valve. 66 100.47.1.2:Leak Rectification Work In 40Mm Upvc ( Class 2 To 6 ) Pipeline Including Detecting And Locating Leak, Earthwork Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar Cutting / Concrete Cutting, Cutting The Pipe Diametrically Perpendicular To The Axis Of Pipeline Without Causing Any Damages To The Remaining Portion, Dismantling And Lifting The Pipe From Trenches, Smoothening The Cut Ends, Conveying The New Pipe To The Site, Cutting And Lowering New Pipe Into The Trenches, Placing In Position, Aligning The Pipe To Line And Level And Jointing The New Pipe With The Existing Pipe With Solvent Cement Or Any Available Joint And Testing The Pipeline By Operating The Valves Concerned, And Rectifying The Defects If Noticed And Without Causing Any Damages To The Existing Utilities And Refilling The Trenches Using Excavated Earth In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Charges For Removing Surplus Soil From Work Site, Including Hire For Tools And Plant, Conveyance Of Tools And Materials, Bailing Out Water, Providing Caution Boards, Lighting, Watching, Ribbon Fencing, Traffic Controlling Etc., Complete As Per The Direction Of Departmental Officers Including The Cost Of Pipe And Upvc Specials; Upvc Pipes And Specials Shall Be Of Good Quality And Conforming To Relevant Standards: All Socketed Jointing. 67 100.47.1.3:Leak Rectification Work In 50Mm Upvc ( Class 2 To 6 ) Pipeline Including Detecting And Locating Leak, Earthwork Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar Cutting / Concrete Cutting, Cutting The Pipe Diametrically Perpendicular To The Axis Of Pipeline Without Causing Any Damages To The Remaining Portion, Dismantling And Lifting The Pipe From Trenches, Smoothening The Cut Ends, Conveying The New Pipe To The Site, Cutting And Lowering New Pipe Into The Trenches, Placing In Position, Aligning The Pipe To Line And Level And Jointing The New Pipe With The Existing Pipe With Solvent Cement Or Any Available Joint And Testing The Pipeline By Operating The Valves Concerned, And Rectifying The Defects If Noticed And Without Causing Any Damages To The Existing Utilities And Refilling The Trenches Using Excavated Earth In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Charges For Removing Surplus Soil From Work Site, Including Hire For Tools And Plant, Conveyance Of Tools And Materials, Bailing Out Water, Providing Caution Boards, Lighting, Watching, Ribbon Fencing, Traffic Controlling Etc., Complete As Per The Direction Of Departmental Officers Including The Cost Of Pipe And Upvc Specials; Upvc Pipes And Specials Shall Be Of Good Quality And Conforming To Relevant Standards: All Socketed Jointing. 68 100.47.1.4:Leak Rectification Work In 63Mm Upvc ( Class 2 To 6 ) Pipeline Including Detecting And Locating Leak, Earthwork Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar Cutting / Concrete Cutting, Cutting The Pipe Diametrically Perpendicular To The Axis Of Pipeline Without Causing Any Damages To The Remaining Portion, Dismantling And Lifting The Pipe From Trenches, Smoothening The Cut Ends, Conveying The New Pipe To The Site, Cutting And Lowering New Pipe Into The Trenches, Placing In Position, Aligning The Pipe To Line And Level And Jointing The New Pipe With The Existing Pipe With Solvent Cement Or Any Available Joint And Testing The Pipeline By Operating The Valves Concerned, And Rectifying The Defects If Noticed And Without Causing Any Damages To The Existing Utilities And Refilling The Trenches Using Excavated Earth In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Charges For Removing Surplus Soil From Work Site, Including Hire For Tools And Plant, Conveyance Of Tools And Materials, Bailing Out Water, Providing Caution Boards, Lighting, Watching, Ribbon Fencing, Traffic Controlling Etc., Complete As Per The Direction Of Departmental Officers Including The Cost Of Pipe And Upvc Specials; Upvc Pipes And Specials Shall Be Of Good Quality And Conforming To Relevant Standards: All Socketed Jointing. 69 100.47.1.5:Leak Rectification Work In 75Mm Upvc ( Class 2 To 6 ) Pipeline Including Detecting And Locating Leak, Earthwork Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar Cutting / Concrete Cutting, Cutting The Pipe Diametrically Perpendicular To The Axis Of Pipeline Without Causing Any Damages To The Remaining Portion, Dismantling And Lifting The Pipe From Trenches, Smoothening The Cut Ends, Conveying The New Pipe To The Site, Cutting And Lowering New Pipe Into The Trenches, Placing In Position, Aligning The Pipe To Line And Level And Jointing The New Pipe With The Existing Pipe With Solvent Cement Or Any Available Joint And Testing The Pipeline By Operating The Valves Concerned, And Rectifying The Defects If Noticed And Without Causing Any Damages To The Existing Utilities And Refilling The Trenches Using Excavated Earth In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Charges For Removing Surplus Soil From Work Site, Including Hire For Tools And Plant, Conveyance Of Tools And Materials, Bailing Out Water, Providing Caution Boards, Lighting, Watching, Ribbon Fencing, Traffic Controlling Etc., Complete As Per The Direction Of Departmental Officers Including The Cost Of Pipe And Upvc Specials; Upvc Pipes And Specials Shall Be Of Good Quality And Conforming To Relevant Standards: All Socketed Jointing. 70 100.47.2.2:Leak Rectification Work In 110Mm Upvc ( Class 2 To 6 ) Pipeline Including Detecting And Locating Leak, Earth Work Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar Cutting / Concrete Cutting, Cutting The Pipe Diametrically Perpendicular To The Axis Of Pipeline Without Causing Any Damages To The Balance Portion, Dismantling And Lifting The Pipe From Trenches, Smoothening The Cut Ends, Conveying The New Pipe, Cutting And Lowering New Pipe Into The Trenches, Placing In Position, Aligning The Pipe To Line And Level And Jointing The New Pipe With The Existing Pipe With Solvent Cement Or Repairable Joint And Testing The Pipeline By Operating The Valves Concerned, And Rectifying The Defects If Noticed And Refilling The Trenches In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Charges For Removing Surplus Soil From Work Site, Without Causing Any Damages To The Existing Utilities, Including Hire For Tools And Plant, Conveyance Of Tools And Materials, Bailing Out Water, Providing Caution Boards, Lighting, Ribbon Fencing, Watching, Traffic Control Etc., Complete As Per The Direction Of Departmental Officers, Including The Cost Of Pipe & Specials But Excluding The Cost Of C.I.R. Joints; Upvc Pipes And Specials Shall Be Of Good Quality And Conforming To Relevant Standards: Socket & C.I.R. Jointing. 71 100.47.2.3:Leak Rectification Work In 140Mm Upvc ( Class 2 To 6 ) Pipeline Including Detecting And Locating Leak, Earth Work Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar Cutting / Concrete Cutting, Cutting The Pipe Diametrically Perpendicular To The Axis Of Pipeline Without Causing Any Damages To The Balance Portion, Dismantling And Lifting The Pipe From Trenches, Smoothening The Cut Ends, Conveying The New Pipe, Cutting And Lowering New Pipe Into The Trenches, Placing In Position, Aligning The Pipe To Line And Level And Jointing The New Pipe With The Existing Pipe With Solvent Cement Or Repairable Joint And Testing The Pipeline By Operating The Valves Concerned, And Rectifying The Defects If Noticed And Refilling The Trenches In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Charges For Removing Surplus Soil From Work Site, Without Causing Any Damages To The Existing Utilities, Including Hire For Tools And Plant, Conveyance Of Tools And Materials, Bailing Out Water, Providing Caution Boards, Lighting, Ribbon Fencing, Watching, Traffic Control Etc., Complete As Per The Direction Of Departmental Officers, Including The Cost Of Pipe & Specials But Excluding The Cost Of C.I.R. Joints; Upvc Pipes And Specials Shall Be Of Good Quality And Conforming To Relevant Standards: Socket & C.I.R. Jointing. 72 100.47.2.4:Leak Rectification Work In 160Mm Upvc ( Class 2 To 6 ) Pipeline Including Detecting And Locating Leak, Earth Work Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar Cutting / Concrete Cutting, Cutting The Pipe Diametrically Perpendicular To The Axis Of Pipeline Without Causing Any Damages To The Balance Portion, Dismantling And Lifting The Pipe From Trenches, Smoothening The Cut Ends, Conveying The New Pipe, Cutting And Lowering New Pipe Into The Trenches, Placing In Position, Aligning The Pipe To Line And Level And Jointing The New Pipe With The Existing Pipe With Solvent Cement Or Repairable Joint And Testing The Pipeline By Operating The Valves Concerned, And Rectifying The Defects If Noticed And Refilling The Trenches In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Charges For Removing Surplus Soil From Work Site, Without Causing Any Damages To The Existing Utilities, Including Hire For Tools And Plant, Conveyance Of Tools And Materials, Bailing Out Water, Providing Caution Boards, Lighting, Ribbon Fencing, Watching, Traffic Control Etc., Complete As Per The Direction Of Departmental Officers, Including The Cost Of Pipe & Specials But Excluding The Cost Of C.I.R. Joints; Upvc Pipes And Specials Shall Be Of Good Quality And Conforming To Relevant Standards: Socket & C.I.R. Jointing. 73 100.47.2.6:Leak Rectification Work In 200Mm Upvc ( Class 2 To 6 ) Pipeline Including Detecting And Locating Leak, Earth Work Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar Cutting / Concrete Cutting, Cutting The Pipe Diametrically Perpendicular To The Axis Of Pipeline Without Causing Any Damages To The Balance Portion, Dismantling And Lifting The Pipe From Trenches, Smoothening The Cut Ends, Conveying The New Pipe, Cutting And Lowering New Pipe Into The Trenches, Placing In Position, Aligning The Pipe To Line And Level And Jointing The New Pipe With The Existing Pipe With Solvent Cement Or Repairable Joint And Testing The Pipeline By Operating The Valves Concerned, And Rectifying The Defects If Noticed And Refilling The Trenches In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Charges For Removing Surplus Soil From Work Site, Without Causing Any Damages To The Existing Utilities, Including Hire For Tools And Plant, Conveyance Of Tools And Materials, Bailing Out Water, Providing Caution Boards, Lighting, Ribbon Fencing, Watching, Traffic Control Etc., Complete As Per The Direction Of Departmental Officers, Including The Cost Of Pipe & Specials But Excluding The Cost Of C.I.R. Joints; Upvc Pipes And Specials Shall Be Of Good Quality And Conforming To Relevant Standards: Socket & C.I.R. Jointing. 74 100.50.1.1:Rectification Of Leakages Of 32Mm, 40Mm & 50Mm G.I. Pipes By Replacing Lengths Up To 1.0M Including Earthwork Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar / Concrete Cutting, By Cutting, Removing And Stacking The Damaged Portion From The Existing Line Without Causing Any Damages To The Remaining Portion And Specials And Conveying And Replacing With G.I. Pipes Of Suitable Size And Jointing By Thraded Coupler And Union Of Suitable Size Including Threading, Alignment, Laying And Jointing To Make A Water Tight Joint, Testing The Line To The Required Pressure, Rectifying Any Defects Noticed And Refilling The Trenches Using Excavated Earth In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Removing The Surplus Soil From The Work Site, Without Causing Any Damages To Any Other Utilities, Including The Charges Hire And Conveyance Of Tools, Plant And Materials To The Leak Site, Bailing Out Water, Lighting, Watching, Ribbon Fencing, Caution Boards, Traffic Diversion, Including The Cost Of Specials But Excluding Cost Of Pipe And As Per The Direction Of Departmental Officers Etc., Complete. 75 100.50.1.2:Rectification Of Leakages Of 65Mm G.I. Pipes By Replacing Lengths Up To 1.0M Including Earthwork Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar / Concrete Cutting, By Cutting, Removing And Stacking The Damaged Portion From The Existing Line Without Causing Any Damages To The Remaining Portion And Specials And Conveying And Replacing With G.I. Pipes Of Suitable Size And Jointing By Thraded Coupler And Union Of Suitable Size Including Threading, Alignment, Laying And Jointing To Make A Water Tight Joint, Testing The Line To The Required Pressure, Rectifying Any Defects Noticed And Refilling The Trenches Using Excavated Earth In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Removing The Surplus Soil From The Work Site, Without Causing Any Damages To Any Other Utilities, Including The Charges Hire And Conveyance Of Tools, Plant And Materials To The Leak Site, Bailing Out Water, Lighting, Watching, Ribbon Fencing, Caution Boards, Traffic Diversion, Including The Cost Of Specials But Excluding Cost Of Pipe And As Per The Direction Of Departmental Officers Etc., Complete. 76 100.50.1.3:Rectification Of Leakages Of 80Mm G.I. Pipes By Replacing Lengths Up To 1.0M Including Earthwork Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar / Concrete Cutting, By Cutting, Removing And Stacking The Damaged Portion From The Existing Line Without Causing Any Damages To The Remaining Portion And Specials And Conveying And Replacing With G.I. Pipes Of Suitable Size And Jointing By Thraded Coupler And Union Of Suitable Size Including Threading, Alignment, Laying And Jointing To Make A Water Tight Joint, Testing The Line To The Required Pressure, Rectifying Any Defects Noticed And Refilling The Trenches Using Excavated Earth In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Removing The Surplus Soil From The Work Site, Without Causing Any Damages To Any Other Utilities, Including The Charges Hire And Conveyance Of Tools, Plant And Materials To The Leak Site, Bailing Out Water, Lighting, Watching, Ribbon Fencing, Caution Boards, Traffic Diversion, Including The Cost Of Specials But Excluding Cost Of Pipe And As Per The Direction Of Departmental Officers Etc., Complete. 77 100.50.1.4:Rectification Of Leakages Of 100Mm G.I. Pipes By Replacing Lengths Up To 1.0M Including Earthwork Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar / Concrete Cutting, By Cutting, Removing And Stacking The Damaged Portion From The Existing Line Without Causing Any Damages To The Remaining Portion And Specials And Conveying And Replacing With G.I. Pipes Of Suitable Size And Jointing By Thraded Coupler And Union Of Suitable Size Including Threading, Alignment, Laying And Jointing To Make A Water Tight Joint, Testing The Line To The Required Pressure, Rectifying Any Defects Noticed And Refilling The Trenches Using Excavated Earth In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Removing The Surplus Soil From The Work Site, Without Causing Any Damages To Any Other Utilities, Including The Charges Hire And Conveyance Of Tools, Plant And Materials To The Leak Site, Bailing Out Water, Lighting, Watching, Ribbon Fencing, Caution Boards, Traffic Diversion, Including The Cost Of Specials But Excluding Cost Of Pipe And As Per The Direction Of Departmental Officers Etc., Complete. 78 100.50.1.5:Rectification Of Leakages Of 125Mm G.I. Pipes By Replacing Lengths Up To 1.0M Including Earthwork Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar / Concrete Cutting, By Cutting, Removing And Stacking The Damaged Portion From The Existing Line Without Causing Any Damages To The Remaining Portion And Specials And Conveying And Replacing With G.I. Pipes Of Suitable Size And Jointing By Thraded Coupler And Union Of Suitable Size Including Threading, Alignment, Laying And Jointing To Make A Water Tight Joint, Testing The Line To The Required Pressure, Rectifying Any Defects Noticed And Refilling The Trenches Using Excavated Earth In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Removing The Surplus Soil From The Work Site, Without Causing Any Damages To Any Other Utilities, Including The Charges Hire And Conveyance Of Tools, Plant And Materials To The Leak Site, Bailing Out Water, Lighting, Watching, Ribbon Fencing, Caution Boards, Traffic Diversion, Including The Cost Of Specials But Excluding Cost Of Pipe And As Per The Direction Of Departmental Officers Etc., Complete. 79 100.50.1.6:Rectification Of Leakages Of 150Mm G.I. Pipes By Replacing Lengths Up To 1.0M Including Earthwork Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar / Concrete Cutting, By Cutting, Removing And Stacking The Damaged Portion From The Existing Line Without Causing Any Damages To The Remaining Portion And Specials And Conveying And Replacing With G.I. Pipes Of Suitable Size And Jointing By Thraded Coupler And Union Of Suitable Size Including Threading, Alignment, Laying And Jointing To Make A Water Tight Joint, Testing The Line To The Required Pressure, Rectifying Any Defects Noticed And Refilling The Trenches Using Excavated Earth In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Removing The Surplus Soil From The Work Site, Without Causing Any Damages To Any Other Utilities, Including The Charges Hire And Conveyance Of Tools, Plant And Materials To The Leak Site, Bailing Out Water, Lighting, Watching, Ribbon Fencing, Caution Boards, Traffic Diversion, Including The Cost Of Specials But Excluding Cost Of Pipe And As Per The Direction Of Departmental Officers Etc., Complete. 80 16.83:Taking Out Existing Cc Interlocking Paver Blocks From Footpath / Central Verge, Including Removal Of Rubbish Etc., Disposal Of Unserviceable Material To The Dumping Ground, For Which Payment Shall Be Made Separately And Stacking Of Serviceable Material Within 50 Metre Lead As Per Direction Of Engineer-In-Charge. 81 16.84:Laying Old Cement Concrete Interlocking Paver Blocks Of Any Design / Shape Laid In Required Line, Level, Curvature, Colour And Pattern Over And Including 50 Mm Thick Compacted Bed Of Coarse Sand, Filling The Joints With Fine Sand Etc. All Complete As Per The Direction Of Engineer-In-Charge. ( Old Cc Paver Blocks Shall Be Supplied By The Department Free Of Cost. ) 82 16.68:Providing And Laying 60 Mm Thick Factory Made Cement Concrete Interlocking Paver Block Of M - 30 Grade Made By Block Making Machine With Strong Vibratory Compaction, Of Approved Size, Design & Shape, Laid In Required Colour And Pattern Over And Including 50 Mm Thick Compacted Bed Of Coarse Sand, Filling The Joints With Fine Sand Etc. All Complete As Per The Direction Of Engineer-In-Charge. 83 Construction Of Valve Chamber 84 2.8.1:Earth Work In Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Means In Foundation Trenches Or Drains ( Not Exceeding 1.5 M In Width Or 10 Sqm On Plan ) , Including Dressing Of Sides And Ramming Of Bottoms, Lift Up To 1.5 M, Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M.All Kinds Of Soil 85 4.1.3:Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level:1:2:4 ( Cement : 2 Coarse Sand ( Zone-Iii ) : 4 Graded Stone Aggregate 20 Mm Nominal Size ) 86 5.1.2:Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete, Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement - All Work Up To Plinth Level:1:1:5:3 ( 1 Cement 1.5 Coarse Sand :3 Graded Stone Aggregate 20 Mm Nominal Size 87 5.1.3:Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete, Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement - All Work Up To Plinth Level:1:2:4 ( 1 Cement : 2 Coarse Sand : 4 Graded Stone Aggregate 20 Mm Nominal Size ) 88 5.22.4:Steel Reinforcement For R.C.C Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete Upto Plinth Levelhot Rolled Deformed Bars 89 4.3.1:Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form Work For:Foundations, Footings, Bases For Columns 90 Providing Fhtc 91 100.60.14.1.2:Providing 15Mm ( 1 / 2 Inch ) House Connection With 15Mm Water Meter From Existing Pvc / Hdpe Mains From 140Mm To 200Mm Dia., Up To A Length Of 5 M Using 20Mm ( 1 / 2 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pp Pn 16 Compression / Gm / Brass Specials Viz. Brass Ferrule, Brass Hexagonal Nipple, Gm Full Way Wheel Valve, Bend, Mta, Fta, Couplers, Pvc Service Saddle Of Suitable Size Etc. And Connecting With The Mains, Testing The Joints Etc. Complete Including Trenching And Refilling In All Kinds Of Soil Up To A Depth Of 1.50M For Main Line Tracing And Trench Of Average Cross Section 0.3M X 0.75M For Laying Connection Pipe And Service Pipe, Fixing Water Meter, Lighting, Watching, Providing Caution Boards, Traffic Control Etc. Complete Including Cost Of Materials, Hire For Tools, Cost Of Consumables And Labour Charges, Including The Cost Of Tested Class B Multijet Water Meter With Isi Mark And Weather Resistant Pp / Pe Meter Box Of Minimum Size 300Mm X 200Mm X 150Mm, But Excluding Charges For Cutting The Concrete / Tarred / Bituminous Roads Etc, And As Per The Direction Of The Departmental Officers. 92 100.60.14.3.2:Providing 20Mm ( 3 / 4 Inch ) House Connection With 15Mm Water Meter From Existing Pvc / Hdpe Mains From 140Mm To 200Mm Dia., Up To A Length Of 5 M Using 25Mm ( 3 / 4 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pp Pn 16 Compression / Gm / Brass Specials Viz. Brass Ferrule, Brass Hexagonal Nipple, Gm Full Way Wheel Valve, Bend, Mta, Fta, Couplers, Pvc Service Saddle Of Suitable Size Etc. And Connecting With The Mains, Testing The Joints Etc. Complete Including Trenching And Refilling In All Kinds Of Soil Up To A Depth Of 1.50M For Main Line Tracing And Trench Of Average Cross Section 0.3M X 0.75M For Laying Connection Pipe And Service Pipe, Fixing Water Meter, Lighting, Watching, Providing Caution Boards, Traffic Control Etc. Complete Including Cost Of Materials, Hire For Tools, Cost Of Consumables And Labour Charges, Including The Cost Of Tested Class B Multijet Water Meter With Isi Mark And Weather Resistant Pp / Pe Meter Box Of Minimum Size 300Mm X 200Mm X 150Mm, But Excluding Charges For Cutting The Concrete / Tarred / Bituminous Roads Etc, And As Per The Direction Of The Departmental Officers 93 100.60.14.4.2:Providing 15Mm ( 1 / 2 Inch ) House Connection With 15Mm Water Meter From Existing Ac / Gi Mains From 150Mm To 200Mm Dia., Up To A Length Of 5 M Using 20Mm ( 1 / 2 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pp Pn 16 Compression / Gm / Brass Specials Viz. Brass Ferrule, Brass Hexagonal Nipple, Gm Full Way Wheel Valve, Bend, Mta, Fta, Couplers, Gi / Ms Service Saddle Of Suitable Size Etc. And Connecting With The Mains, Testing The Joints Etc. Complete Including Trenching And Refilling In All Kinds Of Soil Up To A Depth Of 1.50M For Main Line Tracing And Trench Of Average Cross Section 0.3M X 0.75M For Laying Connection Pipe And Service Pipe, Fixing Water Meter, Lighting, Watching, Providing Caution Boards, Traffic Control Etc. Complete Including Cost Of Materials, Hire For Tools, Cost Of Consumables And Labour Charges, Including The Cost Of Tested Class B Multijet Water Meter With Isi Mark And Weather Resistant Pp / Pe Meter Box Of Minimum Size 300Mm X 200Mm X 150Mm, But Excluding Charges For Cutting The Concrete / Tarred / Bituminous Roads Etc, And As Per The Direction Of The Departmental Officers. 94 100.60.14.6.2:Providing 20Mm ( 3 / 4 Inch ) House Connection With 15Mm Water Meter From Existing Ac / Gi Mains From 150Mm To 200Mm Dia., Up To A Length Of 5 M Using 25Mm ( 3 / 4 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pp Pn 16 Compression / Gm / Brass Specials Viz. Brass Ferrule, Brass Hexagonal Nipple, Gm Full Way Wheel Valve, Bend, Mta, Fta, Couplers, Gi / Ms Service Saddle Of Suitable Size Etc. And Connecting With The Mains, Testing The Joints Etc. Complete Including Trenching And Refilling In All Kinds Of Soil Up To A Depth Of 1.50M For Main Line Tracing And Trench Of Average Cross Section 0.3M X 0.75M For Laying Connection Pipe And Service Pipe, Fixing Water Meter, Lighting, Watching, Providing Caution Boards, Traffic Control Etc. Complete Including Cost Of Materials, Hire For Tools, Cost Of Consumables And Labour Charges, Including The Cost Of Tested Class B Multijet Water Meter With Isi Mark And Weather Resistant Pp / Pe Meter Box Of Minimum Size 300Mm X 200Mm X 150Mm, But Excluding Charges For Cutting The Concrete / Tarred / Bituminous Roads Etc, And As Per The Direction Of The Departmental Officers. 95 100.60.13.1.2:Providing 15Mm ( 1 / 2 Inch ) House Connection With 15Mm Water Meter From Existing Pvc / Hdpe Mains Up To 110 Mm Dia., Up To A Length Of 5M Using 20Mm ( 1 / 2 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pp Pn 16 Compression / Gm / Brass Specials Viz. Brass Ferrule, Brass Hexagonal Nipple, Gm Full Way Wheel Valve, Bend, Mta, Fta, Couplers, Pvc Service Saddle Of Suitable Size Etc. And Connecting With The Mains, Testing The Joints Etc. Complete Including Trenching And Refilling In All Kinds Of Soil Up To A Depth Of 1.50M For Main Line Tracing And Trench Of Average Cross Section 0.3M X 0.75M For Laying Connection Pipe And Service Pipe, Fixing Water Meter, Lighting, Watching, Providing Caution Boards, Traffic Control Etc. Complete Including Cost Of Materials, Hire For Tools, Cost Of Consumables And Labour Charges, Including The Cost Of Tested Class B Multijet Water Meter With Isi Mark And Weather Resistant Pp / Pe Meter Box Of Minimum Size 300Mm X 200Mm X 150Mm, But Excluding Charges For Cutting The Concrete / Tarred / Bituminous Roads Etc, And As Per The Direction Of The Departmental Officers. 96 100.60.13.3.2:Providing 20Mm ( 3 / 4 Inch ) House Connection With 15Mm Water Meter From Existing Pvc / Hdpe Mains Up To 110 Mm Dia., Up To A Length Of 5M Using 25Mm ( 3 / 4 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pp Pn 16 Compression / Gm / Brass Specials Viz. Brass Ferrule, Brass Hexagonal Nipple, Gm Full Way Wheel Valve, Bend, Mta, Fta, Couplers, Pvc Service Saddle Of Suitable Size Etc. And Connecting With The Mains, Testing The Joints Etc. Complete Including Trenching And Refilling In All Kinds Of Soil Up To A Depth Of 1.50M For Main Line Tracing And Trench Of Average Cross Section 0.3M X 0.75M For Laying Connection Pipe And Service Pipe, Fixing Water Meter, Lighting, Watching, Providing Caution Boards, Traffic Control Etc. Complete Including Cost Of Materials, Hire For Tools, Cost Of Consumables And Labour Charges, Including The Cost Of Tested Class B Multijet Water Meter And Weather With Isi Mark Resistant Pp / Pe Meter Box Of Minimum Size 300Mm X 200Mm X 150Mm, But Excluding Charges For Cutting The Concrete / Tarred / Bituminous Roads Etc, And As Per The Direction Of The Departmental Officers. 97 100.60.13.4.2:Providing 15Mm ( 1 / 2 Inch ) House Connection With 15Mm Water Meter From Existing Ac / Gi Mains Up To 125 Mm Dia., Up To A Length Of 5M Using 20Mm ( 1 / 2 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pp Pn 16 Compression / Gm / Brass Specials Viz. Brass Ferrule, Brass Hexagonal Nipple, Gm Full Way Wheel Valve, Bend, Mta, Fta, Couplers, Gi / Ms Service Saddle Of Suitable Size Etc. And Connecting With The Mains, Testing The Joints Etc. Complete Including Trenching And Refilling In All Kinds Of Soil Up To A Depth Of 1.50M For Main Line Tracing And Trench Of Average Cross Section 0.3M X 0.75M For Laying Connection Pipe And Service Pipe, Fixing Water Meter, Lighting, Watching, Providing Caution Boards, Traffic Control Etc. Complete Including Cost Of Materials, Hire For Tools, Cost Of Consumables And Labour Charges, Including The Cost Of Tested Class B Multijet Water Meter With Isi Mark And Weather Resistant Pp / Pe Meter Box Of Minimum Size 300Mm X 200Mm X 150Mm, But Excluding Charges For Cutting The Concrete / Tarred / Bituminous Roads Etc, And As Per The Direction Of The Departmental Officers. 98 100.60.13.6.2:Providing 20Mm ( 3 / 4 Inch ) House Connection With 15Mm Water Meter From Existing Ac / Gi Mains Up To 125 Mm Dia., Up To A Length Of 5 M Using 25Mm ( 3 / 4 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pp Pn 16 Compression / Gm / Brass Specials Viz. Brass Ferrule, Brass Hexagonal Nipple, Gm Full Way Wheel Valve, Bend, Mta, Fta, Couplers, Gi / Ms Service Saddle Of Suitable Size Etc. And Connecting With The Mains, Testing The Joints Etc. Complete Including Trenching And Refilling In All Kinds Of Soil Up To A Depth Of 1.50M For Main Line Tracing And Trench Of Average Cross Section 0.3M X 0.75M For Laying Connection Pipe And Service Pipe, Fixing Water Meter, Lighting, Watching, Providing Caution Boards, Traffic Control Etc. Complete Including Cost Of Materials, Hire For Tools, Cost Of Consumables And Labour Charges, Including The Cost Of Tested Class B Multijet Water Meter With Isi Mark And Weather Resistant Pp / Pe Meter Box Of Minimum Size 300Mm X 200Mm X 150Mm, But Excluding Charges For Cutting The Concrete / Tarred / Bituminous Roads Etc, And As Per The Direction Of The Departmental Officers. 99 100.60.23.3.1:Providing 15Mm Pvc Tap In The Water Meter Assembly For 15Mm ( 1 / 2 Inch ) Water Connection, Using 20Mm ( 1 / 2 Inch ) Indian Standard Upvc Class 6 Pipes, Upvc Specials And Pp Pn 16 Compression Specials Including Cost Of Materials, Consumables, Hire Charges For Tools And Labour Charges Etc. Complete And As Per The Direction Of Departmental Officers. 100 100.60.23.4.1:Providing 15Mm Pvc Tap In The Water Meter Assembly For 20Mm ( 3 / 4 Inch ) Water Connection, Using 25Mm ( 3 / 4 Inch ) Indian Standard Class 6 Upvc Pipes, Upvc Specials And Pp Pn 16 Compression Specials Including Cost Of Materials, Consumables, Hire Charges For Tools And Labour Charges Etc. Complete And As Per The Direction Of Departmental Officers. 101 100.60.15.1.1:Providing Additional Length Of House Connection Pipe Using 20 Mm ( 1 / 2 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pn16 Specials And Testing The Joints Etc., By Trenching And Refilling In All Kinds Of Soil With Trench Of Average Cross Section 0.3M X 0.75M For Laying Of Connection Pipe And Service Pipe, Lighting, Watching, Providing Caution Boards, Traffic Control Etc., Including Cost Of Materials, Hire For Tools, Cost Of Consumables And Labour Charges Etc. Complete, But Excluding The Cost Of Cutting Of Concrete / Tarred / Bituminous Roads Etc., And As Per The Directions Of The Department Officers. 102 100.60.15.2.1:Providing Additional Length Of House Connection Pipe Using 25 Mm ( 3 / 4 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pn 16 Specials And Testing The Joints Etc., By Trenching And Refilling In All Kinds Of Soil With Trench Of Average Cross Section 0.3M X 0.75M For Laying Of Connection Pipe And Service Pipe, Lighting, Watching, Providing Caution Boards, Traffic Control Etc., Including Cost Of Materials, Hire For Tools, Cost Of Consumables And Labour Charges Etc. Complete, But Excluding The Cost Of Cutting Of Concrete / Tarred / Bituminous Roads Etc., And As Per The Directions Of The Department Officers. 103 100.60.21.1.1:Providing 15Mm ( 1 / 2 Inch ) Gm Air Valve In The Water Meter Assembly For 15Mm Water Connection, Using 20Mm ( 1 / 2 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pp Pn 16 Compression Specials Including Cost Of Materials, Consumables, Hire For Tools And Labour Charges Etc. Complete And As Per The Directions Of The Department Officers. 104 100.60.21.2.1:Providing 20Mm ( 3 / 4 Inch ) Gm Air Valve In The Water Meter Assembly For 20Mm Water Connection, Using 25Mm ( 3 / 4 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pp Pn 16 Compression Specials Including Cost Of Materials, Consumables, Hire For Tools And Labour Charges Etc. Complete And As Per The Directions Of The Department Officers. 105 15.2.2:Demolishing Cement Concrete Manually / By Mechanical Means Including Disposal Of Material Within 50 Metres Lead As Per Direction Of Engineer - In-Charge.Nominal Concrete 1:4:8 Leaner Mix ( Including Equivalent Design Mix ) 106 4.1.5:Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level:1:3:6 ( 1 Cement : 3 Coarse Sand : 6 Graded Stone Aggregate 20 Mm Nominal Size ) 107 100.59.1:Cutting The Bituminous / Concrete Roads With Cutting Machine For A Minimum Depth Of 200Mm Along The Sides Of Proposed Alignment Of The Pipe To Be Laid Without Causing Any Damage To Other Utilities, Including The Charges For Hire And Conveyance Of Tools And Plant, Cost Of Consumables And Charges For Lighting, Watching, Ribbon Fencing, Caution Boards, Traffic Diversion, And As Per The Direction Of Departmental Officers Etc. Complete, Before Carrying Out The Demolition Of Bituminous / Concrete Road By Mechanical Means And Carrying Out The Excavation. 108 Od191030 / 2022-2023: Dismantling By Manually / By Mechanical Means And Disposal Of Materials With In 50 M Lead As Per Direction Of Engineers In Charge<>Bituminous Road 109 Road Restoration Charges - Morth 110 3.6:Excavation For Roadwork In Soil With Hydraulic Excavator Of 0.9 Cum Bucket Capacity Including Cutting And Loading In Tippers, Trimming Bottom And Side Slopes, In Accordance With Requirements Of Lines, Grades And Cross Sections, And Transporting To The Embankment Location Within All Lifts And Lead Upto 1000M 111 4.2.A.1:Construction Of Granular Sub-Base By Providing Graded Material, Spreading In Uniform Layers With A Motor Grader On A Prepared Surface, Mixing By Mix In-Place Method With Rotavator At Omc, And Compacting With A Vibratory Roller To Achieve The Desired Density, Complete As Per Clause 401. Grading-Iii -For Lower Sub-Base - Mix In Place Method 112 4.12:Providing, Laying, Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam Specification Including Premixing The Material With Water At Omc In Mechanical Mix Plant Carriage Of Mixed Material By Tipper To Site, Laying In Uniform Layers With Paver In Sub- Base / Base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density. 113 5.1.A:Providing And Applying Primer Coat With Bitumen Emulsion ( Ss ) On Prepared Surface Of Granular Base Including Clearing Of Road Surface And Spraying Primer At The Rate Of 0.70 - 1.0 Kg / Sqm Using Mechanical Means. 114 5.2.B:Providing And Applying Tack Coat With Bitumen Emulsion ( Rs ) Using Emulsion Pressure Distributor At The Rate Of 0.25 - 0.30 Kg Per Sqm On The Prepared Granular Surface Cleaned With Mechanical Broom. 115 5.3.2.A:Providing And Laying Bituminous Macadam With 80-100 Tph Hot Mix Plant Producing An Average Output Of 75 Tonnes Per Hour Using Crushed Aggregates Of Specified Grading Premixed With A Bituminous Binder ( Vg 30 ) , Transported To The Site, Laid Over A Previously Prepared Surface With Paver Finisher To The Required Grade, Level, And Alignment And Rolled As Per Clauses 501.6 And 501.7 To Achieve The Desired Compaction For Grading Ii - ( 19 Mm Nominal Size ) 116 5.2.A:Providing And Applying Tack Coat With Bitumen Emulsion ( Rs ) Using Emulsion Pressure Distributor At The Rate Of 0.20 - 0.30 Kg Per Sqm On The Prepared Bituminous Surface Cleaned With Mechanical Broom. 117 5.6.2.A:Providing And Laying Bituminous Concrete With 80-100 Tph Hot Mix Plant Producing An Average Output Of 75 Tonnes Per Hour Using Crushed Aggregates Of Specified Grading, Premixed With A Bituminous Binder ( Nrmb ) @ 5.4 Percent Of Mix And Filler, Transporting The Hot Mix To Work Site, Laying With A Hydrostatic Paver Finisher With Sensor Control To The Required Grade, Level, And Alignment, Rolling With Smooth Wheeled, Vibratory And Tandem Rollers To Achieve The Desired Compaction As Per Morth Specification Clause No. 507 Complete In All Respects For Grading - Ii ( 13.2 Mm Nominal Size ) 118 5.7.1:Providing, Laying And Rolling Of Close-Graded Premix Surfacing Material Of 20 Mm Thickness Composed Of 11.2 Mm To 0.09 Mm ( Type-A ) Aggregates Using Viscosity Grade Bitumen ( Vg - 30 ) To The Required Line, Grade, And Level To Serve As Wearing Course On A Previously Prepared Base, Including Mixing In A Suitable Hmp Of Appropriate Capacity Not Less Than 75 Tonnes / Hour., Laying And Rolling With A Smooth Wheeled Roller 8-10 Tonne Capacity, And Finishing To The Required Level And Grade. 119 5.8.A:Providing And Laying Surface Dressing As Wearing Course In Single Coat Using Crushed Stone Aggregates Of Specified Size On A Layer Of Bituminous Binder ( Vg 30 ) Laid On The Prepared Surface And Rolling With 8-10 Tonne Smooth Wheeled Steel Roller. Grading I - 19 Mm Nominal Chipping Size 120 12.4:Plain Cement Concrete 1:3:6 Nominal Mix In Foundation With Crushed Stone Aggregate 40 Mm Nominal Size Mechanically Mixed, Placed In Foundation And Compacted By Vibration Including Curing For 14 Days. 121 12.8.B.1:Plain / Reinforced Cement Concrete In Open Foundation Complete As Per Drawing And Technical Specificationspcc Grade M20 122 Road Restoration Charges- Mord 123 3.5.3:Excavation In Soil Using Hydraulic Excavator And Tippers With Disposal Upto 1000 Mexcavation For Roadwork In Soil With Hydraulic Excavator Of 0.9 Cum Bucket Capacity Including Cutting And Loading In Tippers, Trimming Bottom And Side Slopes, In Accordance With Requirements Of Lines, Grades And Cross-Sections, And Transporting To The Embankment Location With A Lift Upto 1.5 M And Lead Upto 1000 M As Per Technical Specification Clause 302.3 124 4.1.A.1:Granular Sub-Base With Well Graded Material ( Table 400.1 ) ( A ) By Mix In Place Methodconstruction Of Granular Sub-Base By Providing Well Graded Material, Spreading In Uniform Layers With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc, And Compacting With Smooth Wheel Roller To Achieve The Desired Density, Complete As Per Technical Specification Clause 401. ( I ) For Grading I Material 125 4.9:Wet Mix Macadamproviding, Laying, Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam Specification Including Premixing The Material With Water At Omc In Mechanical Mixer ( Pug Mill ) , Carriage Of Mixed Material By Tipper To Site, Laying In Uniform Layers In Sub-Base / Base Course On A Well Prepared Sub-Base And Compacting With Smooth Wheel Roller Of 80 To 100Kn Weight To Achieve The Desired Density Including Lighting, Barricading And Maintenance Of Diversion, Etc As Per Tables 400.11 & 400.12 And Technical Specification Clause 406.By Mechanical Means With 1 Km Lead 126 5.1.1A:Prime Coat :- Low Porosityproviding And Applying Primer Coat With Bitumen Emulsion ( Ss-1 ) On Prepared Surface Of Granular Base Including Cleaning Of Road Surface And Spraying Primer At The Rate Of 0.70-1.0 Kg / Sqm Using Mechanical Means As Per Technical Specification Clause 502 127 5.2.3A:Tack Coat Providing And Applying Tack Coat With Bitumen Emulsion ( Rs-1 ) Using Emulsion Distributor At The Rate Of 0.25 To 0.30 Kg Per Sqm On The Prepared Granular Surfaces Treated With Primer & Cleaned With Hydraulic Broom As Per Technical Specification Clause 503. 128 5.9.1.2A:20Mm Thick Open-Graded Premix Carpet Using Bituminous ( Penetration Grade / Modified Bitumen ) Binder - Bitumen S-65Providing, Laying And Rolling Of Open-Graded Premix Carpet Of 20 Mm Thickness Composed Of 13.2 Mm To 5.6 Mm Aggregates Either Using Penetration Grade Bitumen Or Emulsion To Required Line, Grade And Level To Serve As Wearing Course On A Previously Prepared Base, Including Mixing In A Suitable Plant, Laying And Rolling With A Three Wheel 80-100 Kn Static Roller Capacity, Finished To Required Level And Grades To Be Followed By Seal Coat Of Either Type A Or Type B Or Type C As Per Technical Specification Clause 508.Case - I By Manual Means ( Ii ) Bitumen ( S-65 ) 129 5.12.A.3.2A:Seal Coat - Manual Means - Type C - Bitumen S-65Providing And Laying Seal Coat Sealing The Voids In A Bituminous Surface Laid To The Specified Levels, Grade And Cross Fall Using Type A, Type B And Type C As Per Technical Specification Clause 510A. By Manual Means :- Case - Iii : Type C ( Ii ) Bitumen ( S-65 ) 130 11.4.3.1:Providing Concrete For Plain / Reinforced Concrete In Open Foundations Complete As Per Drawings And Technical Specifications Clause 802, 803, 1202 & 1203Iii. P.C.C. Grade M 20 ( I ) Nominal Mix ( 1:2:4 )