Tender For Dismantle, Erection And Fabrication Work In Different Houses Of Sugar Mill-Dismantling And Scrap Pipeline ( Including Nipple Band Flange ) From 15 Mm To 300 Mm Dia Put In The Yard Dismantling Of Ms Pipe ( Including Nipple Band Flange ) Of Dia More Than 300 Mm And Putting In Scrap Yard. 15 Mm To 300 Mm M.S. Or S.S. Pipeline Position By Fitting And Giving Trial. Making Ms Pipe Of More Than 300 Mm Diameter With 6, 8 And 10 Mm Ms Plate And Making And Replacing Ms Or Ss Nipples Of 15 Mm To 300 Mm Dia. Ms Nipul Of Size Above 300Mm Dia Make Up From 15 Mm To 300 Mm Ms Pipe Ms Band Of Size More Than 300 Mm Dia. From 15 Mm To 1200 Size, Cutting And Making Of Ms Flange From Plate And Drilling And Fitting. Making And Converting Ms / Sst From 15 Mm To 300 Mm Dia. Of Making M.S.T. Of Dia More Than 300 M.M. And Change. , Cast Making From 15 Mm To 300 Mm Dia And Change , Making Of Casings Up To Dia More Than 300 Mm And Change. Valves From 15 Mm To 300 Mm In Size Opening , Valves From 15 Mm To 300 Mm In Size Tie . , Opening Of Valves Of Dia More Than 300 Mm Fitting Of Valves Of Dia More Than 300 Mm. Straightening Of Bent Circular Plate. Corroded Part Of Vapor Pipe, Tank Bezel Etc. Change. Dismantling Of Light Structure Fabrication Of Light Structure Erection Of Light Structure Dismantling Of Heavy Structure Fabrication Of Heavy Structure Erection Of Heavy Structures Round Or Rectangular Tank With Ms Plate Make And Change Removing Corroded M.S. Gutter And Replacing It With A Given Plate, Fixing It In Place And Strengthening It. From 15 Mm To 150 Mm Diameter Pipeline, Making Round Coils And Replacing Them With Nipples And Flanges, Fitting The Coils In Place And Giving Trial With Satisfactory Hydraulic Testing. Making Rectangular Coil From 15 Mm To 150 Mm Dia Pipeline With Nipple And Flange And Fitting The Coil In Place And Giving Trial With Satisfactory Hydraulic Testing. Opening And Re-Tying Of Pipelines Of Different Sizes ( Of Different Houses ) Including Valves And Bands Etc. For Cleaning. Cutting And Re-Installing The Header Above The Damaged 6* At Different Places And All Related Giving Trial By Fitting Nipple Valve Etc. Replacement Of 1600 Mm To 900 Mm Dia Throated Man Hole By Making 8 Or 10 Mm Plate. Making M.S. Beds For Motor Pump And Reduction Gear Box From 5 To 50 Hp And Giving Satisfactory Trial After Fitting And Alignment. Making Ms Beds For Motor Pump And Reduction Gear Box From 51 To 100 Hp And Giving Satisfactory Trial After Fitting And Alignment. Making Ms Beds For Pumps And Motors Ranging From 5 To 50 Hp, Giving Satisfactory Trials After Fitting And Alignment. Making Ms Beds For Pumps And Motors Ranging From 51 To 100 Hp, Giving Satisfactory Trials After Fitting And Alignment. Dismantling Of Corroded Ms Plate Of Machinery Installed At Various Places And Fitting It With New Plate. ( Patching Work ) Fabricate The Juice Tray Of The Mill From Ss Or Aluminum Plate And Do The Erection And Complete The Related Connection Work And Give The Trial. After Removing The Old Runner Of Cane Carrier, Bagasse Carrier, Bagasse Elevator And Return Bagasse Carrier, Fit The New Runner And Give A Satisfactory Trial. Give Satisfactory Trial By Removing Old Runner Of Secondary Rack Carrier, Inter Rack Carrier And Fit New Runner. Removing Damaged Side And Wtom Plates Of Secondary Rack Carrier And Inter Rack Carriers And Installing New Side And Wtom Plates And For Stranding From Outside Applying Agile. Cutting Out The Worn Mesh Bottom Tray Of The Old Screw Conveyor And Replacing It With The Same Bottom Tray As Before. Tadayav But Without Mesh. Renovating The Gutter On The Dsm Screen Placement By Making Juice Rings Of Mill Rollers From M.S. Plate Placement Cane Carrier Side Plate And Bagasse Elevator Bagasse Carrier Rbcs Side And Bottom Plates Replace Damaged Ones. Damaged Side Plates Of Fiberizer Leveler And Chopper Change To Making New Rakes Of Secondary And Inter Rake Carriers. Rack Repairing Of Secondary And Inter Rack Carriers. By Cutting The Corroded Plates Of The Trough Of The Inter Rack Carrier. Removal And 8 Or 10 Mm Given In Its Place Key Plate Installation And Trial. Remove Square Bar Of Trolley Of Cane Unloader And Fix New Square Bar And Give Satisfactory Trial. New Plate By Removing The Central Plate Of The Fiberizer Fabrication And Giving A Satisfactory Trial. Dismantling The Top Guard Of Trpf Of The Mill And Putting It In The Scrap Yard And New 8 To 10 Mm. Top Guard Made From Plate And Fitted Satisfactorily , Give Trial Cutting Pine Apple Chevron Groove Of Mill Roller | , Welding The Cut Teeth Of The Crown Pinion Of The Mill And Correcting The Teeth With The Grinder By Welding With The Hardfacing Electrode Mentioned On It. Welding And Sizing Of Mill Cut Tailwar Make According To Welding Of Trpf Rollers Of The Mill And Correcting The Cut Side By Welding Or By Applying Plate Doing. Secondary Rack Carrier Inter Rack Carrier Bagasse Carrier Bagasse Elevator Removal Of Corroded Egil Under The Runner Of Rbc And Replacing It With New Egil. Making And Fixing The Juice Distribution Tray Attached To The Pipeline Of The Juice Pumps Of The Mill. Cutting And Removing The Old Troughs Of All The Three Inter Rack Carriers On The Mill House And Fixing The Troughs As Per Instructions From The Given 10 Mm Plate And Giving Trial. Cutting And Removing The Old Trough Of The Secondary Rack Carrier Fitted On The Mill House And Making A New Trough From The Given 10 Mm Plate And Giving A Satisfactory Trial. By Removing The Damaged Partition Plate Of The Anvil Plate Of The Fibroiser, Replace The New Plate Of 12 Mm. Installation, Alignment And | The Dsm Screen Fixed On The Mill House Was Hugged. Cutting Out The Part And Correcting It By Applying The Given Plate. 300 To 450 Psi By Removing The Damaged / Weak Sulfur Melter Of Satvik Type Furnace And Fitting The Newly Made Coil From 10 Or 12 Mm Plate. Give Trial By Hydraulics. According To The Sample From The Seamless Pipe Given To The Sulfur Melter Coil Size 3 And 4 Inches Of The Film Type Furnace. Fabrication And 300 To 450 Psi Hydraulic. Give A Trial Replacement Of Leaf Flat Iron For Rubber Packing Of Top And Bottom Header Of Juice Heater And Giving Trial By Applying Rubber Packing. Removing The Condensate Bottle Of Juice Heater Quad Semi-Condenser Vaporcell And Fixing It According To The Sample From The Given New 8 Or 10 Mm Plate And Giving It A Trial. Cutting Out The Old Damaged Agitator Of Vacuum Filter Size 8-16 Feet And Preparing And Trialling A New Agitator With Angle Channel Etc. As Before. Cut Out All The Partition Plates Of The Header Of The Juice Heater Straight And Circular. After Cleaning The Tube Plate Beforehand, Make A New Circular And Straight Partition Plate From A Plate Of 10 Or 12 Mm. Prepare Header As Before By Applying Ms Strip And Give Trial By Applying Rubber Strip. Dismantling The Scrubber Cooler Flange Cover Nipple And Pipeline Of Satvik / Film Type Furnaces, Taking Out The Cooler Pipe Etc. And Or Making A Cell Out Of 10-12 Mm Plate And All The Cooling Pipes. Cutting Out The Damaged Bottom Cone Of Juice Sulphiters Recovery Tower And Fitting A New Cone From 12 Mm Plate. By Installing Related Pipeline , To Give A Trial Dismantling The Damaged Tower Of Syrup Sulphiter. Putting Out And Making A New Tower From 8 Or 10 Mm Plate As Before And Giving Trial By Connecting Nipple, Manhole, Partition Plate, Air Bent Pipe And Related Pipeline. Heavy / Light Filtrate Juice Tank Mounted On Small Vacuum Filter | ( Dia 1 M 0 C Height 1.5 M 0 Approximately ) By Cutting And Removing 10:00 Mm Plate Making Tank As Before By Installing Related Nipple, Flange Etc. Pipeline , Give Trial Heavy / Light Filtrate Juice Tank Mounted On Large Vacuum Filter | ( Dia 1.5 M C Height 1.0 M Approx ) Cutting Out And 10:00 Mm Plate As Before Dismantling And Throwing Out The Old Damaged Mud Tank ( Dia. 2.5 M X 2.0 M Height ) Of Small Vacuum Filter And Making A New One With Cover From 10.00 Mm Plate And Preparing Nipple Flange Manhole And Giving It A Trial. Inside The Juice Sulphiter, Prepare Perforated Plate With Old / New Plate Of About 8.00 Mm Thickness / 35 M Dia. To Give A Trial Dismantling Of After Burner Cooler Of Satvik Or Film Type Furnace, Replacement Of Damaged Pipe Of 12 Mm Inside Water Jacket With New Seamless Pipe. Prepare And Give Trial As Before By Putting On Jacket Etc. Take Out The Catcher ( Measurement 1.2 X 1.5 M ) Mounted On A Large Vacuum Filter And Prepare A New Catcher With A Partition Plate From 10:00 Mm Plate As Before. Preparing And Fitting The Relevant Nipple Flange Line Making The Shell Of Sulfur Furnace By Bending It From 12 Or 16 Mm Plate And Making Front And Back Cover And Water Jacket And Giving Trial By Making All The Connections Like Before. Replacing The Gully Plate Of Mud Mixture With New Plate And By Making The Screw Conveyor Attached To It As Before Give A Trial By Applying A Place. ( Lamsum ) Cut Out The Corroded Base Plate Of The Door And Fit It With The New Plate As Before. ( Lamsam ) Cut Out The Overflow Gallery Inside The Syrup Sulphiter And The Syrup Box Outside Which Is Damaged And Give A Trial By Making It From The Given 8 Or 10 Mm Plate As Before. ( Lamsum ) Dismantle The Condenser Of The Vacuum Filter And Put It In The Scrap Yard And Trial Fit It By Making A Condenser From The Given 8 Or 10 Mm New Plate. ( Lamsum ) Dismantling The Incoming And Outgoing Box Fitted Between The Juice Heaters Double Beat Valve And The Juice Heaters Header, Make A New One From 12 Mm Plate And Give A Satisfactory Trial. Dismantling Worn Out Manholes At Juice Sulphiter, Syrup Sulphiter And Other Places, Making New Ones And Installing Them In Place. Cutting Out One Meter Length Necked Nipple Of Size 400 Mm 4 Fitted In The Vapor Line Of Juice Heater And Making New Ones As Before. Dismantle The Foaming Chamber Of The Clarifier Which Is Damaged Or Weak And Put It In The Scrap Yard And Give A Satisfactory Trial By Erecting The Foaming Chamber With The Given New 8 Or 10 Mm Thick Plate As Before. ( Lamsum ) Removal Of Gully Body Of 16 Inch Angle Valve Of Juice Heaters Vapor And Exhaust And Modding With New 10 Mm Thick Plate And Giving Trial. ( Lamsum ) Cutting Out The Damaged Vatum Tank ( Measurement 2.25 X 2.45 M Approx ) Of Water Weighing Scale And Making A New One With 10 Mm Plate. Preparing And Giving Trial As Before By Installing Related Pipe Line Nipple Support Etc. By Cutting The Side Plate Of The Overhead Hot Water Tank Removing And Fitting A New One From 8 Or 10 Mm Plate And Giving A Satisfactory Trial Removal Of Damaged Watm Tank Of Juice Weighing Scale, Replacement Of Tank With New Plate And Giving Trial. Laga 17 Meet G00 Meet Unnali Nima Removal Of Damaged And Damaged Internal Parts Of Vapor Cells And Service Cells Fitted In Quad Bari, Installation And Trial Of New Ones. ( Lamsum ) ( Size 2 X 1.5 M 0 ) Taking Out The Tubes, Weighing Them And Depositing Them In The Store. Old Brass Or Ss Of Juice Heater And Semi-Condenser Weighing Out Old Brass Or Ss Tubes Of Quad And Vapor Cells And Depositing Them In The Store. Expanding Juice Heater And Semi-Condenser By Fitting New Brass Tube Or Ss Tube And Giving It Hydraulically At 75 To 100 Psi. Expanding Quad And Vapor Cell By Fitting New Brass Tube Or Ss Tube And Giving It Hydraulically At 75 To 100 Psi. Taking Out The Quads External Catcher And Replacing It With A Sore Agile Channel And Flat Iron Trial Give . ( Lamsum ) Calendrias Condensate Box With Quad Body And Vapor Cell Cutting Out The Semi-Condenser Vapor Cell, Bottom Saucer Of Quad Along With Valve, Pipe Line And Nipple Etc. Making Bottom Saucer From 10 Or 12 Mm Plate As Before And Giving Trial By Fitting Related Pipe Line Nipple And Valve Etc. ( Lamsum ) Open The Top Cover Of The Semiconductor To Take Out The Tube And After Applying The Packing, Tie The Cover As Before And Give It A Trial. Open The Top Cover Of The New Semiconductor To Take Out The Tube, Re-Tie It With A Joint And Give It A Trial. Re-Fabrication Of External Catcher / Vapor Body Of New Semi-Condenser ( 1000 Sq. M ) From 8 / 10 Mm Plate With Die Cut. ( Size Dia 25M Height 3.5M ) / ( Size Dia 2.5M Height 3.5M ) Dismantling The Quad Catcher Bottle And Putting It In The Scrap Yard And Making A New Bottle Of 1.2 M Long X 0.6 M Dia From 10 Mm New Plate And Making Connection And Giving Vacuum Trial. ( Lamsum ) Cutting Out The Corroded Distributor Of The Pan And Putting It In The Scrap Yard And Making A New One From 8 Or 10 Mm Plate, Stranding And Giving Trial. Cutting Out The Damaged Umbrella Of The Pan And Making A New One From 6 Or 8 Or 10 Mm Ms Plate And Its Stranding And Trial. ( Lamsum ) Weighing Out The Old Brass Tubes Of The Pan And Depositing Them In The Store. Expanding By Fitting New Brass Tube In The Pan And Giving It Hydraulically At 100 Psi. Take Off Damaged Pan Catcher And Dump In Scrap Yard And Make A New One From 8 Or 10 Mm Plate And Give Trial By Fitting Element And Vapor Pipe As Before. ( Dia 1.5M X 2.5M Height ) Cutting Out The Cyclone Stuck Above The Sugar Dust Miller Tank And Replacing It With 5 Or 6 Mm. The Knotted Left Suit Of 1350 Kt Centri Machine. Remove It And Make A New One From 3 Mm Plate. Down The Transit Heater Mounted On The Top Of The C-Sentry0 Machine. Cleaning By Removing Its Side Plates, Blinding The Leaking Tubes And Hydraulically Placing Them In Place. Putting On And Making All Connections. Opening The Blind Fitted In The Pipeline Of The Spray System. Replacement Of Corroded Nozzle Cluster, Cleaning, Replacement Of Corroded Branch Pipe Line And Tie All Blinds Opened After Cleaning And Satisfactory Trial Of The System. By Removing The Worm Wheel Of Vacuum Crystallizer And Crystallizer, Replacing Its Cut Gun Metal Bush. After That, By Putting The Worm Wheel Again In Its Place, The Same | Alignment Of Worm Shaft Rg Box Motor And Successful Trial. Make The Corroded Side Cover And Top Corroded Plate Of Id Fan Fixed On Sugar Dust With 8 Or 10 Mm Plate And Replace All The Angle Channels Attached To Its Bottom Frame By Strengthening And Placing It In Place. ( Lamsum ) Removing The Old Tail Pipe Attached To The Pans And Sending It To The Scrap Yard And Fitting The New Ss Tail Pipe And Giving A Trial. ( Lamsum ) Removal Of Corroded Side Plates And Roof Plates Of Boilers And Replacing Them With 3 Or 5 Mm Thick Plates Of Ms And Fixing The Old Ones With Correct Plates. Cutting Out The Corroded Plates Of Flue Gas Ducting Of Boilers And New Ms Of 5 Mm Thickness. Placing A Plate Dismantling Of Damaged Parts, Side Plates / Shells / Cones Etc. At Various Places And Fabricating Them With New Plates. Installation And Trial. Cutting And Replacing Corroded Plates Of Id Fans. Removal Of Damaged Expansion Joint Fitted In Flue Gas Ducting Of Boiler No. 1 And 2 And Fitting New One From 3 Or 5 Mm Plate. Cutting Out The Damaged Ash Soot Of Boilers And Making New Soot From The Given Plate Plate And Giving Trial. Cutting Out The Corroded Part Of The Bagasseol Suit And Blower Installed Below The Bagasse Elevator And Patching It With A New Plate. Replacement Of Throated Suit Of Bagasse Feeder Of Boiler No. 1 And 2 With Ms Plate Of 6 Or 8 Mm. Cutting Out The Corroded Manholes Of Flue Gas Ducting Of Boilers And Vat Scrubbers And Making And Installing New Manholes. Cut Out The Defective Mesh Fitted In The Bagasse Elevator And Give A Trial By Fitting A New Mesh. Cut The Old Drain Vessel Tank Of Bat Scrubber No. 1 And 2. Removal Of Tax And Fitting Of New Tank And Drain , Pipe Welding. Removing The Broken Bed Of Transmission Gear Of Mills And Making A New One From The Given 40 And 25 Mm Plate. After Placing All The Plumber Blocks In Place, After Aligning Them, The Transmission Gears. Successfully Trial By Putting It In Place. , Removal Of The Screw Conveyor Installed On The Mill House And Replacing It With A New Screw Conveyor Made Of 6 Mm Plate, Alignment And Satisfactory Installation. To Give A Trial , Cut And Remove The Damaged Top Cover Of Trpf Of The Mill And Make It According To The Sample From The Given 8 / 10 Mm Plate And Place It Accordingly. Removal Of Drive And Stool Of Molasses Conditioner By Cutting And Making A New One And Repairing And Fitting The Cut Shaft By Welding And Give A Satisfactory Trial. Cutting Out The Entire 40 Cm Perimeter Of The Taper Cone Of The Pans And The Cell Adjacent To It And Cutting Out The Washing Coil Inside It And All The Connections Related To It And Fabricating It From 10 Or 12 Mm Plate And Putting It In Place And Making All The Connections Related To It And Doing A Satisfactory Trial B. Magma Mixer Or Pugmill Making A New 6 Meter Length From New Or Old Plate Of 10 Mm And Putting It In The Scrap Yard. Cut The Gutter Inside The Mixer From Inch Size Pipe And Fit All The Arms And Run And Give A Satisfactory Trial. To Take Down The Bagsilon Pipeline After Digging It And Giving It A Trial By Fitting It At A Height Of 14 Meters By Applying Necked Pipe Band Support Clamp Etc. ( Lamsum ) Removal Of Old And Damaged Rail Of Bridge Of Cane Unloader And Installation Of New Rail Given In Its Place And Trial By Strengthening It. Cutting Out The Rotten Main Holes Of Boiler No. Removing The Corroded Top Cover Of The Tee Above The Pans And Making A New One From 10 Mm Plate And Giving A Satisfactory Trial. ( Lamsum ) Removal And Replacement Of Worn Out Water Coils Of Crystallizers And Satisfactory Cutting Out The Corroded Distributor Plate Of Pans And Fitting A New One And Giving A Satisfactory Trial. ( Lamsum ) Pan Station Condenser And Catalyser Necked. Fixing Of Platform Made From Old Plate. Dismantling Of Damaged Rectangular Melter Of Film Type Sulfur Burner And Replacing It With Given 8 / 10 Mm M.S. Plate ( Size 3.0M X 2.0M X 1.75M ) After Completing All Work And Trial ( Lamsum ) 8 Or 10 | Making A New One From M.M. Plate, Making Connection Of Vapor Pipe, Stranding As Per Requirement And | To Give A Trial ( Lamsum ) Cutting Out The Left Saucer Of The Pans And Re-Welding Them By Fitting Rings And Giving A Satisfactory Trial. ( Lamsum ) , Remove The Old Tray Of The Hopper And Put It In The Scrap Yard, Make A New One From 3 Or 5 Mm Plate And Give A Satisfactory Trial. ( Lamsum ) Taking Out The Plate Of Corroded Down Take Of The Pans And Making A New One By Bending It From 8 Or 10 Ms Plate And Giving A Satisfactory Trial. ( Lamsum ) Correct Cutting And Alignment Of Base Box Of Bagasse Carrier And Runner Of Rbc To A Satisfactory Level To Give A Trial Modified Sugar Shoots Of Graders In Dryer House || To Do And Give Satisfactory Trial. Dismantling The Taper Core Of The Maceration Water Tank, Making A New One, Facing The Seat Of The Taper Cone Of The Tank And Cutting The Center Rod In The Old Pipe And Fitting The Center Rod In The New Pipe And Balancing The Tank And Giving A Satisfactory Trial. ( Lamsam ) Cut Out Old Hopper And Make Hopper By Bending It With New Plate And Make Its Frame With Angle, Aligning Driving Shaft By Fitting And Giving Satisfactory Trial. ( Lamsum ) Cutting And Dismantling The Old Melted Sugar Melter, Removing The Reduction Gear And Motor Mounted On It, Making Sugar Melter From The Given New Plate And Shaft. Alignment By Fitting The Reduction Box And Motor Etc. And All The Pipelines Related To It. Making Connections And Giving Satisfactory Trials. ( Lamsum ) , Removal Of Old Box Of Old Semiconductor And New Box From Given 10 Mm Plate 850 C 850 | Welding From Inside And Outside After Making Mm Size And Fitting The Boxes On Top Of The Semiconductor. By Removing The Old Double Beat Valve On The Juice Heater. 20 Given To Install New Beat Valve In Its Place. Making Frame / Base From Mm Plate, New Double. Fitting Beat Valve And Giving Satisfactory Trial. To Install A New Centrifugal Machine, Its Platform Was Removed. After Installing The New Machine, Prepare Its Beam Structure. Installation And Re-Platforming. ( Lamsam ) Strengthening Of The Header Of Vapor Lawn Juice Heater And Removing The Cover Of Juice Heater, Repairing The Cover And Fitting The Cover. ( Lamsum ) Fitting A New Vertical Pump In The Injection House With A Motor Etc. On Top Of It And Installing A 20 Meter Pipe Line Of 650 Mm Diameter Related To It And Making Three Bands Of 650 Mm Dia Related To It And Giving A Successful Trial Of The Pump. ( Lamsamm ) Cutting Out All The Coils And All The Nails Attached To The Compartment Of The Clarifier And Fitting Them In Place After Completion Of The Work. Cleaning The Surface Of The Vertical Side Plates Of The Compartment Of The Clarifier And Overlapping With The Given 6 Mm Ms Plate And Cutting And Fitting The Given Ms Plate And Flat Iron At The Remaining Places And Giving Leak Proof Trial After Complete Welding Work. ( Dia 30 Ft, Height 5 Ft ) ( Lamsam ) To The Choked Distributor Of The Clarifier Compartment. Cut Out And Put In Scrap Yard And Given 6 / 8 | Making And Fitting A New One From Mms Ms Plate. Give A Satisfactory Trial By Doing All The Work. ( Lamsum ) Fabricate The Weak Cell Of Juice Sulphiter With The Given 10 Mm Ms Plate And Fit It By Overlapping It All Around And Do All The Connections Etc Related To It And Complete All The Welding Work. Give A Satisfactory Trial. ( Lamsum ) Running A Reamer To Make A Hole Sign In The Tube Plate Of Juice Heater, After Making A Hole Sign, Fitting All The Tubes ( 312 Nos. ) And Expanding Them From Both The Places. Giving Satisfactory Hydraulic Trial. ( Lamsum ) Cutting Out The Damaged Taper Cone, Sewal, Cell ( From The Top Of The Tube Plate ) Of The Pan And Fabricating It With A New 12 Mm Ms Plate And Fixing All The Connections Related To It As Before And At Different Places Throughout The Cell From Inside. All Connections Related To The Syrup Tank Located On The Pan. Cutting And Removing The Platform, Staging Etc. And Cutting And Removing The Syrup Tank And Putting It In The Scrap Yard And Making A New Syrup Tank By Fabricating It From The Given 6 Mm Plate And Fitting It In Place And All Related To It. Making Connections Etc. And Giving A Satisfactory Trial After Completing All The Work. ( Lamsum ) Ci Sluice Valve 24 Dia Located On The Ejection And Nrv And All The Connections Related To It Cut Off And Put In The Scamp Yard And In Its Place The New Pop-Up Valve Given 24* Dia Is Modified. Completion Of Work And Giving Satisfactory Trial. ( Lamsam ) , Making And Fitting A Siphon Of 150 Mm And Giving A Satisfactory Trial. Making And Fitting Siphons Of 100 Mm Dia And Giving Satisfactory Trials. ( Lamsum ) Installing Flowmeters At Different Places And Giving Satisfactory Trials By Fitting Related Nipples, Beds, Flanges And Siphons Etc. Dismantling The Damaged Mesh Of The Saxon Pipe Located On The Injection And Making And Fitting A New One From The Given Ms Plate. Removing The Drive Of Mechanical Circulator Mounted On Pan No. 6 And Cutting Out The Base Plate Of The Drive And Preparing 1100 Mm Dia Base Plate From 25 Mm Ms Plate. Stop The Shaft By Giving Support And Align It By Fitting Bush, Fit The Motor By Putting Stand And Give Satisfactory Trial. ( Lamsum ) Cutting Out The Damaged Plate Of The Shell Near The Roof Of Sheera Tank No. 1 And Replacing It With A New One Made Of 06 Mm Plate And Replacing The Related Connections And Giving A Satisfactory Trial. ( Lamsum ) The Boiler Installed In The Mill Was Completed By Taking Out The Id Fan Of 42 Kg Pressure Capacity. Removing The Casing From The Foundation, Taking The Newly Ordered Casing And Fan To The Site In Its Place And Removing The Ash Chute And Machine Falling On The Way And Re-Installing The Ash Chute And Machine, After That Placing The Casing On The Foundation, Water. Labeling And Id According To The Damper Of The Fan. After Installing And Fixing The Casing, Do The Modification In The Ducting Of The Id Fan, And Then Put The Id Fan In The Main Shaft Casing. Fixing Cover And Alignment On Satisfactory Trial Rbc Pillar With Ms Pipe / Angle / Channel. Build And Install A Tin Shed ( Lamsam ) Cutting Out The Damaged Casing Of Bagasillo Fan And Making A New One From The Given 8 Mm Ms Plate. Installation And Satisfactory Trial. Dismantling The Damaged Channel, Angle And Beam Etc. Of The Platform Located On The Crystallizer And Fitting The Given Channel, Beam And Angle Etc. ( Lamsum ) Dismantling The Entire Ms Plate Casing ( Length 17 M ) Of Sugar Elevator And Modifying It With The Given Ms Plate And Fixing It In Place. Take Down The Sugar Grader And Dismantle All The Damaged Angle Channels And Plates Etc. And Replace Them With The Given Ms Channels, Angle Plates Etc. And Give A Satisfactory Trial By Putting Them In Place. ( Lamsum ) After Dismantling The Trpf Bottom Cover Of The Mill, Put It In The Scrap Yard And Make The Cover From 8 / 10 Mm Plate And Fit It In Place And Give It A Trial. ( Lamsum ) Removing The Damaged Juice Tray ( Which Is Mounted On The Mill Head Stocks ) Of Trpf Rollers And Putting It In The Yard And Replacing The New Tray With The Newly Given 8 / 10 Mm Plate. Placement ( Lamsum ) Cutting Out The Damaged Furnace Suit Of The Boiler And Fixing It By Making Of 6 / 10 Mm Plate ( Lumsam ) Juice Tank Size 1.4 M Dia, 1.5 M Length Installed At Mill No. 01, Remove The Damaged One And Put It In The Scrap Yard And Make Juice Tank From The Given 8 / 10 Mm Plate And Do The Erection In Place And Give Trial By Connection As Before. ( Lamsum ) Juice Tank Size 1.3 Meter Dia, 1.5 Meter Length Installed At Mill No. 02, Remove The Damaged One And Put It In The Scrap Yard And Make Juice Tank From The Given 8 / 10 Mm Plate And Make Erection In Place And Give Trial By Connection As Before. ( Lamsum ) Juice Tank Size 1.0 M Dia, 1.5 M Length Installed At Mill No. 03, Removing The Damaged One And Putting It In The Scrap Yard And Making Juice Tank From The Given 8 / 10 Mm Plate And Erecting It In Place And Like Before Connection And Trial. ( Lamsum ) Juice Tank Size 1.0 M Dia, 1.6 M Length Installed At Mill No. 04, Remove The Damaged One And Put It In The Scrap Yard And Erect The Juice Tank From The Given 8 / 10 Mm Plate And Do The Erection At The Place And Give The Trial Connection As Before. ( Lamsum ) Remove The Damaged / Leakage Juice Tank Installed On The Skin Juice And Put It In The Scrap Yard And Erect The New One From The Given 10 / 12 Mm Plate And Give Trial By Making Related Connections Etc. Mill No. Remove The Gutter Installed On 01 Which Is Damaged And Put It In The Yard And Make A Gutter With The Given New Pipe Line / Plate And Install It At The Place And Give A Trial Connection. ( Lamsum ) Juice Tank Size 2.15 M Dia, 3.0 M Length Installed On The Skin Juice Pump, Removing The Damaged / Leakage Tank And Putting It In The Scrap Yard And Erecting A New One From The Given 10 / 12 Mm Plate And Removing The Damaged Watm Guard Of Cow Pinion Of Mill No. 01, 02 And 03 And Putting It In The Yard And Fitting The Cover Guard According To The Sample From The Given New 2 / 3 Mm Plate. ( Lamsum ) Removing The Damaged Top Guard Of Cow Pinion Of Mill No. 01, 02 And 03 And Putting It In The Yard And Fitting The Cover Guard According To The Sample From The Given New 2 / 3 Mm Plate. ( Lamsum ) Mill No. Removing The Damaged Watm Guard Of 04 Cow Pinion And Putting It In The Yard And Fitting The Cover Guard With The Given New 2 / 3 Mm Plate As Per The Sample. ( Lamsam ) Mill No. Removing The Damaged Top Guard Of 04 Cow Pinion And Putting It In The Yard And Fitting The Cover Guard According To The Sample From The Given New 2 / 3 Mm Plate. ( Lamsam ) Mill No. Making Scraper Of Under Feed Roller As Per Sample From Given New 12 / 16 Thick M.S. / S.S. Plate / M.S. Rod / M.S. Square As Per Damaged Scraper Of Under Feed Roller Of 04 And Giving Satisfactory Trial ( Lamsum ) Mill No. Increasing The Length Of Interrack Carrier By Cutting The Tail End Of Interrack Carrier Installed On 04 And Giving Satisfactory Trial By Jointing Runner, Side Plate And Labeling The Drive Shaft And Tail End Shaft Line ( Lumsum ) . Mill No. Cutting And Removing The Bed Of The Last Motion Of The Transmission Gear Of 03 And Making The Bed As Before From The Given New 25 / 40 Mm Plate And According To The Plumber Block, Drill For The Bolts Etc. And Give A Satisfactory Trial. The Line Of 20 Ton Capacity Eot Can Installed In The Mill House Has Been Cut At Several Places, Repair It And Replace The Rail As Per Requirement And Postpone It Satisfactorily. ( Lacsum ) C.I. Sluice Valve 24 Dia Located On The Sprue And Cut All The Connections Related To It And Put It In The Scrap Yard And Replace It With The New Popup Valve 24* Dia, Modified To Fit It And After Completing The Work, Give A Satisfactory Trial. ( Lamsam ) Dismantling The Resistance Box And Making A New One From The Given M.M. Plate And Fixing And Strengthening As Per The Location And Giving Leakproof Trial By Welding. ( Lamsam ) Cutting Out The Damaged Monitor Casing And Ribs Inside The Centi Machine And Fabricating It With New 12 Mm Ms Plate And Giving A Satisfactory Trial Of The Work. ( Lamsum ) Completely Cutting Out The Taper Cone Of The Dome Of Pan No. 3 And Making A New One From 12 Mm New Ms Plate. ( Lamsam ) Completely Cutting Out The Taper Cone Of The Dome Of Pan No. 3 And Making A New One From 12 Mm New Ms Plate. ( Lamsum ) Cutting And Removing The Necked Box Of The Telescope Of The Door And Making The Box From The Given Plate, Installing A New Pipe Line Of 150 Mm Size For The Valve, The Upper Cover, Welding And Trial By Fixing It. ( Lamsam ) De-Installation Of Platform, Pipe, Tack, Left Cone Etc. Under Body No. 2 Of Old Quad Set And De-Installation Of Claydria And Erection Of New Claydria And Satisfactory Vacuum Trial After Completing All Related Work. ( Lamsum ) Cut The Ci Sluice Valve 12 Dia And Nrv And All Its Related Connections On The Injection And Put It In The Scrap Yard And Complete The Work By Modifying It To Make Popup Valve 12 Dia Instead And Give A Satisfactory Trial. ( Lamsam ) Old Corroded Band Of Saxon Pipe Of Ejection And Spray Pump, Cut The Reducer And Put It In The Scrap Yard And Cut And Clean The Flange And Make A New Band And Reducer And Fit It And Test It By Welding. Decommissioning Of Faulty Cyclone, Mud Tank Box, Flavor Valve Etc. Fitted On Vacuum Filter And Making New Ones From The Given 5 Mm Plate And Making Box Flapper Valve And Making Stents From Boiler Tubes, Making Platform And Giving Trial By Doing All The Work. Cut Out The Side Plate Of The Vacuum Filter ( Size 14 26 ) And The Damaged Plate Of The Left Tray And Fix It By Making It From The Given 10 Mm Ms Plate And Fit All The Connections ( Nipples, Box Band ) Etc. And Test It By Leak Proof Welding. ( Lamsam ) Cleaning Of The Egil Fitted In The Top Above The Clarifier And Overlapping With The Given 6 Mm Ms Plate And Egil ( 50 X 50 X 6 Mm ) Cleaning The Surface Of The Left Plate Of The First Compartment Of The Clarifier And Cutting The Bud Of The Given 8 Mm Ms Plate. 100 Mm Hole In Bud. Overlapping With Cut Plate And Vertical And | Flat Iron On All Periphery Plate With Watm Plate | Giving Leak Proof Trial By Applying. ( Lamsam ) The Element Of The Catcher ( Size 75 X 75 X 8 Mm ) Should Be Made At An Angle To The Pan. ( Lamsum ) Dismantling The Damaged Scroll Of Mud Mixture And Fixing It By Making A New One From The Given 4 Mm Ms Plate. And Give Trial By Applying Like Before. Semi Condenser ( 800 M2 Heating Surface ) Cut Out The Damaged External Catcher And Fix It With The Given 86 10 Mm Ms Plate As Before And Make All Related Connections Satisfactory. To Give Size 2.5 Meter Cup X 2 Meter Height ( Lamsum ) Cut And Remove The Damaged Shell ( Above The Tube Plate ) Of Semi Condenser ( 1000 M2 Heating Surface ) And Fix It By Making A 3.5 M X 4.5 M Height Cup From The Given 10 Mm Ms Plate And Give A Satisfactory Trial By Making All The Related Connections. ( Lamsum ) Cut Out The Damaged Shell ( Above The Tube Plate ) Of Syrup Sulphiter And Fix It By Making A 2.5 M X 7.5 M Height Cup From The Given 8 / 10 Mm Ms Plate And Give A Satisfactory Trial By Making All The Related Connections. ( Lamsam ) All Damaged Cooling In Crystallizer No. 6 And 7 Dismantle With Quay A Center Shaft A Worm Wheel Drive Throwing It In The Scrapyard. ( Lamsum ) Making Coil Of 200 Meter Square Cooling Surface In Crystallizer No. 6 And 7 With Given 3 / 4 Dia Ms Pipe As Per Drawing And Giving Trial By Hydraulic Testing On 75 Chap And Related To It. , Damaged Agitator Of Vacuum Filter Size 14 X 26. Cutting Out And Ms Angle Channel Etc. Prepare And Install A New Agitator As Before And Trial It After Doing All The Work Related To It. ( Lamsum ) To Keep The Clear Juice Filtration Tank At A Height Of 4 Meters, Make And Install Four Columns With Ms Channel And Ms Angle And Keep The Tank With Ms Beam And Boiler Tube. Making Platform, Completing All Related Work Including Railing And Giving Trial. ( Lamsum ) , Repairing Of Damaged Rail / Square War Of Cane Unloaders And New Rail / Square War As Per Requirement. Give A Satisfactory Trial By Applying It. ( Lamsum ) , The Front Plate Of Donali Shoot Installed On Mill No. 1 Has Melted, Removing It From The Side And Replacing It With A New Plate Of 8 Mm Thick, Preparing The Support Of Ms Flat And Fitting It On The Side. , Give A Satisfactory Trial. ( Lamsum ) The Front Plate Of The Donali Shoot Installed On Mill No. 2 Has Melted, Which Should Be Removed From The Side And Replaced With A New Plate Of 8 Mm Thick, Prepared With A Support Of Ms Flat And Fit On The Side And Give A Satisfactory Trial. ( Lamsum ) The Runner Base Of Inter Rack Carrier Of Mill No. 1 Has Melted, After Removing It, Replacing The Runner Base On Both Sides With 150 Mm Channel And Giving Satisfactory Trial. The Base Channel Of Mill No. 1S Inter Rack Carrier Dome Has Melted, Which Needs To Be Dismantled And Removed And Replaced With A Channel Of 150 Mm. Give A Satisfactory Trial. Cutting The Watm Trough And Side Plate Of Inter Rack Carrier No. 3, Welding It By Applying A 6 Inch Wide 8 Mm Thick Plate And Giving A Satisfactory Trial By Aligning It. ( Lamsam ) Erection Of Fabricated M.S. Pipe Of Different Sizes. To Do And Give Leak Proof Trial. Of Sugar Of Ram Of A-Frame Of Mill No. 02. The Collar / Flange Which Is Broken, Re-Fitting The Ring / Collar At The Mill Site And Reboring The I-Valves In The Pin Holes Of The Head Stock Of The Head Stock Of The Satisfactory Trial Mill No.02 At The Mill Site. , For Conversion Of Hydraulic Liners Of Mill No. 03 And 04. Build On Wornout Ss On The Side Plates Of The Fibrizer. Removal Of Plate / Liner And Trial By Fitting The Given New Ss Plate On Bottom And Top Side Plates And Refactor Plate. , Cut Out All The Damaged Cooling Pipe / Arm Fitted In The Generator And Make A River / Arm By Bending 16 Mm Flat Iron As Required. Installation And Satisfactory Trial. Cutting Out The Partial Plate Of The Damaged Top / Bottom Header Of The New / Old Vapor Line Juice Heater And Bending It With 12 Mm Thick Plate And Applying Reverse For The Heater Strip And Completing All The Work And Giving A Satisfactory Trial. Remove The Damaged Plate Of The Side Plate And Bottom Tray Of Vacuum Filter Size 8X16 And Fix It Made Of Given 10 Mm Ms Plate And Give Leak Proof Trial By Making All The Connections. Cutting Out The Intermediate Tray Of The Clarifier And Fitting A New One From The Given 8 Mm Plate And Completing All Related Work And Giving Leak Proof Trial. Cut Out The Chipper Cone Porson 5450 ( Approx. ) Fitted Between The Calandria And The Cell Of The Pans And Give A Satisfactory Trial After Making All The Connections In Place By Making It Out Of 12 Mm Thick Plate. , In The Aeration Tank Installed On E.T.P., Make A Line By Making A Header In 4 Inch Dia And Make 140 Pieces Of Eight Holes Of 1.10 Meters From The Pipe Coming Out Of The Old Super Heater. Taxation And Satisfactory Trial.