| 1 | Dismantling, Fabricating & erection from M.S plate in size 5mm to 8mmM.S Pipe |
| 2 | M.S Bends |
| 3 | Tee Nipple |
| 4 | Cone & Reducer |
| 5 | Vessels |
| 6 | Patch work |
| 7 | Replacement & Erection of any size M.S pipe line up to 12” (Readymade Pipe) |
| 8 | Replacement & Erection of any size M.S pipe line 14” to 24” (Readymade Pipe) |
| 9 | Replacement & Erection of any size M.S pipe line above 28” (Readymade Pipe) |
| 10 | Replacement & Erection of any size M.S flange |
| 11 | Replacement & Erection of any size M.S bends |
| 12 | Fabrication , erection & replacement of any size M.S bend from M.S pipe up to 12” |
| 13 | Fabrication , erection & replacement of any size M.S bend from M.S pipe above 12” |
| 14 | Fabrication , erection & fitting of M.S cross from M.S pipe up to 6” |
| 15 | Hand Hole connection nipple in fabricated valve up to 10” complete with bend & flange |
| 16 | Replacement & Erection of any size valves fitting |
| 17 | Fabrication , erection of reducer from any size |
| 18 | Fabrication , Erection of any size Blind |
| 19 | Fabrication , Erection of any size Tee/ Nipple (M.S) having size up to 14” |
| 20 | Fabrication , Erection of any size Tee/ Nipple (M.S) having size above 14” |
| 21 | Evaporator Body Tube Dismantling (Leaky tube dismantling ,which found during hydraulic testing) |
| 22 | Evaporator Body Tube Dismantling (complete dismantling of tubes of complete calandria) |
| 23 | Evaporator Body Tube fitting with hydraulic testing (Leaky tube fitting which found during hydraulic testing) |
| 24 | Complete Evaporator Body Tube fitting with hydraulic testing (complete fitting of tubes of complete calandria) |
| 25 | Juice Heater Tube Dismantling (Leaky tube dismantling ,which found during hydraulic testing) |
| 26 | Juice Heater Tube Dismantling (complete dismantling of tubes of complete calandria) |
| 27 | Juice Heater Tube fitting with hydraulic testing (Leaky tube fitting which found during hydraulic testing) |
| 28 | Juice Heater Tube fitting with hydraulic testing (complete fitting of tubes of complete calandria) |
| 29 | Fabrication of Bedsand erection of pumps havingup to 20 H.P motor with it’s alignment . |
| 30 | Fabrication of Bedsand erection of pumps havingabove20 H.P motor with it’s alignment. |
| 31 | Dismantling, Fabrication & erection of coil for any equipments |
| 32 | Fabrication & erection of I.B.R Pipe lines |
| 33 | Erection of I.B.R Bends |
| 34 | Erection of I.B.R Flanges |
| 35 | Erection of I.B.R Valves |
| 36 | Replacement of Molasses tank worn out sheets |
| 37 | Dismantling and shifting of any type of scrap items in scrap yard. |
| 38 | Laboursupply (per day 8 hours basis)Fitter |
| 39 | Welder |
| 40 | Khalasi |
| 41 | Helper |
| 42 | C.I / F.R.P cross (Readymade) fitting |
| 43 | Dismantling, Fabrication & erection of any size M.S gutter |
| 44 | Dismantling, Fabrication & erection of Sulphur gas coolers (Dia 900mm x height 1770mm ) as per our existing size & design complete in all respect of Sulphur furnace |
| 45 | Dismantling, Fabrication & erection of umbrella with staging as per our design of evaporator body, Size-3500mm Dia and thickness – 6mm |
| 46 | Dismantling,Fabrication & erection of Light & Heavy Filtrate bottles (Dia-600mm x height – 1280mm) as per our existing size & design of vacuum filters |
| 47 | Dismantling, Fabrication & erection of Stool rest on beam of evaporator body along with it’s leveling |
| 48 | Replacement & Erection of S.S pipes having size up to 12” |
| 49 | Replacement & Erection of S.S Readymade Flange having size up to 12” |
| 50 | Replacement & Erection of S.S Readymade Bends having size up to 12” |
| 51 | Fabrication , erection & replacement of S.S Bend from S.S pipe having size up to 12” |
| 52 | Fabrication , erection of any size Tee/Nipple of S.S having size up to 14”. |
| 53 | Dismantling,Fabrication & erection of Main Hole upto 24” |