Supply And Installation Of Passive Components For New It Infrastructure Phase I At Cooch Behar Panchanan Barma University , Description , 6 Core Mm Fiber Optic Cable (Armoured ) , 6 Core Sm Fiber Optic Cable (Armoured ) , 12 Core Sm Fiber Optic Cable (Armoured ) , 12 Port Mm Lc Type Loaded Rack Mount Liu , 24 Port Mm Lc Type Loaded Rack Mount Liu , 12 Port Sm Lc Type Loaded Rack Mount Liu , 24 Port Sm Lc Type Loaded Rack Mount Liu , Lc-Lc Duplex Multi Mode Fiber Patch Cord - 2 Mtr , Lc-Lc Duplex Singlei Mode Fiber Patch Cord - 2 Mtr , 4-Pair Cat-6 Utp Cable (Box Of 305 Mtr) , Cat 6 24 Port Loaded Pannel , Cat 6 I/O , Single Port Face Plate , Pvc/Gi Back Box 3 X 3 , Cat 6 Utp Patch Cord 1 Mtr. , Cat 6 Patch Cord 2Mtr. , 19 42U Floor Mount Rack With All Accessories(Fan,Cable Tray,Cable Manager-2 Nos,Pdu,H/W Pkt-20Nos) , 19 22U Floor Mount Rack With All Accessories(Fan,Cable Tray,Cable Manager-2 Nos,Pdu,H/W Pkt-20Nos) , 19 12U Floor Mount Rack With All Accessories(Fan,Cable Tray,Cable Manager-2 Nos,Pdu,H/W Pkt-20Nos) , 1.25 Diaflexible Pvc Pipe , 1 Diapvc Conduit Pipe (Isi-Lms) , Pvc Saddel 1 Dia , 75Mm X 50Mm Pvc Box Casing , 2Flexible Pvc Pipe , Route Marker , Hdpe Pipe 40/32 , Push Fit Hdpecoupler , 25Mm Gi Pipe (Isi - B Grade) , 1 Kva Ups (Online) With 30 Minute Backup, Battery& Rack Interlink Cable , 2 Kva Ups (Online) With 30 Minute Backup, Battery& Rack Interlink Cable , Laying Of 6 Core Optical Fiber Cable With Hdpepipe , Laying Of 12 Core Optical Fiber Cable With Hdpepipe , Installation Of Lius(24 & 12 Ports) In Racks , Splicing Of Optical Fiber Cable Per Core , Fiber Testing With Otdr Per Core & Sitecertification , Laying Of 4 Pair Utp Cable Through Pvc Conduit/Flexible Pipe , Fixing & Termination Of Cat 6 Loaded Jack Panel , Termination Of Information Outlets , Fixing Of Back Box & Face Plate , Utp Nodes Testing (Penta Scanning) & Sitecertification , Installation Of 12U Wall Mounting Rack Withanchor Fastener Bolt , Installation Of 22U Floor Mounting Rack , Installation Of 42U Floor Mounting Rack , Installation Of 1 Kva Ups Withbattery , Installation Of 2 Kva Ups Withbattery , Hard Soil Trenching & Back Filling - 1 Mtr Depth (Without Bricks & Sand) , Soft Soil Trenching & Back Filling - 1 Mtr Depth (Without Bricks & Sand) , Fixing Of Pvc Pipe , Fixing Of Pvc Box Casing , Wall Conceal (Chase Cutting) , Laying Of Gi Pipe , Laying Of Hdpe Pipe , Fixing Of Route Marker , 1M X 1M X 1M Manhole Supply With Installation , Boring (40 Mm)