Piping For Routing Of Srp-2 Dual Media Outlet Water To Srp-1 U / F Feed Sump At Cpcl Manali , Sor Heads Are For Modification Jobs In 6 Inch Hdpe Pipelines At Offsite Area. , Supply Of Hdpe Piping ( Pn10 ) . , Pipe, Size : 160Mm , Supply Of Hdpe Elbows 90 Deg And 45 Deg. , Elbow, Size : 160Mm , Supply Of Hdpe Equal Tee ( Pn10 ) , Equal Tee, Size : 160Mm , Supply Of Hdpe Stub Ends ( Long Neck Collar ) . , Stub End, Size : 160Mm , Carryout Butt Welding Of Hdpe Pipes And Fittings Including Erection As Per Requirement ( Unit Of Measurement Ea = Each Joint ) , 160Mm - Joint , Supply And Erectionof Msflanges In Hdpe Pipes , Flange, Size : 160Mm , Note: This Includes Supply & Erection Of Ms Flange As Slippery Lap Joint With Stub Ends. , Supply And Erectionof Ball Valve In Hdpe Pipes , Ball Valve #150, Size : 160Mm , Supply Of Butyl Rubber Gasket Size:160Mm , Provision Ofbrick Supports For Hdpe Pipeline Laying As Per Drawing No-600-A-26184 , Earthwork In Excavationinall Types Of Soil , Includingsoft Or Hard Murrum, But Excluding Soft And Hard Rock, Using Mechanical Means ( Hydraulic Excavators ) / Manually For Depth Upto 1.5M, Including Removal Of Vegetation, Shrubs And Debris, Cutting And Dressing Of Sides In Slopes, Levelling, Grading And Ramming Of Bottoms, Dewatering Of Accumulated / Sub-Soil Water From Any Source And Keeping The Surface Dry For Subsequent Works And Disposal Or Stacking Of Excavated Material Within A Lead Of 100M, As Directed Including Providing Temporary Supports To Existing Service Lines Like Water Pipes, Sewage Pipes, Electricunderground Cables, Etc.All Complete As Per The Specifications And Directions Of Engineer-In-Charge. , Providing And Filling Fine Aggregate ( M-Sand ) Of Approved Quality In Floor, Foundation Etc. In Layer Of 15 Cm Thickness Including, Watering, Ramming, Consolidating Etc. Complete. , Providing And Laying Plain Cement Concrete 1:2:4 ( 1 Part Of Cement : 2 Part Of Fine Aggregate ( M Sand ) And 4 Part Of Stone Aggregate 20Mm Nominal Size ) In Foundation Below Footing Floor And Raft And Trenches Using Stone Aggregate Including Watering, Curing Ramming With Vibrator If Necessary All Labor And Material Complete As Per Direction Of Engineer In Charge But Excluding Cost Of Form Work , Providing And Laying Brick Masonry In Super Structure With Bricks Of Class 5.0 In Cement Mortar 1:4 ( 1 Cement: 4 Fine Aggregate ( M Sand ) ) For Allheightsincluding The Cost Of Materials, Labour, Tools And Tackles, Scaffolding / Staging, Sampling And Testing, Soaking Of Bricks, Cutting And Laying Of Bricks, Providing Recesses, Making Openings Of Any Shape And Size, Sealing The Gap Between Masonry And Soffit Of Beam / Slab, Embedding The Fittings, Curing, Etc. All Complete As Per Specifications, And As Directed By Engineer-In-Charge. , Providing 15Mm Thick Plaster In Cement Mortar 1:4 ( 1 Cement :4Fine Aggregate ) On Walls / Concrete Surfaces Including Cleaning, Hacking Of Concrete Surfaces, Scaffolding, Finishing, Curing Etc., For All Heights. , Construction Of Brick Supports As Per Attached Drawing => Limited