Annual Rate Of Hotmix Material For Various Roads Under (R&B) Division, Valsad (Providing Bsg, Bm, Sdbc, Mss, Asphalt Painting)- Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Heating The Aggregate And Asphalt By Batch Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp. (A) Lead Up To 25 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Heating The Aggregate And Asphalt By Batch Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp.(B) Lead Up To 25 To 50 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Heating The Aggregate And Asphalt By Batch Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp. (A) Lead Up To 25 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Heating The Aggregate And Asphalt By Batch Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp. (B) Lead Up To 25 To 50 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp. (A) Lead Up To 25 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp. (B) Lead Up To 25 To 50 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp.(A) Lead Up To 25 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp.(B) Lead Up To 25 To 50 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Asphalt Grade 60/70 (Vg-30) Grade Asphalt For Mixing @ 5.0 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (A) Lead Up To 25 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Asphalt Grade 60/70 (Vg - 30) Grade Asphalt For Mixing @ 5.0 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (B) Lead Up To 25 To 50 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Asphalt Grade 60/70 (Vg - 30) Grade Asphalt For Mixing @ 5.0 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (A) Lead Up To 25 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Asphalt Grade 60/70 (Vg - 30) Grade Asphalt For Mixing @ 5.0 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (B) Lead Up To 25 To 50 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (A) Lead Up To 25 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (B) Lead Up To 25 To 50 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (A) Lead Up To 25 Km,Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (B) Lead Up To 25 To 50 Km,Providing And Laying Bituminous Base Course 37.50 Mm Thick Compacted In Single Layer With Tack Coat Of Asphalt Vg-30 Grade At The Rate Of 2.5 Kg/10 Sqmt And Using B.T. Chips Of Required Gradation And Asphlat Vg-30 Grade For Mixing @ 1.99 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km,Providing And Laying Bituminous Base Course 37.50 Mm Thick Compacted In Single Layer With Tack Coat Of Asphalt Vg-30 Grade At The Rate Of 2.5 Kg/10 Sqmt And Using B.T. Chips Of Required Gradation And Asphlat Vg-30 Grade For Mixing @ 1.99 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 To 50 Km,Providing And Laying Bituminous Grout 37.50 Mm Thick Compacted In Single Layer With Tack Coat Of Asphalt Vg-30 Grade At The Rate Of 2.5 Kg/10 Sqmt And Using B.T. Chips Of Required Gradation And Asphlat Vg-30 Grade For Mixing @ 1.99 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting. (A) Lead Up To 25 Km,Providing And Laying Bituminous Grout 37.50 Mm Thick Compacted In Single Layer With Tack Coat Of Asphalt Vg-30 Grade At The Rate Of 2.5 Kg/10 Sqmt And Using B.T. Chips Of Required Gradation And Asphlat Vg-30 Grade For Mixing @ 1.99 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting. (B) Lead Up To 25 To 50 Km,Providing And Laying 37.5 Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Censor Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km,Providing And Laying 37.5 Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Censor Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 To 50 Km,Providing And Laying 37.5 Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km,Providing And Laying 37.5 Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 To 50 Km,Providing And Laying 37.5Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Censor Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete. (A) Lead Up To 25 Km,Providing And Laying 37.5Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Censor Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete. (B) Lead Up To 25 To 50 Km,Providing And Laying 37.5Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete.(A) Lead Up To 25 Km,Providing And Laying 37.5Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete.(B) Lead Up To 25 To 50 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 To 50 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 Km To 50 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene,Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene,Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 Km To 50 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 Km To 50 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (A) Lead Up To 25 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (B) Lead Up To 25 Km To 50 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipment, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (A) Lead Up To 25 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipment, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (B) Lead Up To 25 Km To 50 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (A) Lead Up To 25 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (B) Lead Up To 25 Km To 50 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (A) Lead Up To 25 Km,Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (B) Lead Up To 25 Km To 50 Km,Providing And Applying Asphalt Painting On B.T. Surface With Mechanical Sprayer Using Bitumen 60/70 (Vg-30) At The Rate Of 5.00 Kg/10 Sq.Mt. & Spreading Stone Dust On Painting Surface At The Rate Of 0.03 Cu.M./10 Sq.Mt. And Rolling With Smooth Wheeled And Pneumatic Roller And Brushing Etc. Complete. (A) Lead Up To 25 Km,Providing And Applying Asphalt Painting On B.T. Surface With Mechanical Sprayer Using Bitumen 60/70 (Vg-30) At The Rate Of 5.00 Kg/10 Sq.Mt. & Spreading Stone Dust On Painting Surface At The Rate Of 0.03 Cu.M./10 Sq.Mt. And Rolling With Smooth Wheeled And Pneumatic Roller And Brushing Etc. Complete. (B) Lead Up To 25 Km To 50 Km,Providing And Applying Asphalt Painting On B.T. Surface With Mechanical Sprayer Using Bitumen 60/70 (Vg-30) At The Rate Of 5.00 Kg/10 Sq.Mt. & Spreading Stone Dust On Painting Surface At The Rate Of 0.03 Cu.M./10 Sq.Mt. And Rolling With Smooth Wheeled And Pneumatic Roller And Brushing Etc. Complete. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km,Providing And Applying Asphalt Painting On B.T. Surface With Mechanical Sprayer Using Bitumen 60/70 (Vg-30) At The Rate Of 5.00 Kg/10 Sq.Mt. & Spreading Stone Dust On Painting Surface At The Rate Of 0.03 Cu.M./10 Sq.Mt. And Rolling With Smooth Wheeled And Pneumatic Roller And Brushing Etc. Complete. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 Km To 50 Km,Providing & Laying 75 Mm Thick Compacted Built Up Spray Grout Base Course In Two Layers With Bitumen Grade 80/100 At Rate Of 15 Kg. Per 10 Sqmt With 0.50 Cum Stone Aggregate For First Layer And 15 Kg Of Bitumen And 0.50 Cum Stone Aggregate Per 10 Sqmt. Of Road Surface For Second Layer And Using 0.13 Cum Of Key Aggregate Per 10 Sqmt Including Consolidation With Vibratory Roller And Tack Coat Using Asphalt 80/100 At Rate Of 2.50 Kg/10 Sqmt Etc. Complete Including The Cost Of Asphalt And Stone Aggregate. (A) Lead Up To 25 Km,Providing & Laying 75 Mm Thick Compacted Built Up Spray Grout Base Course In Two Layers With Bitumen Grade 80/100 At Rate Of 15 Kg. Per 10 Sqmt With 0.50 Cum Stone Aggregate For First Layer And 15 Kg Of Bitumen And 0.50 Cum Stone Aggregate Per 10 Sqmt. Of Road Surface For Second Layer And Using 0.13 Cum Of Key Aggregate Per 10 Sqmt Including Consolidation With Vibratory Roller And Tack Coat Using Asphalt 80/100 At Rate Of 2.50 Kg/10 Sqmt Etc. Complete Including The Cost Of Asphalt And Stone Aggregate. (B) Lead Up To 25 Km To 50 Km,Providing & Laying 37.5 Mm Thick Compacted Built Up Spray Grout Base Course In Single Layer With Bitumen Grade 80/100 At Rate Of 15 Kg. Per 10 Sqmt With 0.50 Cum Stone Aggregate Per 10 Sqmt. Of Road Surface And Using 0.13 Cum Of Key Aggregate Per 10 Sqmt Including Consolidation With Vibratory Roller And Tack Coat Using Asphalt 80/100 At Rate Of 2.50 Kg/10 Sqmt Etc. Complete Including The Cost Of Asphalt And Stone Aggregate Etc. Complete. (A) Lead Up To 25 Km,Providing & Laying 37.5 Mm Thick Compacted Built Up Spray Grout Base Course In Single Layer With Bitumen Grade 80/100 At Rate Of 15 Kg. Per 10 Sqmt With 0.50 Cum Stone Aggregate Per 10 Sqmt. Of Road Surface And Using 0.13 Cum Of Key Aggregate Per 10 Sqmt Including Consolidation With Vibratory Roller And Tack Coat Using Asphalt 80/100 At Rate Of 2.50 Kg/10 Sqmt Etc. Complete Including The Cost Of Asphalt And Stone Aggregate Etc. Complete. (B) Lead Up To 25 Km To 50 Km,Providing And Laying Wet Mix Macadam Base Course 300 Mm Thick In Two Layers As Per Morth Specification Using Machine Crushed B.T. Chips As Per Required Gradation, Mixing With Required Optimum Quantity Of Water, Conveying The Mix To Site Of Work, Spreading In To Grade And Camber With Paver/Mechanical Means And Consolidation Each Layer With Vibratory Roller To Aschieve The Desired Density Including Cost Of Material Labour Plant And Equipment Etc. Complete. (A) Lead Up To 25 Km,Providing And Laying Wet Mix Macadam Base Course 300 Mm Thick In Two Layers As Per Morth Specification Using Machine Crushed B.T. Chips As Per Required Gradation, Mixing With Required Optimum Quantity Of Water, Conveying The Mix To Site Of Work, Spreading In To Grade And Camber With Paver/Mechanical Means And Consolidation Each Layer With Vibratory Roller To Aschieve The Desired Density Including Cost Of Material Labour Plant And Equipment Etc. Complete. (B) Lead Up To 25 Km To 50 Km,Construction Of Granular Sub-Base 200 Mm Thick In Two Layers By Providing Coarse Graded Machine Crushed Material Satisfying Most Specification Of Grading I (B.T. Stone Aggregate 53Mm To 26.5 Mm 35% ,26.5Mm To 4.75 Mm - 45% And 2.36 Mm Below - 20 % ) Including Spreading In Uniform Layer With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc And Compacting With Vibratory Roller To Achieve The Desired Density Etc. Complete (A) Lead Up To 25 Km,Construction Of Granular Sub-Base 200 Mm Thick In Two Layers By Providing Coarse Graded Machine Crushed Material Satisfying Most Specification Of Grading I (B.T. Stone Aggregate 53Mm To 26.5 Mm 35% ,26.5Mm To 4.75 Mm - 45% And 2.36 Mm Below - 20 % ) Including Spreading In Uniform Layer With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc And Compacting With Vibratory Roller To Achieve The Desired Density Etc. Complete (B) Lead Up To 25 Km To 50 Km,Construction Of Granular Sub-Base 100 Mm Thick By Providing Machine Crushed B.T. Material Satisfying Mort&H Specification (Fifth Revision) Of Grading V Including Spreading In Uniform Layer With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc And Compacting With Vibratory Roller To Achieve The Desired Density Etc. Complete. (A) Lead Up To 25 Km,Construction Of Granular Sub-Base 100 Mm Thick By Providing Machine Crushed B.T. Material Satisfying Mort&H Specification (Fifth Revision) Of Grading V Including Spreading In Uniform Layer With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc And Compacting With Vibratory Roller To Achieve The Desired Density Etc. Complete. (B) Lead Up To 25 Km To 50 Km,Providing And Laying Quarry Spall Of Approved Quality Including Spreading, Watering Consolidation With Vibratory Roller Including Loading And Unloading Etc. Complete.