Tender For Fabrication And Erection Work-Dismantling, Fabrication And Erection Of Old / New Pipelines Up To Size 12. Dismantling, Fabrication And Erection Of Tees Up To 12. Dismantling, Fabrication And Erection Of Nipples Up To 12 Size. Doing . Dismantling, Fabrication And Erection Of Casings Up To 12 Size. Dismantling, Fabrication And Erection Of Bands Up To 12 Size. Dismantling, Fabrication And Erection Of Flanges Up To 12 Size. Dismantling, Fabrication And Erection Of Blinds Up To 12 Size. Dismantling, Fabrication And Erection Of Tee Above 12 Size. Dismantling, Fabrication And Erection Of Nipple Above 12 Size. Dismantling, Fabrication And Erection Of Flanges Above 12 Size. Dismantling, Fabrication And Erection Of Blinds Above 12 Size. Dismantling And Erection Of Valves Up To 10 Size. Dismantling, Fabrication And Erection Of Coils Of Ms Pipes Of Different Sizes. Dismantling, Fabrication And Erection Of Tanks Of Rectangular / Round / Square Etc. Shape. Dismantling Of Heavy Structures. Fabrication And Erection Of Heavy Structures. Dismantling Of Light Structures. Fabrication And Erection Of Light Structures. High Facing On The Teeth Of The Feed Roller Under The Mill. Fitting Of A New Scraper In Place Of The Worn Out / Cut Scraper Of The Under Feed Roller Of The Mill. Cutting Out The Neck Teeth Of The Under Feed Roller And Fabricating The Teeth According To The Drawing And Doing High Facing. The Grooved Juice Rings Of The Side Rollers Of The Mill Are Replaced With New 5 / 6 Mm Thick Plate As Per The Sample. Make Correctly Changing Both The Pipes Of Kush-Kush Conveyor And Fitting In The Attached Trough Give A Trial Yard Cutting And Putting The Knotted Runner Of Cane Carrier Rack Carrier Bagasse Elevator And Bagasse Carrier Into Scrap And Making New Runner From 50 / 65 Mm Flat, Fitting And Giving Trial. Cutting Off The Neck / Worn Side Plates Of The Can Carrier And Putting Them In The Scrap Yard And Replacing Them With New 6 / 8 Mm Thick M.S. Plates. Dump In Scrap Yard Cutting Out The Discharge Suit Attached Below The Fiberizer And Making It Out Of 12 Mm Plate And Giving A Satisfactory Trial. Replacement Of Corroded Bottom And Side Plates Of Rack Carrier With 08 Mm Plate. Cutting Out The Juice Tray On The Mill House And Making It Out Of 6 / 8 Mm Plate According To The Drawing / Sample And Giving Leak Proof Trial. Repairing Dsm Screen According To The Sample :- ( A ) Cutting Out The Weak Part Of The Receiving Box Above The Screen And Replacing It But According To The Sample From 8 / 10 Mm Plate, Make A New One With Nipple. ( B ) Cut Out The Juice Box Attached Below The Screen And Fix It According To The Sample. ( C ) Cut Out The Set Over Flow Box From The Screen And Fix The Weak Part According To The Sample. ( D ) Patching Or Replacement Of Side Plates As Required. Placement Cane Leveler / Chopper Throat Hood Cut And 10 / 12 Mm Notcher Cutting Out The Corroded Base Runner Box Of The Mill Rack Carrier And Replacing It With A New Plate / Angle By Making A New Box. The Square Bar Of The Seed And Trolley Attached To The Cane Unloader Was Damaged. Convert Function From Squarebar. In Condition, To New Cutting Out The Neck Plates Of Donnelly Suits In The Mill House And Re-Assembling Them With New / Old Plates. Making And Fitting And Giving It. Cleaning And Whitewashing Of The Condensate Receiving Tank Of The Boiler. Cut Out The Plate On The Top Of The Boiler And Replace It With A New Plate. Cutting And Patching Of Corroded Side And Bottom Plates Of Bagasse Elevator Rbc. Removal Of Side Plates Of Boiler No. 1, 2 And 3 By Cutting And Replacing Corroded Plates And According To The Sample From 5 / 3 Mm Plate, As Per Requirement, Make New Installation. Cutting Out The Burnt Ash Suit Of Boiler No.1 And 2 And Making New Suit From New Plate Installation And Trial. Dismantling, Fabrication And Erection Of Defective Ribs Of Juice Heater / Vapor Line Juice Dewater. Hydraulic Test By Placing Blind In The Pipe Above The Vapor Line Juice Deaerator And After Testing Remove The Blind And Connect The Pipe As Before. Dismantling Of Brass Tubes Of Evaporator Fitting Of Bass Tubes Of Evaporator Hydraulic Testing Of Evaporator Bodies ( Up To 100 Psi ) Making Platform From Old Scrap At Specified Places In The Factory. Dismantling Of Ss Pipeline Erection Of Ss Pipeline Dismantling Fabrication And Erection Of Ss Pipeline ( Cas ) Nipple Dismantling Fabrication And Erection Of Ss Pipe Line Ss Pipe Line Flange Dismantling, Fabrication And Erection Melter Of Juice / Syrup Sulfur Furnace Made Of 8 / 10 Mm M.S. Plate By Bending 2” Pipe / Super Dieter Tube And Fitting The Melter In Its Place After Removing It ( All Installation And Trial Including Connection. Cutting Out The Corroded Plate Of Sevwal ( Quad Bodies ) And Fitting It With New Plates And Giving Trial. Cutting Out The Old Neck Quad / Juice Dieter Condensate Bottle / Clear Juice / Sauram Bottle And Making A New One From 8 / 10 Mm Plate Of The Same Size And Making All Connections And Cutting Out The Throat Mud Trough Of Vacuum Filter And New From 8 / 10 Mm Plate Make And Install And Give Trial By Making All The Connections. Page Removing The Corroded Trough Agitator Of The Vacuum Filter And Making A New One From The Material ( Angle And Plate ) Of The Same Size Provided And Giving It A Trial. While Cleaning The Service Water Tank, Whitewash All Its Walls With Lime. Cleaning Of Grass And Thatch Up To A Distance Of About One Meter Around The Service Tank. Dismantling Of Ammonia Vials Of Juice Heaters And Fitting New Ones According To The Sample. Dismantling The Ammonia Reservoirs Of Evaporator Bodies And Making New Ones According To The Samples. Placement Dismantling Ammonia Coils Of Pans, Making And Installing New Ones According To The Samples. Dismantling, Fabrication And Erection Of A Complete System Of A Condenser Mounted On A Vacuum Filter. Dismantling, Fabrication And Erection Of The Coils Of The Four Compartments Of The Clarifier And Fixing All Its Nipples. Patching Of Weak Portions Of All Sum Boxes And All Telescopic Boxes Of The Clarifier. Dismantling And Erection Of Double Valve Valve Nipples Connected To Juice Dewater Enclosure Doing. ( Size 3 ) Fabrication And Dismantling Of Shell Of Cooling Scrubber System Fitted At Outlet Of Sulfur Furnace Erection With New Batten Plate And Flanged Nipple. Removal Of Weak Sublimation Systems / Equipments In Front Of Sulfur Furnaces And Fitting Of The Same Name From The Given Pine / Plate And Making All Related Connections Leak Proof. To Give A Trial Making The Telescopic Box Of The Clarifier With All Its Connections As Per The Sample Making Cones From Ms Plate As Per Requirement And Fitting As Per Instructions And Giving Trial. Mam Will Be Done On The Basis Of Big Dia. Cutting Out The Corroded Plates Of The Pans And Replacing Them With New Plates. Give A Trial Cutting Out The Weak Part Of The Molasses Tanks On The Pan Floor And Installing A New One And Giving It A Trial. Fitting The Vapor Pipe / Injection Pipe / Spray Pipe / Vapor Pipe / Exhaust Pipe Of Evaporator / Pans By Making Rings As Per Instructions With Angle / Flat Iron / M.S. Plate Etc. Dismantling The Top Cover Of All The Pans, Giving Support Etc. According To The Sample. Make A New One And Install It. Strengthening Of Pan Bodies From Inside / Outside With Ms Plate / Angle As Specified. Dismantling The Taper Cone Of The Pans And Fitting New Ones According To The Sample. While Working Stopping The Save All On It By Giving Support And Removing The Support After Work And Successfully By Dismantling The Old Damaged Main Dowel Fixed In The Save All Of The Pan / Pan Body / Evaporator Body Modifying It According To The Instructions, Make And Fit The Flange System. Cuts Out Weak Shell Of Quad / Pan Bodies As Directed And Replaces With Same Fabricated As Per Page And Fitted With 12 Nn Plate, Successfully Trialled. Dismantling Of Weak Feed Header Of 40 / 80 Ton Capacity Pan As Per Instructions Of Same Size Fitting Together With All Its Nipples And Valves While Fabricating. 8 / 10 Mm Thick M.S. Angle 10, 12 Nm Thick From Inside On Enclosure Shell Of Pans Strengthening In Two Lines As Per Instructions. Successfully Giving Trial By Dismantling, Fabrication And Erection Of Complete Chapar. Fixing And Trial-Fitting The Broken Arm Of The Crystallizer. Cutting And Fitting The Eccentric Bend Of Suction Pipe Of Injection And Spray Pumps Accordingly. Making Bed For Pump And Motor. Dismantling, Fabrication And Erection Of Gutters Of Mill House / Mascot / Magma / Molasses. Methodically Cleaning All The Junction Boxes Of The Pond, Opening The Pvc Pipe Nozzle Band. Doing . Repairing Of Nozzle Band And Cluster Or Replacement With New Items As Per Requirement. Give A Trial While Doing Water Flooring Of The Whole. Installation Of Given Butterfly Valve As Per Instructions. Size 18 Fixing Of All Defective Air Blower Plates Of Hopper No. 2 And 3 By Making Them As Per Sample. Injection / Spray Throat Suction Pipe With Suction Net ( With Eccentric Bend ) Make A New One Accordingly And Give It A Trial. The Work Of Changing The C.I. Cross. Work Of Changing Cit. 18 To A Throated Exhaust / Vapor Valve Enclosures Made According To The Sample Fitment Of Old Valves Flange, Spindle And Nut And Its Guide Support By Making New One. Giving Trial By Doing. Dismantling, Fabrication And Erection Of Throat Exhaust Pipes Of Fiberizer / Mill Turbines. Dismantling, Fabrication And Erection Of Top Researching Tank Of Water / Juice Drinking Scale And Giving Trial According To The Set Up. Dismantling, Fabrication And Erection Of Juice Sulphiter Recovery Tower Along With Its Top Mounted Chimney Pipe And Carrying Out Trials. Dismantling Of Sulfur Furnace No. 1, 2, 3, Fabrication And Erection Accordingly. Successfully Trial By Doing The Water Jacket Attached To It And All Its Connections Give . To Fix The Leaky Batten Ruler Of The Pans, Cutting It In Length Up To 4 / B As Per Instructions, Welding 12 Mm / 16 Mm Thick Plate Accordingly And Giving Trial Successfully. Dismantling, Fabrication And Erection Of Delivery Line Size 20” Of Quad Injection Pumps As Per The Instructions Of Chief Engineer, All Its Delivery Valves, All Nipples Of Valve Header Fitted In Deadder And Successfully Given Trial With Distance Piece Fitted On Top Of Pumps. Dismantling, Fabrication And Erection Of Delivery Line Size 24 / 28 Of Spray Pumps, Nipples, Distance Of All Its Butterfly Delivery Valve Headers As Per The Instructions Of Chief Engineers Station. Giving Trial Successfully While Doing Grinding Etc. Repair Of Damaged Stirrer Inside Juice Sulphiter With Old / New Angle. Page 3 Dia. To 12 Dia. By Cutting / Opening The Old Pipeline And After Cleaning And Installing It On The Site. Cutting And Removing The Corroded Body Plate On Both Sides Of The Fiberizer And Replacing It With New 10 / 12 Mm Thick Plate And Giving Trial Removing Corroded Side Plates Of Cane Chopper And Cane Leveler And New 10 12 Mm Made Of Plate And Fitted. Injection Common Header 24 / 28 Dia. Threshing And New Header Installation And Trial Made Of 8 / 10 Mm Thick Plate. Cutting Out The Catcher Of The Corroded Juice / Syrup Pump And Making A New One From 10 / 12 Mm Thick Plate Alignment Of Motor Pump On New Bed. Cutting Out The Corroded Cooling Pipe Of The Final Molasses Tank And Making A New One. Cutting Out The 75X75 Mm Angles Fitted On Both Sides Of The Cane Carrier, Which Have Been Damaged At Various Places, And Fixing Them With New Angles And Giving Them A Trial. Repairing Of Corroded Magma Mixers Ms Body As Per Sample. Replacement Of Corroded Skull Of Mud Mixer With Shaft. Cut Out The Worn External Catcher Of Pan / Quad And Again According To The Sample Fitting Made From New Plate / Pipe. - Cuts Out Shell Of Corroded Syrup Sulphiter And Rebuilds It From New Plate. Giving Leak Proof Trial By Putting It In Place. Corrosion Of Id Fan / Fd Fan Duct And Air Heater Duct Of Boiler No. 1 And 2 Cutting Out The Plates And Replacing Them With A New 6 / 8 Mm Thick Plate By Making A Duct And Giving A Trial. New / Old M.S. Plates ( 6 Preparation And Trial Of Ms Soil. Cut And Remove The Necked Body Shell Dia 2 Meters Length 2 Meters Of The Flash Tank Made Before The Door And In Its Place Flash Tank Made Of 800 Mm Thick New Plate And Put On Trial. Cutting Out The Corroded Bottom And Side Plate Of The Doors Foam Chamber And 6 Mm Replacement Of Corroded Part With New / Old Plate. Weak / Corroded Vapor Pipe / Exhaust Pipe Dia Of Pans / Quads From 24 Inch To 44 Inch By Bending From The Provided Ms Plate And Removing Old Corroded Pipes And Replacing Them And Giving Trial. Weak / Corroded Pans / Quads By Cutting Off The Bends Of Diameter From 24 Inches To 44 Inches And Making And Fixing The Bends By Making A Bend Size Pipe From The M.S. Plate Made Available. Boiler No. 03 Venturis S.S. Solder Which Got Damaged During The Season, Cutting It From The Top Of The Water Jacket And Re-Making It With New 0.8 / 0.8 Mm Thick M.S. Plate. 8 / 10 Mm Of M.S. Making Header As Per Sample From Plate And Fitting As Before And Take Trial. Removal And Installation Of Worm Deal Of Crystallizer. Page Spray Pond To Spray Pump Throated Header Sizes 24 To 28 Dia. Dismantling The Branch Lines Fitted With 6 / 8 Dia Ms Pipe Attached To The Header Of The Spray Pond, Replacing It With Branch Lines As Per The Sample And Spray Nozzles. And Nipple Flange Etc. As Before Bends Of Size 24 To 28 Dia From Pump To Header In Delivery Line Of Injection / Spray Pumps, Nipples, N. R. B. Dismantling The Nipple Valve Etc. And Fitting New Bend, Nipple, Clench Etc. As Before And Giving Trial. Dismantling Common Header Diameter 24 To 28 Of Injection Pumps, Making Common Header From 8 / 10 Mm Size M.S. Plate, Fitting The Header As Before And Fitting The Flanged Body Shell Of Trial Juice Sulphiter. Cutting Out And 10 / 12 Mm Thick M.S. Make A New One From The Plate And Fit It. Repairing And Repairing The Broken / Corroded Grate Plate And Structure Of Furnace No. 1 And 2 Of Boiler As Per The Instructions Of The Chief Engineer. Replacement And Trial Of Worn Reducer / Distance Piece For Juice / Syrup Pumps Up To Dia 10 Cutting Out The Corroded Tank Of Water Weighing Scale And 08 / 10 Mm Thick M.S. Fitting And Trial Made From Plate. Cutting Out The Trough Of Inter Carrier / Rack Carrier / Bagasse Elevator / Bagasse Carrier Of The Mill And 8 / 10 Mm. Make It By Folding It From The Plate And Give It A Trial. Door Compartment No. 4S Neck And Weak Base Plate By Cutting And According To The Instructions Of The Chief Engineer, M.S. Of 5 / 6 Size. The Work Of Changing From Plate. Dismantling The Exhaust Pipe Dia 24 / 28 Of Mill / Power Turbines And Re-Installing M.S. Plate 8 / 10 Mm Making Pipe By Bending It, Fitting It And Giving It A Trial. Replacement Of Damaged And Corroded Weighing Tank Of Juice Weighing And Its Wheel And Square Bar Removal Of Corroded Plate Of Various Equipments Installed In Page Mill And Giving Leak Proof Trial By Replacing With The Available Plate.