Tender For Competitive Ebidding For Job Work Of Miscellaneous Fabrication Season 2023-24-2 Dismantling Of C.I. Feeding Chute Of 20 Ton Boiler & Fitting Of Ci Mouth-Piece / Chute Complete Work 3 Dismantling Fabrication & Fitting Of Complete New Casing Of Id Fan With Cone Of Boiler. For 30 / 20 Ton Boiler 4 Dismantling Fabrication & Fitting Of Complete New Casing Of Id Fan With Cone Of Boiler. For 40 Ton Boiler 5 Fabrication & Erection Of Runner Supporting Box Below At Old Mbc / New Mbc / Cross Carrier / Bagasse Elevator. 6 Replacement Of Worn Out Bottom & Side Plate Of Bagasse Carrier / Bagasse / Elevator / Cross Carrier / Rbc / Irc By Ms / Ss Plates 7 Replacement Of Worn-Out Ducting Dampers Of I.D. / Fd Fan, And Other Ducting With Levers And Bushes 8 Outside Cleaning & Painting Of 30 / 20 Tph Boiler Chimney In Double Coat With High Tempeture Resistant Paint 9 Replacement Of Worn-Out Ducting Of Flue Gas 10 Fabrication & Fitting Of Bagasse / Ash Chute For New & Old Boilers 11 Reparing Of Wet Scrubber Shell Demister Of The 20, 30 & 40 Tons Boiler 12 Fabrication & Fitting Of Bagasse Sliding Gate For Bagasse Carriers 13 Fabrication & Erection Of The Bagacillo Impeller With Trial. 14 Dismantling Of Ms Plates Of Boiler Side Wall, Economizer And Boiler Roof For Replacement Of Boiler Tubes. Dismantled Old Plates To Be Fitted With Minor Repair / Patching After Replacement Of Boiler Tubes. 15 Replacement Of Runners Of New Mbc / Old Mbc / Bagasse Elevator / Cross Carrier & Rbc 16 Welding On Teeth Of New Mbc / Old Mbc / Bagasse Elevator / Cross Carrier & Rbc Chain Sprocket To Be Done& Teeth To Be Made As Per Profile 17 Repair Of Boiler Id Fan Casing & Successful Trial. 18 To Replace Worn Out Blower Casing Of Boiler D.M.Plant 19 To Replace Worn Out Bagasse Blower Casing At Bagasse Elevator 20 Complete Hardfacing Of Id Fan Impeller 21 Dis., Fab. & Erection Of New Boiler I.D. Expantion Joint 22 Dis. Cleaning , Repair & Fitting Of 20, 30 & 40 Ton Boilers Internal Fitting, 23 Replacement Of Worn Out Beam Size- 4” / 5” Of Boiler No.1 & 2 Farnace And Chamber. 24 Fabrication Of Bagasse Feeding Jantra Of Tractor 25 Fabrication & Fitting Of Bagasse Chute At Belt Conveyor 26 Reparing Of Grade Bars Of The 40 Tons Boilers 27 To Replace Worn Out Bagasse Blower Casing At Bagasse Elevator 28 Replacement Of Worn Out Teeth Of Bagasse Feeder Rotating Drum Of Boiler No-3, 4 & 5 With Satisfactory Trial 29 Dismantling, Fabrication & Erection Of Id. Fan Blade With Back Plate, Ribs And Suction Cone. ( A ) 20 Ton Boiler ( B ) 30 Ton Boiler 30 Dismantling, Fabrication & Erection Of Id. Fan Blade With Back Plate, Ribs And Suction Cone. ( C ) 40 Ton Boiler 31 Fabrication & Fitting Of Chain Guide Of New Mbc / Old Mbc / Bagasse Elevator / Cross Carrier & Rbc 32 Fitting Of New 8Mm Thick Ms Plate Ring On Base Plate Of Boiler Id Fan Impeller For Strengthening 33 Dismantling, Fabrication And Fitting Ofworn Out Portionof Old Feed Tank Ofboiler No.1, 2& 3 34 Replacement Of Worn Out Ms Beam And Channel Arrangement Size- 4” / 5” Of Boiler No.1 & 2Arch. 35 To Replace Worn Out Blower Casing Of Boiler D.M.Plant 36 Dismantling, Fabrication And Fitting Of Safty Valve Worn Out Discharge Assembly With Proper Support 37 Schedule Work 38 Dismantling Of M.S. Pipe Line Including Bend / Flange Etc Up To 12” Dia 39 Fabrication & Erection Of M.S. Pipe Line Up To 12” Dia 40 Fabrication & Erection Of Bend Up To 12” Dia ( Ms ) 41 Fabrication & Erection Of Nipple Up To 12” Dia ( Ms ) 42 Fabrication & Erection Of Cross Up To 12” Dia ( Ms ) 43 Fabrication & Erection Of Tee Up To 12” Dia ( Ms ) 44 Fabrication & Erection Of Flange Up To 12” Dia ( Ms ) 45 Fabrication & Erection Of Blind Up To 12” Dia ( Ms ) 46 Fabrication & Erection Of Reducer Up To 12” Dia ( Ms ) 47 Fabrication & Erection Of Elbow Up To 12” Dia ( Ms ) 48 Fabrication & Erection Of Bend Up To 12” Dia ( Ss ) 49 Fabrication & Erection Of Nipple Up To 12” Dia ( Ss ) 50 Fabrication & Erection Of Cross Up To 12” Dia ( Ss ) 51 Fabrication & Erection Of Tee Up To 12” Dia ( Ss ) 52 Fabrication & Erection Of Flange Up To 12” Dia ( Ss ) 53 Fabrication & Erection Of Blind Up To 12” Dia ( Ss ) 54 Fabrication & Erection Of Reducer Up To 12” Dia ( Ss ) 55 Fabrication & Erection Of Elbow Up To 12” Dia ( Ss ) 56 Dismantling Of Valve Up To 12” Dia 57 Fitting Of Valve Up To 12” Dia 58 Dismantling Of Valve Above 12” Dia 59 Fitting Of Valve Above12” Dia 60 Dismantling Fabrication & Fitting Of Man Hole 61 Fabrication & Erection Of Bend Above 12” Dia 62 Fabrication & Erection Of Nipple Above 12” Dia 63 Fabrication & Erection Of Tee Above 12” Dia 64 Fabrication & Erection Of Flange Above 12” Dia 65 Fabrication & Erection Of Blind Above 12” Dia 66 Fabrication & Erection Of Reducer Above 12” Dia 67 Fabrication & Erection Of Elbow Above 12” Dia 68 Dismantling Of M.S. Pipeabove 12 “ Dia 69 Fabrication Of M.S. Pipe Above 12” Dia 70 Erection Of M.S. Pipe Above 12” Dia Including Bend Flange & Nipple Etc. 71 Dismantling Of Old Worn-Out Platform 72 Fabrication & Erection Of Platform By Using Old Plate 73 Fabrication & Erection Of Cat Ladder 74 Fabrication & Erection Stair Case 75 Fabrication & Erection Of Railing From Old Material 76 Fabrication & Erection Of Railing From Old Material 77 Fabrication & Erection Of Unvested Type Ring Over Evaporator Vapour Pipe / Pan Vapour Pipe 78 Dismantling Ofs.S. Pipe Linewith Bend & Flange 79 Fitting Of S.S. Pipe Line With Bend & Flange. 80 Dismantling Of Ms Heavy Structure / Tank 81 Dismantling Of Ms Light Structure 82 Fabrication & Erection Light Structure 83 Fabrication & Erection Heavy Structure 84 Fabrication Of Pump Bed With Pump, Reduction Gear & Motor Alignment Up To 30 H.P. 85 Fabrication Of Pump Bed With Pump, Reduction Gear Box & Motor Above 30 Hp 86 Dismantling, Fitting And Expanding Of Ss / Brass Tubes With Satisfactory Hydraulic Testing For Quad / J. Heater / Vapour Cells 87 Dismantling, Fitting And Expanding Of Ss / Brass Tubes With Satisfactory Hydraulic Testing For Pan Tube 88 Ss Plate Lining In Different Size Of Equipments. 89 Dismantling, Cleaning & Fitting Of Ms Pipe Line With Bend, Flange , Nipple Etc. 90 Fitting Of Ms Pipe Line With Bend, Flange , Nipple Etc 91 Fabrication & Erection Ofcomplete Square / Rectangular Tank / Round With Conical Bottom 92 Fabrication & Fitting Ofms Coil ( Coils Are To Be Duly Bend And Not Offset Pipe Welding .Offset Welds Shall Not Be Treated As Coils But As Pipes ) 93 Fabrication & Fitting Ofss Coil 94 Welding Work For Various Equipments In B / H 95 Dismantling , Fabrication & Fitting Ofnew Coneand Umbrella Anywhere In The Factory. Cone Up To 01 Mtr. Dia 96 Dismantling, Fabrication & Fitting Of New Coneand Umbrella Any Where In The Factory.Cone Above 01 Mtr. Dia Upto 2.5Mtr Dia. 97 Dismantling , Fabrication & Fitting Of New Coneand Umbrella Any Where In The Factory, Cone Above 2.5 Mtr. Dia 98 Fabrication And Patchwotk Of Equipmentsusing Old / Newms Plateby 6 / 8 Mm Thick Plate Overround Vessels / Any Vessels 99 Mill House 100 Cutting Of Cheveran Grooveson Mill Rollers 101 Cutting Of Pine Apple Grooves On Mill Rollers. 102 Replacement Of Runners Of Cane Carrier , S.Rc & Irc Mbc And Rbcand Cane Un Loader Power Supply Angle 103 Welding Of Worn-Out Holes Of Block Type Chain Link, Rack Holding Square And Duere Drilling Of Holes 104 Replacement Of Worn-Out Bootof Src& Irc 105 Fabrication Of New Juice Rings 106 Dismantling, Grinding & Erection Of The Square Bar Of Cane Unloader 107 Welding On Wearout Mill And Grpf Crown Pinion Teeth As Per Profile. 108 Fabrication And Replacement Of New Mill Juice / Waterimbibitionsbox / Distributer. 109 Fabrication. & Erection. Of Mill Rollerfeed & Discharge Bearing Cover From 10 Mm / 8Mm Plate. 110 Fabrication & Erection Of Runner Supporting Box Below Runner At Irc, Src & Cane Carrier, Mbc And Rbcand Bagasse Elevator. 111 Replacement Of Worn Out Deflector Plate And Top Plate Of Cane Chopper / Cane Leveler / Fibrizer By M.S. Plate / Ss Lining Plates Along With Strengthening. 112 Fabrication & Erection Of Cane Carrier Chain Side Angle. 113 Fabrication & Erection Of Return Cane Carrier Chain Supporting Runner / Chain Guide. 114 Fabrication & Erection Of Worn Out Ms Plate Of Truck Tripler, Src, Irc & Cane Carrier Side Plate. 115 Sprocket Teeth Repairing And Strengthening With Extra Support Of Irc / Src / Elevator / Mbc / Rbc 116 Repair & Hard Facing Of Auxiliary Cane Carrier Kicker / Pusher 117 Welding & Hard Facing On Wear Out Under Feed Roller Teeth, Side & Shell Of Roller. 118 Replacement Of Worn-Out Juice Screen Plate Of Screw Bagasseconveyorat Mill 119 Repair And Hard Facing On Cane Leveller / Chopper Hubs 120 Lever Bracket Of Underfeed Roller Scraper To Be Changed & To Be Fitted On As Per Direction. 121 Partition Plate Of Half Anvil To Be Changed Completely With 25 Mm Plate & Hard Facing. 122 Welding And Forging In Holes Of Cane Carrier Chain Links. 123 Fabrication Of 10” Size Non Return Valve From M.S. Plate With Fitting & Leak Proof Trial. 124 Fabrication & Erection Of Rotary Filter Ms Conical Juice Tank. 125 Extension Of Ss Juice Distributer Pipe Of Rotary Filter 126 Repair Of Cane Carrier Slates Such As Worn-Out Side Wear Plates Holes& Other To Be Done 127 Fabrication & Hard Facing Of Under Feed Roller Scrapper As Per Instructions To Be Done. 128 Welding On Wear Out Teeth Of Cane Carrier, S.R.C. & I.R.C. Sprockets To Bedone & Teeth To Be Made As Per Profile 129 Ms Ring To Be Fitted On Worn-Out Both Side Of Bagasse Pusher At Fibrizer& Hard Facing To Be Done On Square Bars Fitted 130 Welding & Grinding Of Grpf Scrapper To Be Done To Make Them As Per Profile & Hard Facing To Be Done 131 Repair & Hard Facing Of Cane Unloadedgrab Finger 132 Underfeed Roller Pinion Hard Facing / Welding 133 Repairing Of Ms Guard / Cover Mill Rollers Crown Pinion 134 Dismantling & Fabrication Of Bagacillo Screen With Modification As Per Instruction. 135 Dismantling Of Sprokets Of Src / Irc / Elevator Drive / Trail Nd Shaft And Fitting The Same With Successful Trail 136 Rotary Screen Wornout Support Box Replacement & Accordingly Strenthening Its Platform With Successful Trail 137 Ss Plates Patching On The Truff Of Irc / Src And Mills Head Stock 138 Pan House 139 Repairing Of Down-Take Of Pan For 40 / 50 Ton Pan 140 Repairing Of Down-Take Of Pan For 60 / 80 Ton Pan 141 Replacement Of Worn Out / Broken Angle Arms Of Crystallizer 142 Dismantling Of Gutter Of Molasses Magma & Massecuite. 143 Fabrication & Fitting Of Gutter Of Molasses, Magma & Massecuite. 144 Repairing Of Hinge Type Cover Of Gutter 145 Replacement Of Worn-Out Condensate Box Of Pans, Quad & Juice Heaters 146 Dismantling Fabrication & Fitting Of New Umbrella In Pans With Supports & J Pipes 40 / 50 Ton Pan 147 Dismantling Fabrication & Fitting Of New Umbrella In Pans With Supports & J Pipes 60 / 80 Ton Pan 148 Repairing Of Umbrella Of Pans With Supports & J Pipes 40 / 50 Ton Pan 149 Repairing Of Umbrella Of Pans With Supports & J Pipes 60 / 80 Ton Pan 150 Replacement Of Worn Out Distributor By New For 40 / 50 Ton Pan 151 Replacement Of Worn Out Distributor By New For 60 / 80 Ton Pan 152 Repair Of Wornout / Broken Of Air Cooled, Vacuum & Seed Crystallizer 153 Dismantling Of 40 Ton Pan Complete Body Shell With Save All And Umbrella Feed Header, Distributer, Etc & Fabrication Of Shell With 12 / 10Mm Ms Plate With Satisfactory Trial 154 Replacement Of Complete Worn-Out Top Conical Portion Of Pan By New Withsupports Of Associated Machinery Parts Proper Strengthening-40 / 50 Ton Pan 155 Replacement Of Complete Worn-Out Top Conical Portion Of Pan By New Withsupports Of Associated Machinery Parts Proper Strengthening-60 / 80 Ton Pan 156 Strengthening Of 40 / 60 Ton Pan Body &Taper Portion With Channel Etc. 157 Replacement Of Worn Out Bushes Of Air Cooled Crystallizer Of Both Side & Completion With Proper Alignment & Successful Trial ( Bushes Will Be Provided By The Factory ) - Both Side ( Rate Ratio Drive : Non Drive End Shall Be 65:35 ) 158 Dismantling Fabrication & Erection Of Box Type Feed Header For Each Pan With Related All Connections. 159 Dismantling Fabrication & Erection Of Worn Out Portion Of Pan Body With 12Mm Plate With Water & Vacuum Trial 160 Replacement Of Wearout / Wornout Ms Side & Bottom Plate Of Water Over Head Tank / Syrup Storage Tanks At Pan Station 161 Repairing Of Wearout / Wornout Down Take Of Pans 40 / 50 Ton 162 Repairing Of Wearout / Wornout Down Take Of Pans 60 / 80 Ton 163 Repairing Of Wearout / Wornout Save-All Of Pans 40 / 50 Ton 164 Dismantling , Fabrication And Erection Of Pan Save All With Proper Trial 40 / 50 Ton 165 Dismantling , Fabrication And Erection Of 40 Ton Pan No 5 Calendria With Proper Trial 166 Dismantling , Fabrication And Erectionof 80 Ton Pan No 10 Taper Portion And Save All 167 Dismantlingand Erectionof 80 Ton Pan No 1 Shell And Save All 168 Dismantling , Fabrication And Erection Of Pan Save All With Proper Trial 60 / 80 Ton 169 Repairing Of Wearout / Wornout Save-All Of Pans 60 / 80 Ton 170 Evaporator & Clarification House 171 Dismantling, Repair & Refitting, Cleaning Work Of Catcher Of New Semikestner ( Uttam Set ) 172 Dismantling, Fabrication & Erection Work Of Evaporator Body / Semikestner / Vapour Cell Newsave All 173 Major Repair Of Save All Of The Evaporator Body / Semikestner / Vapour Cell 174 Dismantling, Fabrication & Erection Ofnew Juice Heater Header Withribs& Fitting Of Cover With Satisfactory Trial 175 Dismantling, Fabrication & Erection Work Of The Sulphur Furnace Melter / Melt Receiver Along With Steam Coil And Their Hydraulic Testing. 176 Dismantling, Fabrication & Erection Of Sulphur Furnace Cooler With Its Pipe Cooling Coil Complete Connection Of Water And Associated Pipe Lines With Satisfactory Trial 177 Repairing Of Sulphur Furnace Cooler With Its Pipe Cooling Coil And Complete Connection Of Water Cooling Pipe And Gas Line. 178 Dismantling, Fabrication & Erection Of Juice Receiving Bottle Fitted At Vacuum Filter Station 179 Dismantling, Fabrication & Erection Of Condenser At Vacuum Filter. 180 Dismantling, Fabrication & Erection Of Mud Juice Receiving Tank Complete With Connection & Associated Pipe Lines. 181 Dismantling, Fabrication & Erection Of Mud Tray Of Vacuum 8’ X16’ Vacuum Filter 182 Dismantling, Fabrication & Erection Of Mud Tray Of Vacuum 10’ X20’ Vacuum Filter 183 Dismantling, Fabrication & Erection Of Vacuum Filter Agitator. 184 Dismantling, Fabrication & Erection Of The Juice Box Of Juice Heater With Satisfactory Trial. 185 Dismantling Fabrication & Fitting Of Bagacillo Pipe. 186 Dismantling , Fabrication & Erection Of Clear Juice Liquidation Box With Trial 187 Dismantling, Fabrication & Erection Of Clarifier Mud Boot. 188 Dismantling, Fabrication & Erection Ofjuice Catcher For Raw / Vacuum / Sugar Melter / Sulphitedjuice Pumpswith Suction / Delivery Connection 189 Repairing Of Juice Heater Condensate Bottle / Evaporator / Syrup Receiving Bottle With Leak Proof Testing Partition Plate With All Connection. 190 Repairingofso2 Furnace Sublimation Pipe With Its Leaking Tower Etc. With Testing 191 Dismantling, Fabrication & Erection Of Vacuum Filter Mud Mixer Body & Fitting Of Screw Conveyor With Proper Alignment & Satisfactory Trial. 192 Fabrication & Erection Of Screw Conveyor From 6Mm Thick Plate With Satisfactory Trial. 193 Dismantling, Fabrication & Fitting Of New Down Take Of Quad / Old Or New Semikestner, Etc. 194 Dismantling, Fabrication And Erection Of New Recovery Tower Of Juice Sulphiter / Syrup Sulphiter. 195 Replacement Of Muddy Juice Tank Fitted At Vacuum Filter With New Plates & With All Connections. 196 Repairing Of Umbrella Of Quad & Pan 197 Dismantling, Fabrication & Erection Of Worn Out Umbrella Of Quad & Pan 198 Dismantling, Fabrication & Erection Ofsaveall Ofquad Old Bodies 199 Dismantling, Fabrication & Erection Ofsaveall Ofquad Uttam Set. 200 Replacement Of Worn-Outtop Conical Portion Ofquad & Vapour Shell With Save All Proper Strengthening With Associated Machinery 201 Dismantling, Repair, & Erection Of Worn Out Juice Heater Partition Plate With Ribs. 202 Dismantling Of Worn Out Arms And Shell ( Outside & Inside ) Of Juice Sulphiter Drum, Fabrication & Erection With Satisfactory Trial. 203 Dismantlingof Worn Out Central Drum & Bed Of Juice Sulphiter, Fabrication & Erection With Satisfactory Trial. 204 To Replace Worn Out Clear Juice Box / Mud Discharge Box With Valve Of New Door Followed By Satisfactory Trial 205 Dismantling Ofwear Outjuice Heater Cover, Fitting Of New 12 Mm Thick Ms Plate By Welding & Bolting Including Repair Of Lever & Erection Of Cover Followed By Satisfactory Water Trial. 206 To Replace Worn Out Mud Scrapper Plate With Support & Vacuum Filter Fitting To Be Done. 207 To Replace Worn Out Juice Baffle Plate Of Door Compartment 208 Fabrication & Erection Of New Sulphur Furnace After Dismantling Of Old Furnace With Successful Water / Air Trial. 209 Major Repair Of Lime Slaker With Proper Alignment & Trial 210 Dismantling & Erectionofquad 440 Sq. Mtr. Calendria Include All Connection With Successful Trail 211 Dismantling, Fabrication & Erection Of After Burner Vessel. For So2 Furnace. 212 To Replace Worn Out Sulphur Furnace Header Of Size 8” / 10” 213 Dismantling, Fabrication & Erection Of Ammonia Pipe Inside New Evaporator Body 214 Replacement Of Worn-Out Stirrer Arms Of Clarifier Completed With All Support And Squeezers Etc. 215 Dismantling And Repairing Of 2300 Sq Mtrs Sk Catcher Of Uttam Quad Set With Satisfactory Trial 216 Dismantling & Erection Work Of Uttan Quad Set 2300 Sq. Mtr Calendria Include All Connection With Successful Trial 217 Replacement Of Partition Plate Of Old Door Compartment With 5 / 6 Mm Ms Plate 218 Replacement Of Cooling Coil Pipe Of C- Vertical Crystalizer 930 Mtr With New M.S. Pipesize 3 With Proper Hydraulic Testing And Trial 219 Dismantling, Fabrication & Erection Of 440 Sq Mtr Quad Body Shell With Save All, Top Taper Cone, Manhole And Its All Connection With Satisfactory Trial 220 Dismantling & Erectionofuttam Quad 1700 Sq. Mtr. Calendria Shell All Connection With Successful Trail 221 Erection Work Of Transfer Pump Bottle Size 3Mtrx1.5Mtr Connection. 222 Centrifugal House 223 To Replace Worn-Out Molasses Jacket Of B & C Continuous Centrifugal Machine With Proper Trial. 224 To Replace Worn-Out “A” Centrifugal Machine Molasses Chute / Housing Chute Followed By Satisfactory Trial. 225 To Replace Worn Out Half Portion Of Horizontal Sugar Melter In Centrifugal House With Steam & Juice Connection Followed By Satisfactory Trial. 226 Dismantling Of Worn Out B & C Centrifugal M / C, Magma Mixture Shaft, Fabrication Of Complete New Shaft With 12Mm Plate, Fitting Of Arms Etc. With Successful Trial. 227 Replacement Of Damaged Portion Of Hopper 228 Broken Shaft Of Cryst. To Be Made Correct Or Replaced By New One Andproper Alignment To Be Done. 229 Replacement Ofwornoutbushes & Arms Of Sugar Melter With Satisfactoty Trial 230 Replacement Of Cooling Pipe Of C & B Mono Cryst. 231 Replacement Of Wornout Suction Pipe Of Mf- 50X50 / 40X40 Injection & Spraypump 232 C- Pug Mill, Magma Mixer, Broken Shaft To Be Taken Out Andto Be Repaired / To Be Changed New Along With Bush, Support & Arm To Be Fitted A Satisfactory Trial. 233 Repairingof B & C Massecuitemono Cryst. Leakage Coil With Hydraulic Testing & And Successdul Trial. 234 B & C Magma Mixer, Pugmill Worn-Out Broken Shell To Be Replaced, Work To Br Completedwith Satisfactory Trial. 235 Dis. Of Worn-Outb & C Magma Mixer Shaft, Fab.& Erection Of The Shaft With 12 Mm M.S. Plate, Fittingand Successful Trial. 236 Replacement Ofworn- Out Molasses Ring Of 1350 Kt C / F Machine. 237 Dis., Fab. & Erection Of New. Fan Ofe.T.P. Aerator 238 Dismantling, Fabrication & Erection Of Worn Out Wk1350 C / F Machine Cover. 239 Replacement Ofdamaged Hopper Air Try With New Plate 240 Replacement Ofworn Out Magma / Pug Mill Worn Out Padestal Arms. 241 Replacement Ofweak / Wearout Ms Jali Of Hopper &Fitting With Frame 242 Dismantling Fabrication And Erection Of Air Diffuser For Etp From Old Boiler Tubes 243 Replacement Of Worn-Out Bed Of Sugar Exiter With Proper Strengthening 244 Replacement Of Damaged / Worn-Out Arms Of Mono Crystillizer