M/O Completed Scheme Of Na-Ii Under Sz. M/O Aff. M. P. Green Area And Area Attached To Kichener Lake At Dhaula Kuan. M/O Aff. District Park At Nanakpura. M/O Park Plantation At Satyaniketan. M/O Aff. Mp Green Area Near Malikpur Sultangarhi Tomb Ss Of Good Earth, Red Bajri, Jamuna Sand, Digging Of Holes Etc At Site , Digging Holes In Ordinary Soil And Refilling The Same With The Excavated Earth Mixed With Manure Or Sludge In The Ratio Of 2:1 By Volume (2 Parts Of Stacked Volume Of Earth After Reduction By 20% : 1 Part Of Stacked Volume Of Manure After Reduction By 8%) Flooding With Water, Dressing Including Removal Of Rubbish And Surplus Earth, If Any, With All Leads And Lifts (Cost Of Manure, Sludge Or Extra Good Earth If Needed To Be Paid For Separately)Holes 60Cm Dia And 60 Cm Deep , Digging Holes In Ordinary Soil And Refilling The Same With The Excavated Earth Mixed With Manure Or Sludge In The Ratio Of 2:1 By Volume (2 Parts Of Stacked Volume Of Earth After Reduction By 20% : 1 Part Of Stacked Volume Of Manure After Reduction By 8%) Flooding With Water, Dressing Including Removal Of Rubbish And Surplus Earth, If Any, With All Leads And Lifts (Cost Of Manure, Sludge Or Extra Good Earth If Needed To Be Paid For Separately)Holes 45Cm Dia And 45 Cm Deep , Supplying And Stacking Of Good Earth At Site Including Royalty And Carriage With All Lead And Lifts (Good Earth Measured In Stacks Will Be Reduced By 20% For Payment). , Supplying & Stacking Of Jamuna Sand At Site I/C Royalty And Carriage, Loading, Un- Loading With All Lead And Lifts. , Supplying & Stacking Of Red Bajri At Site By Mechanical Transport I/C Royalty And Carriage Loading Unloading With All Lead And Lifts. , Providing And Stacking Of Neem Oil Cake At Site In Packing Of 40 Kg Old Gunny Bags/Plastic Bags. , Ploughing The Existing Ground To A Depth Of 15 Cm To 25 Cm And Watering The Same. , Fine Dressing Of The Trenched Ground. , Supplying & Stacking Of Selection No.1 Grass At Site Fresh And Free From Weeds Having Proper Roots In Green Including Loading, Unloading Carriage And Aa Taxes Paid Etc. And As Per Direction Of Officer-In-Charge. , Providing Of Agro Shade Net Green Color (75:25):- 15 Roll (900 M2) Size (3M X 50M= 150 M2) Per Roll , Supply Of Best Quality Shadow Net Green Color (50 M × 3 M) 75:25 , Providing Of Hydraulic Excavator (3D) With Driver And Fuel , Providing And Fixing Of Tuflex Garden Fencing Hexagonal Net/Or Equivalent Of Green Colour Having Contents (Weight Grams/Sqm. 510( +/- 8 % )) In Width Of 60 Cm. With Bamboo Of 90 Cm.Length. The Bamboo Should Be Painted With Green Colour Paint Of Approved Brand And Manufacture (Two Or More Coats) And Fixed 30 Cm. Below Ground Level And60 Cm. Above Ground Level At A Distance Of 1.50 Mtrs. The Net And Bamboo Should Be Binded With 2 Mm. G.I. Wire At Three Places Properly As Per Direction Of Engineer-In-Charge. , Supply Of Bamboo 25 Mm Dia 2.5 Metre Long Score , Supply Of Polythene Bags Size 12.5 Cm Dia X 17.5 Cm Height , Supply Of Polythene Bags Size 15 Cm Dia X 20 Cm Height , Supply Of Polythene Bags Size 6 X 8 (Gauge 200 - 250) Both Layerat Site. (Only For Seed Bed/ Nursery) , Supply Of Polythene Bags Size 8 X 12 (Gauge 200 - 250) Both Layerat Site. (Only For Seed Bed/ Nursery) , Supply Of Moss Grass. , Supply Of R.H. Pipe 25 Mm Double Braided Isi Markon Every Mtr. As Per 444. 1987 Type 2 Having Working Pressure 10Kg/Cm2 At Site , Supply Of Petrol Driven Light Weight ,Handy Chain Saw Of Stihl Germany Make Model No. Ms 381 With Engine Displacement Of 72.0Cc With Rated Output Of 3.9Kw/5.3Hp, Dry Weight 6.6Kg,Chain Oil Tank Capacity 0.20Ltr, Weight To Power Ratio Of 1.7 Kg/Kw, Oilomatic Chain Of 3/8 Rapid Micro & Guide Bar Of 50Cm Along With Std Tools & Accessories. , Renovating Lawns Including Weeding, Cheeling The Grass, Forking The Ground, Top Dressing With Sludge Or Manure, Mixing The Same With Forked Soil, Watering And Maintaining The Lawn For 30 Days Or More Till The Grass Forms A Thick Lawn Free From Weeds And Fit For Mowing And Disposal Of Rubbish As Directed, Including Supplying Good Earth If Needed (The Cost Of Sludge, Manure And The Good Earth Shall Be Paid For Separately)