}

Tender For Fabrication, Erection And Dismantling From Reputed Contractors, hasanpur-Uttar Pradesh

Kisan Sahkari Chini Mills Limited has published Tender For Fabrication, Erection And Dismantling From Reputed Contractors. Submission Date for this Tender is 27-06-2023. Clothing Accessories Tenders in hasanpur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

38297050
Tender For Fabrication, Erection And Dismantling From Reputed Contractors
Open Tender
Indian
Uttar Pradesh
Hasanpur
27-06-2023

Tender Details

Fabrication, Erection And Dismantling From Reputed Contractors , Febrication , General Work , Dismantling Ofm.S. Pipe 2 Cm To 35 Cm Size. , Erectionofm.S. Pipe 2 Cm To 35 Cm Size. , Dismantling ,Fabrication And Erection Ofpipe Fitting Size 2Cm To 35 Cm , Bend , Flange , Nipple , Cross/Tee , Valve , Reducer , Dismantling Of M.S. Pipe Above To 400 Mm Size& Shifting It To Scrap Yard. , Fabrication And Erection Of M.S. Pipe Above To 400 Mm Size By 6/8/10 Mm Plate. , Dismantling ,Fabrication And Erection fpipe Fittingabove400 Mm Size. , Bend , Reducer , Nipple , Cross/Tee , Valve , Dismantling Of Old Bed And Fabrication, Erection, Alignment & Trial Of Newbed Of Motor, Pump Or R/G Box. , 10 Hp To 20 Hp , 25 Hp To 60 Hp , 75 Hp To 125 Hp , 150 Hp To 250 Hp , Patching Work In Different Type Ofrectanglur,Square & Ciruler Old Equipments By New/Old Plate As Available. , Dismantling Of Old And Wornoutrectangular/Circular Tank Andshifting Them To Scrap Yard. , Fabricationand Erection Ofnew Rectangular/Circular Tank By Provided New/Old Plate. , Flat Bottom , Conical Bottom , Repairing And Replacing Of Wornout Portion Ofrectangular/Circular Tank By Provided New/Old Plate. , Dismantlingof Light Structure , Fabrication And Erection Of Light Structure. , Dismantling Of Heavy Structure. , Fabrication And Erection Of Heavy Structure. , Replacement Of Oldworn-Out Platform By New Or Old Plate. , Fabrication And Fitting Ofshed By Old G.I. Sheet For Db, Motor Etc In Different Places. , Repairing Of Trusses Of Mill House, Boiling House Etc By Welding Or Fitting Missing Or Worn-Out Nut And Bolts. , Straightening Bent M.S. Plates For Reuse. , Dismantling Fabrication And Erection Of Header With Flange And Nipple Etc. , Size 2.5 Cm To 12.5 Cm , Size 15 Cm To 30 Cm , Replacement Of Cone Of Different Equipments By Old/Newm.S.Plate. , Up To 1 Meter Dia , Above 1 Meter Dia , Repairing Of M.S. Gutter At Different Places. , Fabrication And Erection Of Newgutter In Place Of Worn-Out Gutters By Old /New Plates. , Fabrication And Erection Of Newgutter By Old / New M.S. Plate. , Repairing Of Worn-Out Column And Beam In Mill , Dismantling Of Worn-Out Coils And Fabrication Erection Of New Coil By New Pipe. , Fabrication Of Electric Pole Up To 27 Long With Base By 4,6,8 Old Or New Pipes. Cross Armto Be Fitted. , Fabrication And Fittingof Sight Glass , Man Holewith Blind In Various Equipmentsand Steam Lines. , Fabrication And Erection Of Step Type Stairs With Railing Etc Fordifferent Places. , Mill House , Dismantling And Erection Of Worn-Out Runner Of Cane Carrier/Src/Rake Carrier/Bagasse Elevator /Rbc. , Repairing Of Old Rakes Of S.R.C./Inter Rake Carrier. , Fabrication Of New Rakes For Src/Inter Rake Carrier By M.S. Plate , Replacement Of Worn Out Side Plate Of Rake Carrier/Bagasse Elevator/Rbc/Up To 300 Mm Height By New / Old Plate. , Replacement Of Worn Out Side Plate Of Cane Carrier By New /Old Plate And Strengthening Of Its Lower Side Support. , Dismantling And Erection Of Side & Bottom Plate Of Src/Rake Carrier/Bagasse Elevator & Rbc Above To 300 Mm Size. Flat And Angle To Be Fitted Out Side Of Bottom Plate For Strengthening. , Fabrication & Erection Of Guide In Cane Carrier/Src/Bagasse Elevator And Rbc By Bending Angle And Plate. , Dismantling Of Worn-Out Box Of Src/Rake Carrier And Erection Of New Box In Place Of It. , 150 X 150 Mm , 200 X 200 Mm , Replacement Of Weaksideand Top Plate From Cane Chopper To Fibrizer By Old / New Plate. , Fabrication And Erection Of Juice Distribution Chute. , Dismantling Of Worn Out Rail Of Cane Unloader And Erection Of New Rail At Its Place. , Dismantling Of Worn-Out Squire Bar Of Unloader And Erecting Of New Squire Bar At Its Place. , Replacemen Of Worn-Out Angle/Channel/Beam Of Cane Carrier/Rake Carrier/Bagasse Elevator And Rbc. , Angle , Chanel , Beam , Fabrication And Erection Of Trpf Rollers Top & Bottom Cover By New/Old M.S. Plate , Line Level Of Inter Rake Carrier Andworn Out Side Plates Of Tail And Driving Endshaftsguides To Be Replace By M.S. Plate. Erection Afterline Alignment With Satisfactory Trial. , Fabrication And Erection Of Mill Pressure Chute By New M.S. Plate. Lining Of S.S. Plate To Befitted Onit Andstrengthening Of Top And Bottom Plate To Be Done. Fittingaccordingly As Per Old Chute To Be Done. , Replacement Of Old S.S. Lining Of Pressure Chute . New S.S. Lining To Be Fitted Accordingly As Per Old Chute. Assembly Andstrengthening To Be Done. , Bagacilo Screens Of Bagasse Elevator To Be Taken Out And Their Fitting To Proper Place After Repairing/Setting Them Straight/Right. , Checking Of Mill Juice Tray, Replacement Of Worn Out Portion, Arresting Of Leakages Withwelding Of S.S./M.S. Electrodes With Satisfactory Trial. , Dismantling Of Worn-Out Deflector Plate Of Fibrizer With Beam. Fabrication And Erection Of New Deflector Plate Accordingly As Perold Plate. , Cane Carriers All Three Runners Beams Line Alignment And Levelto Beset Rightand Satisfactory Trial Work To Be Done. , Line Alignment Work Of Head And Tail End Shaft Of Secondary Rake Carrier/ Ircto Be Done. Its Worn Out Runner And Angle To Be Replaced And Satisfactory Trial To Be Done. , Repairing Of Weak And Wornout Plate Of Donally Chute By New / Old Plate And Satisfactory Trial To Be Given. , Boiler House , Fabricationof New Rakes For Rbc And Bagasse Elevator. Approximate Weight Of 01 Rake Is 12 Kg. , Repairingof Old Rakes Of Rbc And Bagasse Elevator. , Replacement Of Worn Out Portion Of Boiler Flue Gas/Air Heaterducting By Old /New Plate. , Patching Work Over Worn Out Portion Of Boiler Flue Gas Ducting By Old /New Plate. , After Dismantling Of Old Flue Gas Ducting Damper, New Damper To Be Fabricated And Erected. , After Dismantling Of Old F.D. Fan Air Ducting Damper, New Damper To Be Fabricated And Erected. , Repairing Of Bagasse Feeding Sliding Gate Of Boilers . , Erection Of Id Fan Casing After Replacement Or Patching Of Worn Out Portion Of It By Old/ New Plate. , Fabrication And Erection Of Worn Out Bagasse Feeding Chute Of Boilers By Old/ New Plates. , Repairing/Replacing Of Old Worn Out Fins Of 20 Ton Boilers Economizer Tube. , Dismantling ,Modification And Erection Of Boiler Flue Gas Ducting As Per Instruction. , After Dismantling Worn Out Wear Plate Of Id Fan Impeller Vain, New Plate To Be Fitted And Hard Faced As Per Instruction. , Fabrication And Erection Of New Suction Cone Of Boiler Id Fan By Old/New Plate. , Worn-Out Portion Of Boiler Ash Discharge Chute To Be Taken Out. Fabrication And Erection Of New Ash Discharge Chute Of Boilers. , Replacement Of Old Tubes Of Air Heater By New Tubes. , Fabrication Of Old Tubes Of Boilers According To The Size Of Air Heater Tubesand Their Erection To Air Heater. , Repairing Of Wet Scrubbers Ventury, Its Internal Coil And Deflector Plates. , Boiling House , Old Brass/Ss Tubesof Quad/ Juice Heater/Pans To Be Taken Out And Depositing Them To Store.New Tubes To Be Fitted, Expendedand To Be Trialed At80 Lbs Pressure. , Juice Heater/ Semikestner , Vapor Shell/ Quad /Pan , Weak Save All Of Quad /Pans To Be Repaired By New/Old Plate Andto Fit/Erect Them. , Fabrication And Erection Work Ofsave-All By 8 Mm M.S. Plate In Place Of Quad/Pans Worn-Out Save-All According To Instructions. Satisfactory Trial Is Needed. , Fabrication And Erection Of Steiner With Nipple In Place Of Raw Juice/Sulphited Juice/Syrup/Melterpumps Worn Out/Old Strainers. , Weak Catchers Worn Out Portion Of Quad /Pan To Be Taken Out. Repairing To Be Done By Provided Plates.Fins To Be Prepared And Fitted To Them. , Top And Bottom Portion Worn-Out Partition Plate Of Juice Heater/ Vapor Line Juiceheater Dismantling And New Partition Plate Fabrication Erection Work To Be Done . , Dismantling, Fabrication And Erection Of Worn Out Condenser Of Vacuum Filter Along With All Connections And Satisfactory Trial. , Dismantling Fabrication Erection Of Condensate Bottle Of Quad / Semekestner / Vapor Cell / Juice Heater Along With All Connections. Dismantled Material To Be Shifted To Scrap Yard. , Dismantling Fabrication And Erection Work Of Steiner For Spray/ Injection Pump Suction Pipe. , Dismantling Of Worn-Out Portion Of Vacuum Filter Trough . Plate To Be Bend According To Size And To Be Fitted In Trough. , Dismantling Fabrication And Erection Of Channel And Beam Of Condenser. , Quad /Pan Entrainment Catcher Insideworn-Out Channel, Angle Dismantling And New Channel, Angle Erection Work. , 6 Size Worn Out Coils Of Clarifier Dismantling, New Fabricatingerection With Nipple And Trial To Be Done. , Dismantling Of Worn-Out Down Take Of Semikestner, Vapor Cell, Quad, Panand Fabricationerection Of New Down Take By 6/8 Mm Plate With Trial. , Crystallizers Broken/Tilted Arms To Be Taken Out. After Repairing Them Or Making New To Be Fitted To Proper Place And Trial To Be Given. , 40/60 Ton Pan Discharge Valves Worn Out Body / Chute Dismantling Work And Fabrication Erection Work Of New Body/Chute. , Crystallizers Worn-Out Gland, Bush, Replacing Work, Shaft Repairing Work , Worm Wheel Opening And Fitting Work And Satisfactory Trial To Be Given. , Spray System Pipe Line Blindsto Be Opened, Cleaned And To Be Fitted After Cleaning With Satisfactory Trial. , Spray System Worn Out Branch Pipe Line Dismantling And New Branch Line Erection Work And Satisfactory Trial To Be Done. , Quad/Pan Worn-Out Umbrella Dismantling And New Umbrella Fabrication Erection Work To Be Done. , Vapor Shell/ Semikestner/Quad Pans Worn Out Ammonia Coil Dismantling And New Ammonia Coil Fabrication Erction Work With Trial. , Sugar Hopper Weak And Worn Out Driving Unit / Trough To Be Dismantled. Fabrication And Erection Of New Drive Unit/Trough With Angle . Trial To Be Done. , Fabrication And Erection Of New Chute Of S.D. Machine Pug Mill Gate. , Fabrication Of New Bucket As Per Sample For Dry Seed Elevator/Sugar Elevator. , Broken Shaft Of Pug Mill Drive To Be Linked To Proper Place. New Flange Type Coupling To Be Made Fit To Fitin It . Rib To Be Provided According To Instruction. , New Coil For D Super Heater Is To Be Fabricated Andto Be Fitted As Directed With Nozzles And Satisfactory Trial Is To Be Given. , Fabrication, Erection With Shaftand Satisfactory Trialof Screw Conveyor For Vacuum Filter Mud Mixture. , Dismantling, Fabrication And Erection Of Vacuum Filter Mud Mixture With Satisfactory Trial. , Vacuum Crystallizer Weak And Worn-Out Shell Dismantling Work And Fabricationerection Of New Shell In Its Place. , Clarifier Top And Flocculaty Chamber Worn Out Plate Dismantling Work And Fabrication Erection By New Plate. Leak Proof Trial To Be Done. , Vacuum Filter Weak And Worn Out Filtrate Bottle To Be Dismantled And Shiftto Scrap Yard.Fabrication And Erection Of New Bottle Along With All Connections. Leak Proof Trial To Be Done. , Sulphur Furnace Cooler Worn Out Coil Pipe To Be Taken Out , New Pipe To Be Fitted And Leak Proof Trial To Be Done. , Replacement Of Partition Plate Of Quad/ Juice Heater Condensate Bottle. , Junction Box Of Spray Pipe Line To Be Opened, Taken Out, Their Pipes And Nozzles To Be Cleaned And O Fit Them Again After Necessary Repairing . , Weak And Worn Outportion Of Spray /Injection Pump Suction Pipe To Be Taken Out And To Repair By New /Old Plates. , Weak And Worn-Out Duck Foot Bend Of Pan / Quad Tail Pipe To Be Dismantled. Fabrication And Erection Of New Duck Foot Bend In Its Place. , Agitator Of Vacuum Filter To Be Repaired. , For Hydraulic Testing Of Vapor Line Juice Heater M.S. Pipe Blinds Be Provided Inside Suction And Delivery Vapor Pipe Of V.L.J.H.And Blinds Be Taken Out After Hydraulic Testing. , Exhaust Vapor Valve To Be Opened Its Weak Portion To Be Patched By 8/10 Mm Thick Plate.Assembledafter Patching And Leak Proof Trial To Be Done. , Juice/Syrup Sulphiter Recovery Tower Worn Out Shell Size 1 Meter Dia X 3 Meter Height To Be Dismantled And To Shift Scrap Yard . Fabrication And Erection Ofabove Shell By Old/ New Plate According To Drawing. Leak Proof Trial To Be Done. , Dismantling Of Worn Out Melter Of Sulphur Furnace, Shifting It To Scrap Yard. Fabrication And Erection Of New Melterby 8/10 Mm Plate. Coils To Be Made And To Erectit By New Pipe. Trial To Be Done. , Dismantling Of Worn Out Spruzer Of Juiced Sulphiter. Fabrication And Erection Of Spruzer By New Pipe. Leak Proof Trial To Be Done. , Dismantling Of Worn Out Mud Distribution Box Of Clarifier. Fabrication And Erection Of New Mud Distribution Box By New Plate. Trial To Be Done. , Worn-Out Agitator Of Vacuum Filter Is To Be Taken Out And New Is To Be Fabricated Andfitted. Satisfactory Trial Is To Be Given. , Partition Plate Of Compartmentof Clarifier To Be Replaced , 60/40 Ton Pans Discharge Valve Bearing Housings Plate To Be Replaced By New Plate And Trial To Be Done. , Dismantling Of Worn Out Shell And Bottom Of Juice Sulphiter. Fabrication And Erection Of New Shell And Bottom By 8/10 Mm Thick Plate Withjuice, Gas And Lime Line Connection .Partition Plate And Stirrer To Be Fitted To Proper Place In Side Sulphiter. Satisfactory Trial To Be Done. , Dismantling Ofworn Out Coolers Of Sulphur Furnace. Fabrication And Erection Of Coolers By 8 Mm M.S. Plate. Cooling Pipe, Gas Pipe Connection To Be Done. Satisfactory Trial To Be Done. And Dismantled Material To Be Shifted In Scrap Yard. , Weak Lower Portion Of Shell Of Sulphur Furnace Coolers To Be Dismantled. Fabrication Erection To Be Done. Worn-Out Cooler Pipes To Be Replaced. , Dismantling Fabrication Erection Of Weak Roof Of Clarifier By 8 Mm Thick Plate. Weak Tray Of Dorr To Be Taken Out And 6Mm Thick Plate To Be Patched In Its Place. , Dismantling Ofworn Out Catcher Bottle Of Vacuum Filter. Fabrication And Erection Of New Catcher Bottle In Its Place. All Connections And Trials To Be Done. , Quad Body Weak Bottom To Be Dismantled. Fabrication And Erection To Be Done By Old Or New Plate. All Connections To Be Done . Trial To Be Done. , Spray/ Injection Pumps Delivery Headers Weak Portion To Be Dismantled. New To Be Fabricated Bynew /Old Plates And Erected With Satisfactory Trial. , Dismantling Of 3 Sizeworn Out Steam Coil Of B Heavy Molasses Conditioner And Fabrication Erection Of New Coil With Its Trial. , Dismantling Of Old Worn Out Air Plate Of Hopper . Fabrication And Erection Of New Plate By 3Mmnew M.S. Plate In Its Place. , All 04 No Fins Of Pan No. 7Mechanical Circulator To Be Taken Out. New Fins With Housing To Be Erected In Its Place. Trial To Be Done. , Worn Out Circular Bottom Plate Of Crystallizerto Be Dismantled. New To Be Fabricated By New M.S. Plate And Erected In Its Plate. Leek Proof Trial To Be Done. , Syrup Sulphiter Weak And Worn Out Portion Of Shell To Be Dismantled And Shift It To Scrap Yard. Fabrication And Erection Of Above Shell By Provided New Plate Of 8 Mm Thick. Satisfactory Trial To Be Given. , Dismantling Of Weak Old Hot Water Overhead Tank And Condensate Water Receiving Tank Of Pan And Shift Them To Scrap Yard. Fabrication And Erection Of New Tanks By8/10 Mm Thick Plate With All Necessary Connections. , Dismantling Of Worn-Out Baffle Plate Of Juice Sulphiter And Shifting It To Scrap Yard. Fabrication And Erection Of New Baffle Plate In Its Place. , Dismantling Of Worn-Out Dorr Clear Juice Distribution Box And Shifting It To Scrap Yard. Fabrication And Erection Of Newclear Juicedistribution Box In Its Place With All Connections. , Dismantling Of Old Trough Of Hoppersand Shifting Them To Scrap Yard. Fabrication And Erection Of New Trough With Support Angle And Fitting Of Wooden Strip. Satisfactory Trial To Be Given. , Dismantling Of Old Juice Sulphiter/ Clear Juice/Syrup Receiving Bottle And Shifting Them To Scrap Yard. Fabrication And Erection Of New Bottle With All Connections. Satisfactory Trial To Be Given. , Fabrication And Erection Of B And C C/F M/Ctop Cover By Provided New /Old M.S. Plate With Satisfactory Trial. , Fabrication And Erection Of B And C C/F M/C Molasses Separator By Provided New /Old M.S. Plate And Satisfactory Trial To Be Given. , Fitting Of Diffusers In Aeration Tank With All Connections And Satisfactory Trial To Be Given. , Fabrication Of M.S. Perforated Box Of Size 1½?X 1 X 2? And Fitting It In Mgf/Acf , Repairing Of Pugmill With Drive Arms By Providing Plates And Angle. Satisfactory Trial To Be Given. , Dismantling Of Old Trough Of Hopperand Shifting Them To Scrap Yard. Fabrication And Erection Of New Trough With Dubbing Plate,And Wooden Connecting Rod Housingin Those Places. Satisfactory Trial To Be Given. , Dismantling Of Weak And Wornout Catcher Of Quad/Pan And Shifting It To Scrap Yard. Fabrication And Eretion Of Catcher Of Quad /Pan By New /Old Plate Of 8/10 Mm Size. Leak Proof And Satisfactory Trial To Be Given , Dismantling Of Weak And Wornout Sulphur Furnace Body Shell With Water Jacket And Shifting It To Scrap Yard. Fabrication And Erection Of Sulphur Furnace Body Shell With Water Jacket By10/12 Mm M.S. Plate. Leakproof And Satisfacrory Trial To Be Given. , Dismantling Of Wornout Flash Tank Of Clarifier/ Dorr And Shifting It To Scrap Yard. Fabrication And Erection Of Flash Tank Of Clarifier/Door By 6/8 Mm Plate Alognwith Its Pipe Line Connections Andleakproof And Satisfactory Trial To Be Given. , Repairing Of Molasses Conditioners Weak And Wornout Stirrer Arms And Satisfactory Trial To Be Given. , Repairing Of Weak And Wornout Cyclone Of Vacuum Filter By 3Mm/5 Mm Plate Andsatisfactory Trial To Be Given. , Dismantling Of Weak Shell Of 40/60 Ton Capacity Pan And Shifting It Scrapp Yard. Fabrication And Erection Of New Shell By 10/ 12 Mm Size M.S. Plate. Leakproof And Satisfactory Vacuum Trial To Be Given. , Dismantling Of Weak Shell Cone Of 40/60 Ton Capacity Pan And Shifting It Scrapp Yard. Fabrication And Erection Of Cone Shell By 10/12 Mm Size M.S. Plate. Leakproof And Satisfactory Vacuum Trial To Be Given. , Dismantling Of Weak Saveall Top /Cone Of40/60 Ton Capacity Pan And Shifting It Scrapp Yard. Fabrication And Erection Of Saveall Top/Coneby 8/10 Mm Size M.S. Plate. Leakproof And Satisfactory Vacuum Trial To Be Given. , Dismantling Of Weak Portion Of Bottom Saucer Of Quad/Panand Shifting It Scrapp Yard. Fabrication And Erection Of Bottom Saucer Of Quad/Pan By Provided M.S. Plate. Leakproof And Satisfactory Vacuum Trial To Be Given. , Dismantling Of Weak And Wornout Sulphur Furnace Melter Coiland Shifting It Scrapp Yard. Fabrication And Erection Of Sulphur Furnace Melter Coil . Leakproof And Satisfactorytrial To Be Given. , Repairing Of Weak Out Blaldes Of Hopper Blower Fan And Satisfacrory Trial To Be Given. , Dismantling Of Weak And Wornout Shell/Cone Of Quad/ Semikesner /Vapour Body And Shifting It Scrap Yard. Fabrication And Erection Of Shell/Cone Of Quad/Semikesner/ Vapour Body. Leak Prof And Satisfactory Trail To Be Given , M.S. Pipe Blinds Be Provided Inside Suction And Delivery Vapor Pipe Of V.L.J.H.And Blinds Be Taken Out After Hydraulic Testing. , Erection Of New Vapour Line Juice Heater With Leak Proof Connection Of All Its Steam And Juice Lines, Construction Of Necessary Structure For Juice Heater, Hydraulic Testing After Fittingtubes In Juice Heater And A Complete Satisfactory Trial Is To Be Given, , Dismantling ,Fabrication And Erectio Of Bottom Cone Of 60/40 Ton Pan With All Accessaries, Discharge Valve And Connections.Complete Leak Proofandvacuum Trial Is To Be Given.

Key Value

Document Fees
INR 590 /-
EMD
INR 25000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail