Execution Of Contract For Extension Of Supply Works And Other Works Inug Cable Urban Division Tirunelveli. 1 Normal Ground- Excavation Of Pole Pits ( 1.25M * 0.5M*1.5M ) For 7.32M, 7.5M, 8M, 8.23M Poles 2 Normal Ground- Erection Of 7.32M, 7.5M, 8M, 8.23M Poles 3 Rocky Ground- Excavation Of Pole Pits ( 1.25M * 0.5M*1.5M ) For 7.32M, 7.5M, 8M, 8.23M Poles 4 Rocky Ground- Erection Of 7.32M, 7.5M, 8M, 8.23M Poles 5 Normal Ground- Excavation Of Pole Pits ( 1.25M * 0.6M*1.83M ) For 9M & 9.14M Poles 6 Normal Ground- Erection Of 9M & 9.14M Poles 7 Rocky Ground- Excavation Of Pole Pits ( 1.25M * 0.6M*1.83M ) For 9M & 9.14M Poles 8 Rocky Ground- Erection Of 9M & 9.14M Poles 9 Normal Ground- Excavation Of Pole Pits ( 1.25M * 0.6M*2.19M ) For Above 9.14M Poles & 36 Length Rs Joists 10 Normal Ground- Erection Ofabove 9.14M Poles & 36 Length Rs Joists 11 Rocky Ground- Excavation Of Pole Pits ( 1.25M * 0.6M*2.19M ) For Above 9.14M Poles & 36 Length Rs Joists 12 Rocky Ground- Erection Ofabove 9.14M Poles & 36 Length Rs Joists 13 Transporting Of Poles From Road Side To Pole Pit - 7.32M, 7.5M, 8M, 8.23M Rcc Pole 14 Transporting Of Poles From Road Side To Pole Pit - 9M, 9.14M Rcc / Psc Pole 15 Transporting Of Poles From Road Side To Pole Pit - Rsj 36 Pole 16 Transporting Of Poles From Road Side To Pole Pit - Rsj 42 And Above 17 Loading And Unloading Of Poles - 7.32M, 7.5M, 8M, 8.23M Rcc Pole 18 Loading And Unloading Of Poles - 9M, 9.14M Rcc / Psc Pole 19 Loading And Unloading Of Poles - Rs Joists, Tubular & Rail Pole ( Above 9.14M ) 20 Concreting Of Poles As Per Board Standards ( 2*2*5 ) . The Material Such As Cement, Sand, Jelly, Etc., Have To Be Supplied By The Contractor ( Cement Concrete Mix 1:4:8 Using 40Mm Hard Broken Stone Including Cost Of Labour Charges.For Placing Transporting Of Sant, Jally, From Box And Water Curing For 14 Days Etc, . ) 21 Coping Of Pole ( 0.6M*0.6M*0.35M ) 22 Concreting Of Stay ( O.3M * 0.3M * 1.5M ) Including Materials Except Cement 23 Coil Earthing Per Pole & Pole Earthing 24 Normal Ground- Excavation Of Stay Pit ( 1.00M * 0.5M*1.5M ) With Transporting Of Materials To Site ( For Stay Set ) 25 Normal Ground- Erection Of Stay Set 26 Rocky Ground- Excavation Of Stay Pit ( 1.00M * 0.5M*1.5M ) With Transporting Of Materials To Site ( For Stay Set ) 27 Rocky Ground- Erection Of Stay Set 28 Loading Charges Of Cement 29 Unloading Charges Of Cement 30 Stacking Charges 31 Fixing Of V & Channel Cross Arm 5.5 Including Transporting Of Materials From Road Side To Site 32 Fixing Of V & Channel Cross Arm 4.5 Including Transporting Of Materials From Road Side To Site 33 Fixing Of V & Channel Cross Arm 3.5 Including Transporting Of Materials From Road Side To Site 34 Fixing Of Lt 3Phase Cross Arm Including Transporting Of Materials From Road Side To Site 35 Fixing Of Lt 1Phase Cross Arm Including Transporting Of Materials From Road Side To Site 36 Fixing Of Ht Lt Ti Fitting Including Transporting Of Materials From Road Side To Site 37 Erection Of Ht Side Arm With Stud Including Transporting Of Materials From Road Side To Site 38 Erection Of Lt Side Arm With Stud Including Transporting Of Materials From Road Side To Site 39 Fixing Of Insulator ( Per Location ) Including Transporting Of Materials From Road Side To Site 40 Ht Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 2.59 Acsr ( 1Span / Wire ) 41 Ht Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 3.35 Acsr ( 1Span / Wire ) 42 Ht Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 4.09 Acsr ( 1Span / Wire ) 43 Ht Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For Dog Conductor ( 1Span / Wire ) 44 For Ht Line Clear Works For For 7 / 2.59 Acsr ( 1Span / Wire ) 45 For Ht Line Clear Works For For 7 / 3.35 Acsr ( 1Span / Wire ) 46 For Ht Line Clear Works For For 7 / 4.09 Acsr ( 1Span / Wire ) 47 For Ht Line Clear Works For Fordog Conductor ( 1Span / Wire ) 48 Lt Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site- For 7 / 2.59 Acsr 49 Lt Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site- For 7 / 3.35 Acsr 50 Lt Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site- For 7 / 4.09 Acsr 51 For Lt Line Clear Works For For 7 / 2.59 Acsr ( 1Span / Wire ) 52 For Lt Line Clear Works For For 7 / 3.35 Acsr ( 1Span / Wire ) 53 For Lt Line Clear Works For For 7 / 4.09 Acsr ( 1Span / Wire ) 54 Guarding Per Span Length- Spilt Neutral Guarding 55 Guarding Per Span Length- Flat Guarding ( 2 Wires ) 56 Guarding Per Span Length- Flat Guarding ( 4 Wires ) 57 Guarding Per Span Length- Flat Guarding ( 6 Wires ) 58 Guarding Per Span Length- Cradle Guarding ( Fixing Of X Arm Lacing ) 59 Guarding Per Span Length- Fixing Of One Earthing Device With Stud 60 Erection Of Transformer / Dismantling Upto 200Kva 61 Erection Of Transformer / Dismantling Upto 250Kva 62 Erection Of Transformer / Dismantling Upto 500Kva 63 Erection Of Centre Support ( Including Concrete ) 64 Erection Of Feeder Cable With Open Type Fuse Unit Per Feeder And For Each Addl Feeder 65 Erection Of Feeder Cable With Open Type Fuse Unit - For Each Addl Feeder 66 Erection Of Feeder Cable -Bus Bar Arrangement With Open Type 67 Loading & Unloading Of Distribution Transformer Below 250Kva 68 Loading & Unloading Of Distribution Transformer 250Kva 69 Loading & Unloading Of Distribution Transformer 500Kva 70 Plinth Work For 500Kva Dt With Construction Material 71 Tube Light Erection-1*40W Tube Light Complete Set ( Including Transport ) 72 Tube Light Erection-For Sv Lamp And Mercury Lamp Complete Set ( Including Transport ) 73 Tube Light Erection-For Cfl Lamp Complete Set ( Including Transport ) 74 Manufacturing Of Clamps 50*8 Mm 75 Manufacturing Of Clamps 65*10 Mm 76 Alteration Of Clamps 77 Corroded Pole Welding With 4 Pieces Of Charges ( Incl.Concreting Of Cement ) Note:Pieces Will Be Supplied By Board 78 Welding Joint For New Rsj Pole At Workshop Per Foot Run Of Welding 79 Street Light Switching Pont Arrangement 80 Drilling Less Than 23Mm Holes Per Hole / Slatted Hole 81 Cutting Of Channel 82 Cutting Of Flat 83 Cutting Of Angle 84 Rsj Pole Cutting 85 Tubular Pole Cutting 86 Rail Pole Cutting 87 Fabrication Of Lightning Arrestor Frame 88 Lt-Changing Of Pin Point To Cut Point 89 Ht-Changing Of Pin Point To Cut Point 90 Erection Of Service Connection Materials-1Ph Service 91 Erection Of Service Connection Materials-3Ph Service 92 Dismantling Of Deteriorated Poles With Concrete In Damaged Condition Including Grill Separation Etc., 93 Dismantling Of Poles Without Concrete In Damaged Condition Including Grill Separation Etc., 94 Providing Jumpering At Cut Point 95 Complete Replacement Of Worn Out Earth Wire Per Structure 96 Labour For Manufacturing Of Open Type Fuse Unit ( Materials Supplied By Board ) 97 Manufacturing Of Hg Fuse Stool Incl. Materials 98 Tree Clearence In Ht Or Lt Location- For Ordy. Tree Clearence And Throng Bushes & Trees 400 / Head / Day 99 Tree Clearence In Ht Or Lt Location- For Coconut Trees And Palmrah Trees 500 / Head / Day 100 Painting-Double Pole Transformer Structure Materials ( Double Coat ) 101 Painting-Pole ( Colour Washing With Distember ) 2 Nos 102 Painting-For Transformer Only ( Double Coat With Paint ) 103 Numbering Of Poles Without Paint ( Labour ) 104 Numbering Of Poles With Paint ( Labour ) 105 Numbering Of Distribution Trnasformer ( Painting And Writing Of Name Board Size-1-1 / 4*1 Incl Cost Of Paint And Ms Sheet 106 Writing In Seating Channel ( Paint To Be Supplied By Contractor ) 107 Painting Of Rcc Strcucture Poles All Metal Parts, Snowcem & Aluminium Paint To Be Supplied By Contractor 108 Painting Of Rcc Strcucture Poles All Metal Parts, Snowcem & Aluminium Paint To Be Supplied By Board 109 Painting Of Rsj Structure Poles & Metal Parts-Aluminium Paint To Be Supplied By Contrcator 110 Painting Of Rsj Structure Poles & Metal Parts-Aluminium Paint To Be Supplied By Board 111 Set Right Of Leaning Ht Pole / Lt Pole Including X Arms, Ti Fittings 112 Transformer Structure Erection-Excavation Of Structure Pole Pits ( Nos ) 113 Transformer Structure Erection-Erection Of Structure Poles ( Nos ) 114 Transformer Structure Erection-Excavation Of Stay Pits ( 4Nos ) 115 Transformer Structure Erection-Erection Of Stay Set ( 4Nos ) 116 Transformer Structure Erection-Concreting Of Structure Poles Incl.Materials 117 Transformer Structure Erection-Concreting Of Stays ( 4Nos ) Incl.Materials 118 Transformer Structure Erection-Base Concreting 119 Erection Of Structure Materials-Top Channel 120 Erection Of Structure Materials-Transformer Seating Channel And Belting Angle 121 Erection Of Structure Materials-Ab Switch ( Complete ) 122 Erection Of Structure Materials-Hg Fuse ( Complete ) 123 Erection Of Structure Materials-Jumpering 124 Erection Of Structure Materials-Ht Las 125 Erection Of Structure Materials-Lt Las 126 Earthing System-Excavation Of 3 Nos. Earth Pits 127 Earthing System-Excavation Of Earth Wire Trenches And Paving Of Earth Wire, Erection Of 3 Nos. Earth Pipe And Giving Earth Connection, Earthing Of All Metal Parts, Las Etc., Including Central Connection 128 Earthing System-Mason Works For Earth Pits And Structure Pole Coping ( Cementsupplied By Contractor ) 129 Earthing System-Painting Of Transformer Structure 2 Coats ( Labour Only ) 130 Earthing System-Painting With Distember Paint On Poles 131 Earthing System-Spreading Yard Jelly And Cut Stone And Bricks Including Material 132 Earthing System-Writing Of Name Board And Target Board 133 Erection Of Tapping Structure-Excavation Of Structure Pole Pit. 134 Erection Of Tapping Structure-Erection Of Structure Pole. 135 Erection Of Tapping Structure-Excavation Of Stay Pit. 136 Erection Of Tapping Structure-Erection Of Stay Set. 137 Erection Of Tapping Structure-Concreting Of Pole. 138 Erection Of Tapping Structure-Concreting Of Stay. 139 Erection Of Tapping Structure-Base Concreting. 140 Erection Of Structure Materials-Top Channel 141 Erection Of Structure Materials-Ab Switch ( Complete ) 142 Erection Of Structure Materials-Assemble, Operating Pipe Fixing Etc., Fixing Of Cross Bracing 143 Earthing System-Excavation Of 1 No. Earth Pits Excavation Of Earth Wire Trench And Paving Of Earth Wire, Erection Of 1 No. Earth Pipe And Giving Earth Connection, Earthing Of All Metal Parts, For Tapping Structure. 144 Earthing System-Mason Works For Earth Pit ( Including Material ) 145 Colour Coating On Poles With Iron Materials Including Paint And Distember 146 Transporting Of 42 Twin Rsj Pole From Roadside Pole Pit 147 Fabrication Of 42 Twin Rsj Pole, Materials Supplied By Board. 148 Excavation & Erection Of Twin 422 Fabricated Rsj Pole 149 Concreting Of 42 Twin Rsj Pole 150 Singple Pole Structure Erection- 9.0 Mtr Rcc Pole ( Square ) -Loading & Unloading Of Poles 151 Singple Pole Structure Erection- 9.0 Mtr Rcc Pole ( Square ) -Excavation Of Pole Pit & Pole Erection 152 Singple Pole Structure Erection- 9.0 Mtr Rcc Pole ( Square ) -Transporting Road Side To Pole Pit 153 Singple Pole Structure Erection-Excavation And Erection Of Stay Set Complete With Stay Clamps ( With 16Mm Stay Rod With Base Plate ) 154 Fixing Of Single Pole Structure Materials & Structure Clamps ( Tapping Channel - 1 No., Tr.Bed, Erection Ab Switch - 1 Set, Erection Hg Fuse Set - 1 Set ) 155 Erection Of 16 / 25 Kva, 11Kv / 433 Volts 3 Phase 156 Earthing For 9 Mtr Rcc Structure Square Pole ( 3 Pits ) 157 Concreting Including Materials For 9 Mtr Rcc Square Pole-Base Concreting 1:4:8 500*650*150Mm, Pole Concreting1:2:4 500*500*1700& Coping 1:2:4 ( As Per Actuals ) 158 Concreting Including Materials For Stay Sets. ( Cement, Jelly And Sand ) 159 Fixing Of 11 Kv Lighting Arrester, Metal Oxide, 9 Kv, 5 Ka ( Ht & Lt ) 160 Erection Of Lt Wiring Kit ( Double Open Type Circuit ) 161 Fixing Of Caution / Danger Board As Per Drawing 162 Painting Of Single Pole Str Including Iron Materials Double Coat With Painting Materials 163 Fixing Of Guarding X Arm 164 Fixing Of Tapping Channel X Arm 165 Fixing Of Lt Shackle 166 Fixing Of 11 Kv Strain Disc 167 Maintenance Of Ab Switch-Replacement Of Male And Female One Number Contact And Ptinsulator 168 Maintenance Of Ab Switch-Cleaning Of Contacts, Lubrication And Checking Of Operating Pipe Movments 169 Maintenance Of Distribution Transformer-Cleaning Of Ht / Lt Bushings, Oil Level Checking , Silical Gel Replacement, Terminal Tightness Checking, Cleaning Of Dt Yard, Earth Pit Watering And Maintenance Of Open Types Etc., 170 Maintenance Of Distribution Transformer-Providing Of U Jumpering 171 Dismantling Of Other Line Materials - ( Please Mention In Percentage For Respective Line Material Errection Works )