For Engagement Of Sub Contractor For Carrying Out“Detailing Of Structure Drawing, Supply, Fabrication, Surface Preparation, Painting, Third Party Inspection And Transportation Of Bolted And / Or Welded Structural Steel Works At All Levels, Including All Built-Up Sections / Compound Sections Made Out Of Rolled Sections And / Or Plates In Trusses, Rafters, Purlins, Wind. All Structural Steel Material Grade E250 ( Fe410w ) Quality A ( Conforming To Is:2062 & Is-808 ) And To Procure From Approved Vendor ( Sail / Tisco / Iisco / Jindal / Essar / Vizag Steel ) And Bidder Should Dispatch Finished Fabricated Materials With Approved Material Test Certificate ( Mtc ) . 1 Supply Of Fabricated Tructure: 2 Detailing Of Structure Drawing, Supply, Fabrication, Surface Preparation, Painting, Third Party Inspection And Transportation Of Bolted And / Or Welded Structural Steel Works At All Levels, Including All Built-Up Sections / Compound Sections Made Out Of Rolled Sections And / Or Plates In Trusses, Rafters, Purlins, Wind. All Structural Steel Material Grade E250 ( Fe410w ) Quality A ( Conforming To Is:2062 & Is-808 ) And To Procure From Approved Vendor ( Sail / Tisco / Iisco / Jindal / Essar / Vizag Steel ) And Bidder Should Dispatch Finished Fabricated Materials With Approved Material Test Certificate ( Mtc ) .Rateshall Be Inclusive Of All Other Supply And Activities Which Is Not Mentionedbelow But Required To Execute& Completion Of The Supply As Per Client / Tce Specificationsall Complete :- 3 ( Continue From Above ) 1. Procurement Of Structural Steel Material Grade E-250 ( Conforming To Is:2062 & Is-808 ) Including Procurement Of Paints, Consumables, Permanent Nuts, Bolts, Washers Etc.2. Cutting To Required Size, Straightening / Bending If Required, Edge Preparation, Cleaning, Preheating, Bolting, Welding Of Joints, ( Including Sealing The Joints Of Box Sections With Continuous Welding And Plugging Any Open Ends & Holes Of Box Sections ) , Finishing Edges By Grinding.3. Fabrication Of Structural Including Built-Up Sections, Compound Sections Made Out Of Rolled Sections And / Or Plates / Bent Plates In All Types Of Structural Frameworks In Floor Beams, Stairs Or Any Other Structural Items Or Accessories To Support Equipments, Piping, Conveyor Galleries, Towers, Masts, Buildings, Pipe Racks, Platforms, Technological Structures Or Any Other Structure As Specified By Client / Eil But Excluding Silos, Bunkers, Hoppers.4. Shop Assembly To Be Done At VendorS Fabrication Shop As Per Fabrication Drawing By Deploying Equipments, Cranes, Machineries, Tools, Tackles, Cutting, Welding, Bolting, Consumables, Scaffolding All Complete.5. Blast Cleaning With Compressed Air And Blasting Gun Conforming To Swedish Standard ( Sspc-Sp-10 ) Sa 2½.Including All Tools And Tackles, Compressor, Gritetc. 4 ( Continue From Above ) 6. Performance Of Radiographic Inspection ( Ndt ) As Specified By Client / Pmc ( Bpcl / Tce ) 7. Providing And Applying Paint As Followsprimer Coat: After Surface Preparation One Coat Of Inarganic Zinc Silicate @ 65 Micronsintermediate Coat:One Coat Of Epoxy High Built Micaceous Iron Oxide @100 Microns.Top Finish Coat:2 Coats Of Acrylic Alipathic Polyurethane @ 30 Microns Per Coattotal Dft 225 Microns Minimumloading , Transportation, Supply Offabricated Structural Steel Components With Primer Coatto Bandr Project Site At Bpcl 2G Bio – Ethanol Project Bargarh- 768030 Project, Odisha. Final Touch Up To Be Done At Site Before Erectionnote: All Necessary Afc Drawings Will Be Provided To Successful Bidder Free Of Cost. Detailing In Bidders Scope.Unit Rate Shall Be Paid As Per The Approved Detail Drawing Weight Of The Finished Product Subject To The Acceptance Of The Engineer-In-Charge 5 Note:-The Above Rate Shall Be Inclusive Of All Taxes & Duties, Royalties, Cess, Fee, Enviormental & Pollution, Fitness & Safety Clearance Charges ( If Any ) , Or Any Other Incidental Charges Etc But Excluding Gst.