Tender For Mechanical Fabrication Work-1 , Pipeline From 15 Mm To 300 Mm Dia. Dismantle ( Including Nipple Band Flange ) And Put In Scrap Yard. 2 Ms Pipe Of Dia More Than 300 Mm. Dismantle ( Including Nipple Band Flange ) And Put In Scrap Yard. 3 , 15 Mm To 300 Mm M.S. Or S.S. Pipeline Position By Fitting And Giving Trial. 4 Making Of Ms Pipe Of More Than 300 Mm Diameter With 6, 8 And 10 Mm Ms Plate And Making And Replacing Ms Or Ss Nipples From 15 Mm To 300 Mm Dia. 5 6 , Replacement Of Ms Nipples Of Size More Than 300 Mm Dia 8 From 15 Mm To 300 Mm Ms Pipe. Ms Bands Of Size Above 300 Mm Dia. 9 Making Ms Flanges From 15 Mm To 1200 Mm By Cutting Them From Plate And Drilling Them To Fit. Doing. 10 15 Mm To 300 | Making And Changing Ms / Sst. Mm Dia Up To 11 Making Mst Of Dia More Than 300 Mm And Change 12 Making And Replacing Casings From 15 Mm To 300 Mm Dia. 13 Making Of Casings Up To Dia More Than 300 Mm And , Change . 15 Mm To 300 14 Opening Mmm Size Valves Up To 15 The Valve 15 Mm To 300 Mm Size Tie. 16 Opening Of Valves Of Dia More Than 300 Mm 17 Fitting Of Valves Of Dia More Than 300 Mm. 18 , Straightening Of Bent Circular Plate. 19 Corroded Part Of Vapor Pipe, Tank Bezel Etc. , Change. 20 21 Dismantling Of Light Structure Fabrication Of Light Structure 22 Erection Of Light Structure 23 Dismantling Of Heavy Structure 24 Fabrication Of Heavy Structure 25 Erection Of Heavy Structures 26 Round Or Rectangular Tank With Ms Plate , Make And Change 27 Removing Corroded M.S. Gutter And Replacing It With Given Plate, Fixing And Strengthening. 28 Making Circular Coil From 15 Mm To 150 Mm Dia Pipeline And Replacing It With Nipple And Flange And Fitting The Coil In Place. To Give Trial Including Satisfactory Hydraulic Testing. 29 Making Rectangular Coil From 15 Mm To 150 Mm Dia Pipeline With Nipple And Flange And Fitting The Coil In Place And Giving Trial With Satisfactory Hydraulic Testing. 30 Opening And Re-Tying Of Pipelines Of Different Sizes ( Of Different Houses ) Including Valves And Bands Etc. For Cleaning. 31 Cutting The Header Above The Damaged 6 Fixed At Different Places And Making A New One And Fitting All The Nipple Valves Etc Related To It And Giving It A Trial. 22 32 Replacement Of 600 Mm To 900 Mm Dia Necked Man Doll By Making Of 8 Or 10 Mm Plate. 33 Making M.S. Beds For Motor Pump And Reduction Gear Box From 5 To 50 H.P., Giving Satisfactory Trial After Fitting And Alignment. 34 51 To 100 Hp Ms Band Making Fitting And Alignment For Motor Pump And Reduction Gear Box. After Giving Satisfactory Trial. 35 Making Ms Beds For Pumps And Motors Ranging From 5 To 50 Hp, Giving Satisfactory Trials After Fitting And Alignment. 36 Making Ms Beds For Pumps And Motors Ranging From 51 To 100 Hp, Giving Satisfactory Trials After Fitting And Alignment. 37 Dismantling Of Corroded Ms Plate Of Machinery Installed At Various Places And Fitting It With New Plate. ( The Act Of Patching ) 38 Fabricate The Juice Tray Of The Mill From Ss Or Aluminum Plate And Do The Erection And Complete The Related Connection Work And Give The Trial. 39 Cane Carrier Bagasse Carrier Bagasse Elevator And Return Bagasse Carrier Removing Old Runner And Fitting New Runner And Giving Satisfactory Trial. 40 Give Satisfactory Trial By Removing Old Runner Of Secondary Rack Carrier Inter Rack Carrier And Fit New Runner. 41 New By Removing The Damaged Side And Bottom Plates Of Secondary Rack Carrier And Inter Rack Carrier. Fixing Of Side And Bottom Plate And Fixing Of Angle From Outside For Strengthening. 42 Corroded Mesh Bottom Tray Of Old Screw Conveyor. Cut It Out And Fix It In Its Place According To The Bottom Tray Attached As Before. Tadayav But Without Mesh. 43 44 Renovating The Gutter Above The Dsm Screen Placement 45 Fitting Of Juice Rings Of Mill Rollers From Ms Plate. 46 Replacement Of Side Plate Of Cane Carrier And Side And Bottom Plates Of Bagasse Elevator Bagasse Carrier Rbc Which Are Damaged. 47 Replacement Of Damaged Side Plates Of Fiberizer Leveler And Chopper 48 Making New Rakes Of Secondary And Inter Rake Carriers. Rack Repairing Of Secondary And Inter Rack Carriers. 49 50 By Cutting The Corroded Plates Of The Trough Of Inter Rack Carrier. Removal And Replacement Of Given 8 Or 10 Mm Plate And Trial. 51 Remove Square Bar Of Trolley Of Cane Unloader And Fix New Square Bar And Give Satisfactory Trial. 52 Remove The Central Plate Of The Fiberizer, Make A New Plate And Fix It And Give A Satisfactory Trial. 53 Dismantling The Top Guard Of Trpf Of The Mill And Putting It In The Scrap Yard And Making Top Guard From New 8 To 10 Mm Plate And Fixing It Satisfactorily. 54 Cutting The Pine Apple Chevron Groove Of The Mill Roller. 55 Welding The Cut Teeth Of The Cow Pinion Of The Mill And Correcting The Teeth With The Grinder By Welding With The Highfacing Electrode Mentioned On It. 56 Welding And Sizing Of Mill Cut Tailwar. Make According To 57 Welding Of Trpf Rollers Of The Mill And Correcting The Cut Side By Welding Or By Applying Plate. Doing . 58 Secondary Rack Carrier Inter Rack Carrier Bagasse Carrier Bagasse Elevator Removal Of Corroded Angle Below The Runner Of Rbc And Replacing It With New Angle. 59 Juice Attached To The Pipeline Of The Juice Pumps Of The Mill. After Making The Distribution Tray, Fix It In Place. 60 , Cutting And Removing The Old Troughs Of All The Three Inter Rank Carriers On The Mill House And Fixing The Troughs As Per Instructions From The Given 10 Mm Plate And Giving Trial. 61 Removal Of Old Trough Of Secondary Rack Carrier Fitted On Mill House And New Trough From Given 10 Mm Plate 62 By Removing The Damaged Partition Plate Of The Anchile Plate Of The Fibroiser, Replace The New Plate Of 12 Mm As Per The Instructions. Installation, Alignment And Trial. 63 , Cut Out The Necked Part Of The Dsm Screen Fixed On The Mill House And Fix It By Applying The Given Plate. 64 300 To 450 Psi Hydraulic By Removing The Damaged / Weak Sulfur Melter Of Satvik Type Furnace And Fitting The Newly Made Coil From 10 Or 12 Mm Plate. Give A Trial 65 Fitting The Sulfur Melter Coils Of Film Type Furnace Size 3 And 4 Inches With The Given Seamless Pipe As Per The Sample And Testing It Hydraulically At 300 To 450 Psi. 66 Replacement Of Leaf Flat Iron For Rubber Packing Of Top And Bottom Header Of Juice Heater And Giving Trial By Applying Rubber Packing. 67 Removing The Condensate Bottle Of Juice Heater Quad Semi-Condenser Vaporcell And Fixing It According To The Sample From The Given New 8 Or 10 Mm Plate And Giving It A Trial. 68 Cutting Out The Old Damaged Agitator Of Vacuum Filter Size 818 Feet And Preparing And Trialling A New Agitator With Angle Channel Etc. As Before. 69 Cut Out All The Partition Plates Of The Header Of Juice Dewater Straight And Circular. After Cleaning The Tube Plate Beforehand, Make A New Circular And Straight Partition Plate From A Plate Of 10 Or 12 Mm. Prepare Header As Before By Applying Ms Strip And Give Trial By Applying Rubber Strip. 70 Dismantling The Scrubber Cooler Flange Cover Nipple And Pipeline Of Satvik / Film Type Furnaces, Taking Out The Cooler Pipe Etc. And Putting Out The 10 Or 12 Mm Key. Making Cell From Plate And Fitting All Cooling Pipe Made Of Seamless Pipe And Related Nipple Flange Cover Etc. Apply And Prepare As Before And Give Trial. 71 Cutting Out The Damaged Bottom Cone Of Juice Sulphiters Recovery Tower And Fixing A New Cone From 12 Mm Plate. Give Trial By Installing Related Pipeline. 72 Dismantling Out The Damaged Tower Of Syrup Sulphiter. Pouring And Making A New Tower From 8 Or 10 Mm Plate As Before And Make Related Nipple Manhole Partition Plate Air Bent Pipe And Related Pipeline Connection. To Give A Trial 73 Heavy / Light Filtrate Juice Tank Mounted On Small Vacuum Filter | ( Dia 1 M 0 C Height 15 M 0 Approximately ) Cut And Removed. Making Tank As Before From 10.00 Mm Plate And Giving Trial By Fitting Related Nipple Flange Etc. Pipe Line. 74 Heavy / Light Filtrate Juice Tank Mounted On Large Vacuum Filter | ( Dia 1.5 M 0 C Height 1.0 M 0 Approximately ) Cut Out And Made From 10.00 Mm Plate As Before, Prepare And Trial By Fitting Related Pipeline Flange Nipple As Before. 75 Dismantling And Pouring Out The Old Damaged Mud Tank ( Dia 2.5 M X 2.0 M Height ) Of The Small Vacuum Filter. Making A New One With Cover From 10.00 Mm Plate And Preparing And Trialling The Nipple Plunge Manhole. 76 Prepare A Perforated Plate From A Plate Of 8.00 Mm Thickness / 3.5 M Diameter, Inside The Juice Sulphiter, Make About 280 Holes In The Plate And Fix It At The Right Place By Applying An Angle Support. 77 Dismantling Of After Burner Cooler Of Satvik Or Film Type Furnace, 12 Inside Water Jacket Damaged. Replacement Of Pipe With New Seamless Pipe. Prepare And Give Trial As Before By Putting On Jacket Etc. 78 Take Out The Catcher ( Measurement 1.2 X 1.5 M ) Mounted On The Large Vacuum Filter And Prepare A New Catcher With A Partition Plate From 10.00 Mm Plate As Before. Preparing And Applying The Related Nipple Flange Line. Give A Trial 79 The Shell Of The Sulfur Furnace Is Made Of 12 Or 16 Mm Plate. Make It By Folding It And Fix It By Making Front And Back Cover And Water Jacket And Give Trial By Making All The Connections Etc. As Before. 80 Replacing The Gully Plate Of Mud Mixture With A New Plate And Making The Screw Conveyor Attached To It In Place As Before. Give A Trial By Applying It. ( Lamsum ) 81 Cutting Out The Corroded Base Plate Of The Door And Replacing It With A New One. Make And Fit The Plate As Before. ( Lamsum ) 82 Cut Out The Overflow Gallery Inside The Syrup Sulphiter And The Syrup Box Outside Which Is Damaged And Give A Trial By Making It From The Given 8 Or 10 Mm Plate As Before. ( Lamsum ) 83 After Removing The Condenser Of The Vacuum Filter, Put It In The Scrap Yard And Replace The Condenser With A New Plate Of 8 Or 10 Mm. Make It Fit And Give It A Trial. ( Lamsum ) 84 Incoming And Outgoing Boxes Fitted Between The Double Beat Valves Of Juice Dewaters And The Headers Of Juice Heaters. Dismantling And Installing A New One From 12 Mm Plate As Before And Giving A Satisfactory Trial. 85 Juice Sulphite, Syrup Sulphite And Other Places By Dismantling The Worn Out Manholes And Making New Ones In Place. Placement . 86 400 Mm 4 Sizes In Vapor Line Of Juice Heater. Cutting Out Sore Nipples Of One Meter Length And Making New Ones As Before 87 Dismantle The Foaming Chamber Of The Clarifier Which Is Damaged Or Weak And Put It In The Scrap Yard And Give A Satisfactory Trial By Erecting The Foaming Chamber With The New 8 Or 10 Mm Thick Plate Provided. 16 Inch 4 Angle Valve Of Vapor And Exhaust Of Juice Heater. Removal Of Gully Body And Making Of New 10 Mm Thick Plate By Turning And Giving Trial. ( Lamsum ) 89 Cutting Out The Damaged Vatum Tank ( Measurement 2.25 X 2.45 M Approx ) Of Water Weighing Scale And Making A New One With 10 Mm Plate. Preparing And Giving Trial As Before By Installing Related Pipe Line Nipple Support Etc. 90 Cutting Out The Side Plate Of The Overhead Hot Water Tank And Making A New One From A Plate Of 8 Or 10 Mm. Applying And Giving A Satisfactory Trial 91 Removing Damaged Water Tank Of Juice Weighing Scale. Making Tank From New Plate In Place And Giving Trial. ( Dia 3 5 M X 3.0 M Height ) ( Lumsam ) 92 Removal Of Damaged Internal Parts Of Vapor Cells And Valves Fitted In Quad Body, Replacement And Trial Of New Ones. ( Lamsam ) ( Size 2 X 1.5 M ) 93 Taking Out The Old Brass Or Ss Tubes Of Juice Heater And Semi-Condenser, Weigh Them And Deposit Them In The Store. 94 Weighing Out Old Brass Or Ss Tubes Of Quad And Vapor Cells And Depositing Them In The Store. 95 Expanding By Fitting New Brass Tube Or Ss Tube Of Juice Heater And Semi-Condenser And 75 To 100 | Giving Hydraulically On Psi. 96 Expanding Quad And Vapor Cell By Fitting New Brass Tube Or Ss Tube And Giving It Hydraulically At 75 To 100 Psi. 97 Take Out The Quads External Catcher By Opening It And Replace It With A Bent Agile Channel And Flat Iron And Give It A Trial. , ( Lamsum ) 98 Replacement Of Condensate Box Of Calendria Of Quad Wadi And Vapor Cell , And Give Trial. 99 Cutting Out The Semiconductor Vapor Cell, Quads Bottom Saucer Along With Valve Pipe Line And Nipple Etc. Making Bottom Saucer From 10 Or 12 Mm Plate As Before And Giving Trial By Fitting Related Pipe Line Nipple And Valve Etc. ( Lamsum ) 100 Open The Top Cover Of The Semiconductor To Take Out The Tube And After Applying The Packing, Tie The Cover As Before And Give It A Trial. 101 Open The Top Cover Of The New Semiconductor To Remove The Tube. And Tie It Again By Applying Joint And Give Trial. 102 Re-Fabrication Of External Catcher / Vapor Body Of New Semi-Condenser ( 1000 Sq. M. ) From 8 / 10 Mm Plate Which Was Degaussed. ( Size Dia 25M Height 3.5M ) / ( Size | Dia 2.5M Height 3.5M ) 103 Ditching The Bottle Of Quad Catcher And Putting It In The Scamp Yard And 12 M Long C 0.8 M From The New Plate Of 10 Mm. Making And Connection Of New Bottle Of Diyas And Vacuum. To Give A Trial ( Lamsum ) 104 Cutting Out The Corroded Distributor Of The Pan And Putting It In The Scrap Yard And Making A New One From 8 Or 10 Mm Plate, Stressing And Giving Trial. ( Lamsum ) 105 Cutting And Removing The Damaged Umbrella Of The Pan And Making A New One From 6 Or 8 Or 10 Mm Ms Plate And Its Stranding And Trial. ( Lamsum ) 106 Take Out The Old Brass Tubes Of The Pan And Weigh It In The Store. Submit . 107 Expanding By Fitting New Brass Tube In The Pan And Giving It Hydraulically At 100 Psi. 108 Take Off The Damaged Catcher Of The Pan And Put It In The Scrap Yard And Make A New One From 8 Or 10 Mm Plate And Give A Trial By Fitting The Element And Vapor Pipe As Before. ( Dia 1.5M X 2.5M Height ) 109 Cutting Out The Cyclone Stuck Above The Sugar Dust Miller Tank And Replacing It With 5 Or 6 Mm. Making A New One From The Plate And Giving It A Trial. ( Lamsum ) 110 Removing Corroded Wet Suit Of 1350 Kt Centrifugal Machine And Making A New One From 3 Mm Plate. 111 Taking Down The Transit Deaerator Mounted On The Top Of The C-Sentry Machine, Cleaning It By Opening Its Side Plates, Blinding The Leaking Tubes, Hydraulically Fitting Them In Place And Making All Connections. 112 Opening Of Blinds In The Pipeline Of Spray System And Replacement Of Corroded Nozzle Cluster, Cleaning, Replacement Of Corroded Branch Pipeline And Tying Of All Blinds Opened After Cleaning And Satisfactory Trial Of The System. 113 Replacing The Cut Gun Metal Bush By Removing The Worm Wheel Of The Vacuum Crystallizer And Crystallizer, Then Putting The Worm Wheel Back In Place, Aligning The Same Worm Shaft Ag Box Motor And | Successful Trial. 114 The Necked Side Cover Of The Id Fan Fixed On Sugar Dust And The Top Necked Plate Should Be 8 Or 10 Mm. Making A New One From The Plate And Replacing All The Angle Channels Attached To Its Bottom Frame By Stranding In Place. To Apply, To Give A Trial. ( Lamsum ) 115 Removal Of Old Tail Pipe Fitted In Pans And Delivery To Scrap Yard And Trial Fitting Of New Ss Tail Pipe 116 Give . ( Lamsum ) Corroded Side Plates And Roof Plates Of Boilers Removal And From 3 Or 5 Mm Thick Plate Of Ms. Replacement And Fitment Of Old Ejected Correct Plate. Removal Of Corroded Plates Of Palu Gas Ducting Of Boilers By Cutting And Installation Of New Ms Plate Of 5 Mm Thickness. 117 118 Dismantling Of Damaged Parts, Side Plates / Shells / Cones Etc. At Various Places And Fabricating Them With New Plates. Installation And Trial. 119 Cutting And Replacing Corroded Plates Of Id Fans. 120 Removal Of Damaged Expansion Joint Fitted In Flue Gas Ducting Of Boiler No. 1 And 2 And 3 Or 5 Mm Plate. Make New Ones From It. 121 Cutting Out The Damaged Ash Soot Of Boilers And Making New Soot From The Given Plate Plate And Giving Trial. 122 Cutting Out The Necked Part Of The Bagasilo Suit And Blower Installed Below The Bagasse Elevator And Making It With A New Plate. 123 Replacement Of Throated Suit Of Bagasse Feeder Of Boiler No. 1 And 2 With Ms Plate Of 6 Or 8 Mm. 124 The Flue Gas Ducting Of Boilers And Vat Scrubbers Should Be Removed By Cutting And Making New Manholes. 125 Cut Out The Defective Mesh Fitted In The Bagasse Elevator And Give A Trial By Installing New Mesh. 126 Cutting Out The Old Drain Vessel Tank Of Bat Scrubber No. 1 And 2 And Fitting New Tank And Drain Pipe To Weld 127 Removal Of Broken Band Of Transmission Gear Of Mills And | Make And Fix New Ones From The Given 40 And 25 Mm Plates, After That Keep All The Plumber Blocks In Their Place. After Alignment, Put The Transmission Gears In Place. Give A Successful Trial By Applying It. 128 , Removal Of The Screw Conveyor Installed On The Mill House And Replacing It With A New Screw Conveyor Made Of 6 Mm Plate. Putting Alignment And Giving Satisfactory Trial. 129 Cut And Remove The Damaged Top Cover Of Trpf Of The Mill And Make A Sample From The Given 8 / 10 Mm Plate And Fix It As Per The Given Place. 130 Removal Of Drive And Stool Of Molasses Conditioner By Cutting And Making A New One And Repairing The Cut Shaft By Welding And Fitting It Satisfactorily. To Give A Trial 131 Cutting Out The Necked Taper Cone Of The Pans And 40 Cm Circumference Of The Circuit Cell From It And Cutting Out The Inside Washing Coil And All The Connections Related To It And Fabricating It From 10 Or 12 Mm Plate And Putting It In Place And Giving Satisfactory Trial By Making All The Connections Related To It. 132 B. Magma Mixer Or Pugmill 10 Mm New Or Old Plate To Make A New 8 Meter Length And Put It In The Scrap Yard. Cut The Gutter Inside The Mixer From Inch Size Pipe And Fit All The Arms And Run And Give A Satisfactory Trial. 133 Bagasilo Pipeline Dipping Down And Throated. Fit On 14 Meter Height By Installing Pipe Band Support Clamp Etc. Give Trial By Doing. ( Lamsam ) 134 Removing The Old And Damaged Rail Of The Bridge Of The Cane Unloader And Replacing It With The New Rail Provided And Testing It By Stranding It. Boiler 135 Cutting Out The Rotten Main Holes Of Boiler No. 136 Removing The Corroded Top Cover Of The Tee Above The Pans And Making A New One From 10 Mm Plate And Giving A Satisfactory Trial. ( Lamsum ) 137 Removal Of Worn Out Water Coils Of Crystallizers And Fitting Of New Ones And Giving Satisfactory Trial. 138 Cutting Out The Corroded Distributor Plate Of Pans And Making A New One And Giving A Satisfactory Trial. ( Lamsum ) 139 Fixing Of Pan Station Condenser Platform Made Of Old Plate With Neck Of Condenser And Crystallizer. 140 Dismantling Of Damaged Rectangular Melter Of Film Type Sulfur Burner From The Given 8 / 10 Mm Ms Plate. Complete All Work And Give Trial ( Size 3.0 M X 2.0 M X 1.75 M ) ( Lamsum ) 141 Cutting Out The Corroded Domes Of The Pans And Making New Ones From 8 Or 10 Mm Plates, Of Vapor Pipes. Making Connection, Stranding As Per Requirement And Giving Trial. ( Lamsum ) 142 Cutting Out The Heat Source Of The Pans And Re-Welding Them By Applying Ring And Giving A Satisfactory Trial. ( Lamsum ) 143 Remove The Old Tray Of The Hopper And Put It In The Scrap Yard, Make A New One From 3 Or 5 Mm Plate And Install It Satisfactorily. To Give A Trial ( Lamsum ) 144 Taking Out The Plate Of Corroded Down Take Of The Pans And Making A New One By Bending It From A Plate Of 8 Or 10 Ms And Giving A Satisfactory Trial. ( Lamsum ) 145 To The Base Box Of The Bagasse Carrier And The Runner Of The Abc. Satisfactory Trial By Cutting And Aligning. To Give 146 Modifying Sugar Shoots Of Graders Engaged In Dryer House And Giving Satisfactory Trial. 147 Dismantle The Taper Core Of The Maceration Water Tank, Make A New One And Face The Seat Of The Taper Cone Of The Tank. Cut Off The Center Rod In The Old Pipe And Fix The Center Rod In The New Pipe And Balance The Tank And Give A Satisfactory Trial. ( Lamsum ) 148 Cutting Off The Old Hopper And Making The Hopper By Bending It With A New Plate And Making Its Frame With An Angle, Fitting The Driving Shaft, Aligning It And Giving A Satisfactory Trial. ( Lamsam ) 149 Cutting And Dismantling The Old Melted Sugar Melter, Removing The Reduction Gear And Motor Mounted On It, Making Sugar Melter From The Given New Plate And Aligning The Shaft Reduction Box And Motor Etc By Fitting And Connecting All The Pipelines Related To It And Give A Satisfactory Trial. ( Lamsum ) 150 Cutting And Removing The Old Boxes Of The Old Semiconductor And Making New Boxes Of Size 850 X 850 Mm From The Given 10 Mm Plate, Welding Them From Inside And Outside And Fitting The Boxes On Top Of The Semiconductor. 151 20 | Making Frame / Base From Mm Plate, Fitting New Double Beat Valve And Giving Satisfactory Trial. 152 To Install A New Centrifugal Machine, Remove Its Platform And Prepare Its Beam Structure To Install The New Machine. Installation And Re-Platforming. ( Lamsum ) 153 Strengthening Of Header Of Vapor Lone Juice Heater And Juice. Removes Heater Cover, Repairs Cover And Fits Cover. ( Lamsum ) 154 Fitting A New Vertical Pump In The Injection House With Motor Etc. On Top Of It And Its Related 850 | Laying 20 Meter Pipe Line Of Mm Dia And Making Three Bands Of 650 Mm Dia Related To It. And Giving Successful Trial Of The Pump. ( Lamsum ) 155 Cut Out All The Coils And All The Angles Attached To The Compartment Of The Clarifier And Fit Them In Place After Completion Of The Work. ( Lamsum ) 156 Cleaning The Surface Of The Vertical Side Plates Of The Compartment Of The Clarifier And Overlapping With The Given 8 Mm Ms Plate And Given At The Remaining Places. Cutting And Fitting Ms Plate And Flat Iron And Giving Leak Proof Trial After Complete Welding Work. ( Dia 30 | Fit Height 5 Feet ) ( Lamsum ) 157 To The Choked Distributor Of The Clarifier Compartment. Cutting It Out And Putting It In The Scamp Yard And Making A New One From The Given 8 / 8 Mm Ms Plate And Giving A Satisfactory Trial After Doing All The Work. ( Lamsum ) 158 Fabricating The Weak Cell Of Juice Sulphiter With The Given 10 Mm Ms Plate, Overlapping It All Around And Fitting It And Doing All The Connections Etc Related To It And Completing All The Welding Work And Satisfactory Trial Lumpsum ) . Give. , 159 Reamer For Making Hole Sign In Tube Plate Of Juice Dieter. Running, After Making Hole Sign, Fitting All The Tubes ( 312 Nos. ) And Expanding From Both The Places And Giving Satisfactory Hydraulic Trial. ( Lamsum ) 160 Cutting Out The Damaged Taper Cone, Sewal, Cell ( From The Top Of The Tube Plate ) Of The Pan And Fabricating It With A New Ms Plate Of 12 Mm And Fixing All The Connections Related To It As Before And For Stranding At Different Places In The Entire Cell From Inside. Installation Of Ribs Support And Satisfactory Vacuum Trial After Completing All Related Works ( Dia- 5.5M Height 2.5M ) ( Lamsum ) 161 All Connections Related To The Syrup Tank Located On The Pan. Removal Of Platform, Staging Etc. And Syrup Tank. Cutting And Removing It And Putting It In The Scamp Yard And Making A New Syrup Tank By Fabricating It From The Given 6 Mm Plate And Fitting It In Place And All The Connections Related To It Etc. To Do And Complete All The Work And Give A Satisfactory Trial. ( Lamsum ) 162 C.I. Sluice Valve 24 Dia And N.R.V. Located On The Ejection And Cut Off All The Connections Related To It And Put It In The Scrap Yard And Replace It With New Pop-Up Valve 24 Dia. ( Lamsum ) 163 Fitting And Satisfactory By Making Siphon Of 150 Mm. Give A Trial 164 , Making And Fitting Siphons Of 100 Mm Dia And Giving Satisfactory Trials. ( Lamsum ) 165 Installing Flowmeters At Different Places And Giving Satisfactory Trials By Fitting Related Nipples, Bands, Flanges And Siphons Etc. 166 Deo The Damaged Mesh Of The Saxon Pipe Located On The Injection And Fit It By Making A New One From The Given Ms Plate. , Doing . 167 Removal Of Drive Of Mechanical Circulator Mounted On Pan No. 8 And Cutting Out The Base Plate Of The Drive And 1100 Mm Dia Base Plate From 25 Mm Ms Plate. Prepare . Stop The Shaft By Giving Support And Align It By Fitting The Bush, Fit The Motor By Fitting The Stand And Give A Satisfactory Trial. ( Lamsum ) 168 Damaged Shell Plate Near The Roof Of Molasses Tank No.1. Cutting It Out And Replacing It With A New One Made Of 06 Mm Plate And Changing The Related Connections And Giving A Satisfactory Trial. ( Lamsum ) 169 Taking Out The Id Fan Of Boiler 42 Kg Pressure Capacity Installed In The Mill And Removing Its Complete Casing From The Foundation, Replacing It With New Ordered Casing And Taking The Fan To The Site And Removing Ash Shoots And Machines Falling On The Way And Re-Installation Of Ash Chute And Machine, After That Placing On Casing Foundation, Water Labeling And Installation According To Id Fans Damper And After Fitting Casing, Modification In Ducting Of Id Fan, Then Id Fan In Main Shaft Casing. Putting It On, Covering It And Giving A Satisfactory Trial By Alignment. ( Lamsum ) 170 Fixing Tin Shed On Rbc By Making Pillar From Ms Pipe / Angle / Channel ( Lamsam ) 171 Cutting And Removing The Damaged Casing Of Bagasillo Fan. Making A New One From The Given 8 Mm Ms Plate And Giving A Satisfactory Trial. 172 Dismantling The Damaged Channel, Angle And Beam Etc. Of The Platform Located On The Castlizer And Fitting The Given Channel, Beam And Angle Etc. ( Lamsum ) 173 Dismantling The Casing ( Length 17 M ) Of The Entire Ms Plate Of Sugar Elevator And From The Given Ms Plate. Modify And Put In Place 174 Dismantling Of All Damaged Angle Channel And Plate Etc. By Taking Down The Sugar Grader And Replacing It With Given Ms Channel Angle Plate Etc. And Satisfactory By Putting In Place. To Give A Trial ( Lamsum ) 175 Dismantling The Trpf Bottom Cover Of The Mill And Putting It In The Scrap Yard And Making The Cover From 8 / 10 Mm Plate. After Fitting It In Place, Give It A Trial. ( Lamsum ) 176 , Removing The Damaged Juice Trays Of Trpf Rollers ( Which Are Fixed On The Mill Head Stocks ) And Putting Them In The Yard. Fixing Of New Tray In Place From 8 / 10 Mm Plate || ( Lamsum ) 177 Cutting Out The Damaged Furnace Suit Of Boiler And Fixing It By Making Of B / 10 Mm Plate ( Lumsam ) 178 The Size Of The Juice Tank Installed At Mill No. 01 Is 1.4 M Dia. Remove 1.5 M Length Which Is Damaged And Put It In The Scrap Yard And Make Juice Tank From The Given 8 / 10 Mm Plate And Do Erection In Place And Trial By Connection As Before. Give . ( Lamsum ) 179 Juice Tank Size 1.3 M Dia 1.5 M Length Installed At Mill No. 02, Remove The Damaged One And Put It In The Scrap Yard And Make Juice Tank From The Given 8 / 10 Mm Plate And Do The Erection At The Place And Give The Trial Connection As Before. ( Lamsam ) 180 Juice Tank Size 1.0 M Dia 1.5 M Length Installed At Mill No. 03, Which Is Damaged, Should Be Removed And Put In The Scrap Yard. And By Making A Juice Tank From The Given 8 / 10 Mm Plate, Do Erection At The Place And Give Trial By Connection As Before. ( Lamsum ) 181 Juice Tank Size 10 Meter Dia 1.6 Meter Length Installed At Mill No. 04, Removing The Damaged One And Putting It In The Scrap Yard And Making Juice Tank From The Given 8 / 10 Mm Plate. Place Erection And Give Trial By Connection As Before. ( Lamsum ) 182 Juice Tank Installed On Skein Juice Which Is Damaged / Leakage. Removing It And Putting It In The Scrap Yard And Making A New One From The Given New 10 / 12 Mm Plate And Giving Trial By Making Related Connections Etc. ( Lamsum ) T 183 Mill No. 01, Removing The Damaged Gutters And Putting Them In The Yard And Making Gutters From The Given New Pipe Line / Plate And Installing Them In Place And Giving Trial By Connection. ( Lamsum ) 184 Juice Tank Size 2.15 M Dia. Installed On Skein Juice Pump. Remove The 3.0 M Length Which Is Damaged / Leakage And Put It In The Scrap Yard And Erect It By Making A New One From The Given New 10 / 12 Mm Plate And Postpone It By Making Related Connections Etc. ( Lamsam ) 185 Removing The Damaged Watm Guard Of Cow Pinion Of Mill No. 01, 02 And 03 And Putting It In The Yard And Fitting The Cover Guard With The Given New 2 / 3 Mm Plate As Per The Sample. ( Lamsum ) 186 Removing The Damaged Top Guard Of Cow Pinion Of Mill No. 01, 02 And 03 And Putting It In The Yard And Fitting The Cover Guard According To The Sample From The New 2 / 3 Mm Plate Given. ( Lamsum ) 187 Mill No. Removing The Damaged Watm Guard Of 04 Cow Pinion And Putting It In The Yard And Fitting The Cover Guard With The Given New 2 / 3 Mm Plate As Per The Sample. ( Lamsamm ) 188 Mill No. Removing The Damaged Top Guard Of Cow Pinion Of 04 And Putting It In The Yard And Fixing The Cover Guard According To The Sample From The Given New 2 / 3 Mm Plate. ( Lamsum ) 189 Mill No. Making Scraper Of Under Feed Roller As Per Sample From Given New 12 / 16 Thick M.S. / S.S. Plate / M.S. Rod / M.S. Square As Per Damaged Scraper Of Under Feed Roller Of 04 And Giving Satisfactory Trial. ( Lamsum ) 190 Mill No. By Cutting The Tail End Of The Inter Rack Carrier Installed On 04, Increasing The Length Of The Inter Rack Carrier By About One Foot And Giving A Satisfactory Trial By Jointing The Runner Side Plate And Labeling The Drive Shaft And Tail End Shaft Line ( Lamsum ) . 191 Mill No. Cutting And Removing The Bed Of The Last Motion Of The Transmission Gear Of 03 And Making The Band As Before From The Given New 25 / 40 Mm Plate And According To The Plumber Block, Drill For Bolts Etc. And Give A Satisfactory Trial. ( Lamsum ) 192 Repairing The Lines Of 20 Tonne Capacity Eot Cane Installed In The Mill House, Which Have Been Cut At Several Places And Giving Satisfactory Trials By Changing The Rail As Per Requirement. ( Lamsum ) 193 Cut Off The Ci Sluice Valve 24 Dia And All The Connections Related To It On The Spray And Put It In The Scrap Yard And Modify It To Install The New Popup Valve 24 Dia Given In Its Place And Give A Satisfactory Trial After Completing The Work. ( Lamsum ) 194 Dismantling The Resistance Box And Making A New One From The Given M.M. Plate And Placing It In Place And Stranding. Doing And Giving Leakproof Trial By Welding. ( Lamsum 195 Cutting Out The Damaged Monitor Casing And Ribs Inside The Centi Machine And Fabricating It With New 12 Mm Ms Plate And The Work Is Completely Satisfactory. To Give A Trial ( Lamsum ) 196 Completely Cutting Out The Taper Cone Of The Dome Of Pan No. 3 And Fixing It With A New 12 Mm Ms Plate. ( Lamsum ) 197 Cutting And Removing The Necked Box Of The Telescope Of The Door And Making The Box From The Given Plate, Installing A New Pipe Line Of 150 Mm Size For The Valve, Putting The Top Cover, Welding It And Giving It A Trial. ( Lamsum ) 198 Dismantling The Platform, Pipe Tank, Steam Cone Etc. Under The Body No.2 Of The Old Quad Set And Placing The Claydria At The Specified Place And Placing The New Claydria. Carrying Out Erection And Giving Satisfactory Vacuum Trial After Completing All The Related Work. ( Lamsum ) 199 Cut The Ci Sluice Valve 12 Dia And Nrv And All Its Related Connections On Injection And Put It In The Scamp Yard And Complete The Work By Modifying It To Make Popup Valve 12 Dia Instead And Give Satisfactory Trial. ( Lamsum ) 200 Old Corroded Band Of Saxon Pipe Of Ejection And Spray Pump, Reducer Cut To Scrap Yard And Flange. Cut And Clean And Fit By Making New Bender And Reducer. Doing And Giving Trial By Welding. ( Lamsum ) 201 Decommissioning Of Faulty Cyclone, Mud Tank Box, Flavor Valve Etc. Fitted On Vacuum Filter And Given 5 | Making New One From Mm Plate And Making Box Flapper Valve And Making Standing Platform From Boiler Tubes And Giving Trial After Doing All The Work. ( Lamsum ) 202 Cutting Out The Side Plate Of The Vacuum Filter ( Size 14 28 ) And The Damaged Plate Of The Left Tray And Fitting It Made Of The Given 10 Mm Ms Plate And Fitting All The Connections ( Nipple, Box Band ) Etc. Leaked. Trial By Proof Welding. ( Lamsum ) 203 Cleaning The Egil Fitted In The Top Above The Clarifier And Overlapping With The Given 6 Mm Ms Plate And Welding The Casing Of The Egil ( 50 X 50 X 8 Mm ) And Giving Leakproof Trial. ( Lamsum ) 204 Cleaning The Surface Of Watm Plate Of The First Compartment Of The Clarifier And Cutting The Bud Of The Given 8 Mm Ms Plate. Cut 100 Mm Hole In Bud And Overlap With Plate And Give Leak Proof Trial By Applying Flat Iron On Entire Periphery Plate Along With Vertical And Watam Plate. ( Lamsum ) 205 The Element Of The Catcher ( Size 75 X 75 X 8 Mm ) To Be Fitted In The Pan Should Be Made At An Angle. ( Lamsum ) 206 Dismantling The Damaged Scroll Of Mud Mixture And Making A New One From The Given 4 Mm Ms Plate. Give Trial By Applying As Before. 207 Cut Out The Damaged External Catcher Of The Semi Condenser ( 800M2 Heating Surface ) And Fix It With The Given Be 10 Mm Ms Plate As Before And Make All Related Connections Satisfactory. Size 2. 5 Meter Cup X 2 Meter Height ( Lamsum ) 208 Removal Of Damaged Shell ( Top Of Tube Plate ) Of Semi Condenser ( 1000 M2 Heating Surface ) By Cutting 3.5 M X 45 M From Given 10 Mm Ms Plate. Make And Install Height And Give Satisfactory Trial By Making All Related Connections. ( Lamsum ) 209 Cut Out The Damaged Shell ( Above The Tube Plate ) Of Syrup Sulphiter And Fix It By Making A 2.5 M X 7.5 M Height Cup From The Given 8 / 10 Mm Ms Plate And Give A Satisfactory Trial By Making All The Related Connections. ( Lamsum ) 210 Dismantle All The Damaged Cooling, Coil, Center Shaft And Worm Wheel Drive In Crystalizer No. 8 And 7 And Put Them In The Scrapyard. ( Lamsum ) 211 200 Meter Square Cooling Surface Coil In Crystallizer No. 8 And 7, Making Of 3 / 4 Dia Ms Pipe As Per Drawing And Trial By Hydraulic Testing On 75 Chap And Its Related Header Flange, Nipple Completion Of Work By Fitting Bands, Valves, Reducers Etc. ( Lamsum ) 212 Damaged Agitator Of Vacuum Filter Size 14 X 28. Cutting Out And Installing A New Agitator Like Before From Ms Angle Channel Etc. And Trial By Doing All Related Works. ( Lamsum ) 213 , To Keep The Clear Juice Filtration Tank At 4 Meter Height, Make Four Columns With Ms Channel And Ms Angle And Make Platform For Keeping The Tank With Ms Beam And Boiler Tube, Complete All Related Works Including Railing And Give Trial. ( Lacsum ) 214 Repair Of Damaged Rails / Square Wares Of Cane Unloaders. To Do And Give Satisfactory Trial By Fitting New Rail / Square Wart As Per Requirement. ( Lamsum ) 215 The Font Plate Of Donali Shoot Installed On Mill No. 1 Has Melted, Which Should Be Removed From The Side And Replaced With A New Plate Of 8 Mm Thick, Prepared With A Support Of Ms Flat And Fit On The Side And Give A Satisfactory Trial. ( Lamsum ) 216 The Font Plate Of Donnelly Shoot Installed At Mill No. 2 Got Melted. Which Is Removed From The Side, Prepare In Its Place A Support Of Ms Flat From 8 Mm Thick New Plate And Give A Satisfactory Trial By Fitting It On The Side. ( Lamsum ) 217 Runner Base Of Inter Rank Carrier Of Mill No. 1 Has Melted And Replaced By 150 Mm Channel. Changing The Runner Base Of Both The Sides And Giving Satisfactory Trials. 218 The Base Channel Of The Inter Rank Carrier Dome Of Mill No. 1 Has Melted, Which Needs To Be Dismantled And Removed And A 150 Mm Channel Has Been Fitted In Its Place, Which Is Satisfactory. To Give A Trial 219 After Cutting The Watm Trough And Side Plate Of Inter Rack Carrier No. 3, Welding It By Applying 6 Inch Wide 8 Mm Thick Plate And Giving A Satisfactory Trial By Aligning It. ( Lamsum ) 220 Erection Of Fabricated M.S. Pipe Of Different Sizes. To Do And Give Leak Proof Trial. 221 Sugar Collar / Flange Of Ram Of A-Frame Of Mill No. 222 Reboring Of Eye Valves In Pin Holes Of Head Stock Of Mill No.02 At Mill Site 223 For Conversion Of Hydraulic Liners Of Mill No. 03 And 04. Build On 224 Wornout Ss On The Side Plates Of The Fibrizer. Removal Of Plate / Liner And Trial By Fitting The Given New Ss Plate On Bottom And Top Side Plates And Refactor Plate. 225 Cutting Out All The Damaged Cooling Pipe / Arm Fitted In The Generator And Fitting 16 Mm Flat Iron As Required By Making A River / Arm And Give A Satisfactory Trial. 226 Cutting Out The Partial Plate Of The Damaged Top / Bottom Header Of New / Old Vapor Line Juice Heater And Bending It With 12 Mm Thick Plate And Applying Reverse For The Dieter Strip And Completing All The Work Satisfactorily. To Give A Trial 227 Cutting Out The Damaged Plate Of Vacuum Filter Size 8 X 16 Side Plate And Bottom Tray And Fixing It Made Of Given 10 Mm Ms Plate And Giving Leak Proof Trial By Making All Connections. 228 Cutting Out The Intermediate Tray Of The Clarifier And Fitting A New One From The Given 8 Mm Plate And Completing All Related Work And Giving Leak Proof Trial. 229 Cutting Out The Chipper Cone Porson 5450 ( Approx. ) Fitted Between The Calandria And Cell Of The Pans And 12 Mm. Make It From Thick Plate And Give A Satisfactory Trial By Making All The Connections In Place And Putting It Like Before. 230 4 Inch Dia In Aeration Tank Installed On Etp Line Up By Making A Header And By Making 140 Eight Holes Of 1.10 Meter Each From The Old Super Heaters Pipe And Give A Satisfactory Trial.