Fabrication Of Different Item As Per Attached Sheet For Si Scheme Under Gondal Division Office. ( E-Tender ) -1 Ht Tapping From The Existing Pole Including Fixing Ofcross Arms, Clamps Anti-Climbing Devices, Dangerboard, Insulators Etc. Complete And Painting Offabricated Materials And Numbering Complete Withcost Of Paints As Per Standard Specification But Excluding Erection Of Guy Set And Earthing. 2 Erection Of Psc Poles Of 8 Mt. / 200 Kg Includingexcavation Of Pit And Refilling Of Earth, Fixing Ofcross Arms, Top Fitting Clamps Anti-Climbing Devices, Insulators Etc. Complete And Painting Of Fabricatedmaterials Used On The Poles And Numbering With Cost Of Paint As Per Standard Specification But Excludingerection Of Guy Set And Earthing. 3 Erection Of Steel Poles Of 9 To 11 Meters Includingexcavation Of Pit And Refilling Of Earth, Fixing Ofcross Arms, Top Fitting Clamps Anti-Climbing Devices, Danger Board, Insulators Etc. Complete And Paintingof Steel Pole, Fabricated Materials Used On The Poleand Numbering With Cost Of Paint As Per Standardspecification But Excluding Erection Of Guy Set Andearthing. 4 Erection Of Steel Pole Of 13 Meters For Railwaycrossing On Bg / Mg / Ng Line For 0.400 / 11 / 22Kv Overheadlines I.E Including Excavation Of Pit & Refilling Ofearth, Fixing Cross Arms, Top Fitting Clamps, Anti-Climbing Devices Danger Board, Insulators Etc. Complete And Painting Of Steel Poles, Fabricatedmaterials Used On The Poles And Numbering With Costof Paint As Per Standard Specification But Excludingerection Of Guy Sets And Earthing. 5 Erection Of Double Pole Structure Of 8 Meters 200 Kgpsc Poles Including Excavation Of Pits & Refilling Ofearthing, Fixing Of Channels, Supporting Angles, Clamps, Anti-Climbing Devices Danger Boards, Insulators Etc.Complete And Painting Of Fabricatedmaterials Used On The Poles And Numbering With Cost Of Paint As Per Standard Specification But Excludingerection Of Guy Sets And Earthing. 6 Erection Of Double Pole Structure Of 9 To 11 Meters.Steel Pole Including Excavation Of Pits & Refilling Ofearth, Fixing Of Channels, Supporting Angles, Clamps, Anti-Climbing Devices Danger Boards, Insulators Etc.Complete & Painting Of Poles, Fabricated Materialsused On The Poles And Numbering With Cost Of Paintsas Per Standard Specification But Excluding Erection Of Guy Set And Earthing. 7 Erection Of Double Pole Structure With Mounting Ofab Switch, Hg Fuses Of 8 Mtrs 200 Kg Psc Polesincluding Excavation Of Pits And Refilling Of Earth, Fixing Of Channels Supporting Angles, Clamps, Anti-Climbing Devices, Danger Boards, Insulators, Dofuses Etc. Complete And Painting Of Fabricatedmaterials Used On The Poles And Numbering With Costof Paint As Per Standard Specification But Excludingof Erection Of Guy Set And Earthing. 8 Erection Of Double Pole Structure With Mounting Ofab Switch, Hg Fuses, 9 To Meters Steel Poles Includingexcavation Of Pits And Refilling Of Earth, Fixing Ofchannel, Supporting Angles, Clamps, Anti-Climbingdevices , Danger Boards, Insulators, Etc. Complete And Painting Of Poles Fabricated Materials Used Onthe Poles And Numbering With Cost Of Paint As Perstandard Specification But Excluding Erection Ofguy Set And Earthing. 9 Erection Of Double Pole Structures With Mounting Ofab Switch, Hg Fuses, Transformers, Lighteningarrestors, Distribution Box. Of 8 Meters 200 Kgand Psc Poles Including Excavation Of Pits And Refilling Of Earth, Carting Of Transformers Fromstores To Site, Fixing Of Channels, Supporting Angles, Bracings Cross Arms Clamps, Anticlimbing Devicesdanger Boards, Conductor And Cable Wiring Etc.Complete And Painting Of Fabricated Materials Usedon The Poles And Numbering With Cost Of Paint As Per Standard Specification But Excluding Erection Ofguy Sets And Earthing. 10 Erection Of Double Pole Structure With Mounting Ofab Switch, Hg Fuses Transformers, Lighteningarrestors, Distribution Box 9 To 11 Meters Steel Polesincluding Excavation Of Pits & Refilling Of Earthcarting Of Transformers From Store To Site, Fixingof Channels Supporting Angles, Bracing, Cross Arms, Clamps, Anticlimbing Devices, Danger Boards, Conductor And Cable Wiring Etc. Complete Andpainting Of Poles Fabricated Materials Used On Thepoles And Numbering As Per Standard Specificationbut Excluding Erections Of Guy Sets And Earthing. 11 Erection Of Guy Set Including Excavation Of Pits &Refilling Of Earth As Per Standard Specification Withstay Clamps, Stay Wire, Anchor Rod, Turn Buckle, Eyebolt, Guy Insulator, Cement Concrete Block Etc. Butexcluding Concreting. 12 Concreting Of Poles, Guys, Etc. Including Cost Ofcement Sand Metal ( 1:2:4 ) And Water Etc. As Perstandard Specification. 13 Erection Of Coil / Plate Type Earthing Including Cost Of Coalsalt Etc. But Without Cost Of Gi Wire As Per Standardspecification 14 Erection Of Street Light Fixture Complete Withclamps, Brass Nipple, Brass Holder Teck Wood Bush, Reflectors Fuse, Wiring Etc. As Per Standardspecification But Excluding Cost Of Materials. 15 Stringing Of 30Mm2 Acsr / 34Mm2, 55Mm2 Aaacconductor For 11 / 22Kv & Lt Lines Including Fixing Ofinsulators, Binding Jumpering Etc. 16 Stringing Of Gi Wire 8 Swg Including Binding Jumperingetc. 17 Providing Single Phase Service Connection With Pvc2.5Mm Twin Core Cable From Terminal Pole Tometering Point Including Fixing Of Meter With Meterearthing Complete Work As Per Standard Specification But Excluding Cost Of Materials. 18 Providing Three Phase 4 Wire Service Connection Withpvc 4Mm2 / 10Mm2 Four Core Cable From Terminal Poleto Metering Point Including Fixing Of Meter Withmeter Earthing Complete Work As Per Standard Specification But Excluding Cost Of Materials. 19 Additional Cost For Excavation Of Pit In Hard Rockarea For Erection Of Pole / Guy Etc. As Per Standardspecification Over & Above Normal Cost Coveredagainst Excavation Of Pit Under Normal Soil Forerection Of Pole, Guy, Double Pole Structure Earthing With The Approval Of Supdt.Engineer. 20 Providing Guarding To Ht Line On Road / Rail Crossing. 21 Providing Guarding Of Lt Lines On Road / Rail Crossing. 22 Lt Line Tapping- Single Phase 23 Lt Line Tapping- Three Phase 24 Laying Of Overhead Lt Cable For Road Crossing, Ht Line Crossing And Telephone Line Crossing Etc. ( Per Span ) 25 Erection Of Single Pole Structures With, Hg Fuses, Transformers, Lighteningarrestor, Distribution Box. On 8 Meters 200 Kgand Psc Pole Including Excavation Of Pits And Refilling Of Earth, Carting Of Transformers From Stores To Site, Fixing Of Channels, Supporting Angles, Bracings Cross Arms Clamps, Anticlimbing Devicesdanger Boards, Conductor And Cable Wiring Etc.Complete And Painting Of Fabricated Materials Used On The Pole And Numbering With Cost Of Paint As Per Standard Specification But Excluding Erection Ofguy Sets And Earthing. 26 Erection Of Single Pole Structures With, Hg Fuses, Transformers, Lighteningarrestor, Distribution Box. On 9 To 11 Meters Rsj Pole Including Excavation Of Pits And Refilling Of Earth, Carting Of Transformers From Stores To Site, Fixing Of Channels, Supporting Angles, Bracings Cross Arms Clamps, Anticlimbing Devicesdanger Boards, Conductor And Cable Wiring Etc.Complete And Painting Of Fabricated Materials Used On The Pole And Numbering With Cost Of Paint As Per Standard Specification But Excluding Erection Ofguy Sets And Earthing. 27 Erection Of Single Pole Structures With, Hg Fuses, Transformers, Lighteningarrestor, Distribution Box On Existing 8 Meters 200 Kg Psc Pole Including Excavation Of Pits And Refilling Of Earth, Carting Of Transformers From Stores To Site, Fixing Of Channels, Supporting Angles, Bracings Cross Arms Clamps, Anticlimbing Devicesdanger Boards, Conductor And Cable Wiring Etc.Complete And Painting Of Fabricated Materials Used On The Pole And Numbering With Cost Of Paint As Per Standard Specification But Excluding Erection Ofguy Sets And Earthing. 28 Erection Of Single Pole Structures With , Hg Fuses, Transformers, Lighteningarrestor, Distribution Box On Existing 9 To 11 Meters Rsj Pole Including Excavation Of Pits And Refilling Of Earth, Carting Of Transformers From Stores To Site, Fixing Of Channels, Supporting Angles, Bracings Cross Arms Clamps, Anticlimbing Devicesdanger Boards, Conductor And Cable Wiring Etc.Complete And Painting Of Fabricated Materials Used On The Pole And Numbering With Cost Of Paint As Per Standard Specification But Excluding Erection Ofguy Sets And Earthing. 29 Erection Of Psc Poles Of 10 Mt. / 270 Kg Includingexcavation Of Pit And Refilling Of Earth, Fixing Ofcross Arms, Top Fitting Clamps Anti-Climbing Devices, Insulators Etc. Complete And Painting Of Fabricatedmaterials Used On The Poles And Numbering With Cost Of Paint As Per Standard Specification But Excluding Erection Of Guy Set And Earthing. 30 Erection Of Double Pole Structure Of 10 Meters 270 Kgpsc Poles Including Excavation Of Pits & Refilling Ofearthing, Fixing Of Channels, Supporting Angles, Clamps, Anti-Climbing Devices Danger Boards, Insulators Etc.Complete And Painting Of Fabricated Materials Used On The Poles And Numbering With Cost Of Paint As Per Standard Specification But Excludingerection Of Guy Sets And Earthing. 31 Stringing Of 100Mm2 Acsr / 100Mm2 Aaac Conductor For 11 / 22Kv & Lt Lines Including Fixing Ofinsulators, Binding Jumpering Etc. 32 Stringing Of Abc Of Following Sizes Including Fitting Of All Accessories I.E. Special Design Suspensiion / Tension Clamp. Fixing Of Crossarm, Lt Shackle Insulator, & Directed By Engineer-In-Charge. ( I ) 3X50mm2+16Mm2+1X35mm2 ( Ii ) 3X50mm2+16Mm2+1X25mm2 33 Stringing Of Abc Of Following Sizes Including Fitting Of All Accessories I.E. Special Design Suspensiion / Tension Clamp. Fixing Of Cross Arm, Lt Shackle Insulator, Etc. For Fixing Of Messenger Wire Complete, As Required & Directed By Engineer-In-Charge. ( I ) 1X35mm2 + 1X25mm2 34 Stringing Of 11Kv Abc Of Following Sizes In Rural / Urban Area Including Fixing Of Cross Arm, Sspecial Design Suspension / Tension Clamp, Binding To Pin Insulator, Preparing Shckle Point Jumpers Etc. As Required And Directed By Engineer-In-Charge. ( I ) 3X95mm2+1X80mm2 ( Ii ) 3X70mm2 + 1X70mm2 35 Erection Of Double Pole Structures With Mounting Ofab Switch, Hg Fuses, Transformers, Lighteningarrestors, Distribution Box Of 10 Meters 270 Kg And Psc Poles Including Excavation Of Pits And Refilling Of Earth, Carting Of Transformers Fromstores To Site, Fixing Of Channels, Supporting Angles, Bracings Cross Arms Clamps, Anticlimbing Devicesdanger Boards, Conductor And Cable Wiring Etc.Complete And Painting Of Fabricated Materials Usedon The Poles And Numbering With Cost Of Paint As Per Standard Specification But Excluding Erection Ofguy Sets And Earthing.