Tender For Fabrication And Erection Work- Replacement Of 2 X 2 Square Bar ( Rail ) On Cane Unloader. Removal Of Old Juice Gutter Of Mill, Installation Of New One And Successful Trial Give . Mills Old M.S. Extraction Of Juice Tray And M.S. New From The Plate Placement . Making And Installing New Gear Guard In Mill House., Welding The Cut Teeth Of Mill Pinion As Required And Smoothen With Grinder., Damaged / Worn Part Of Tail War Coupling By Baling As Required., Repair And Grind, Repair Of Damaged / Worn Part Of Tail War By Sanding As Required., Tax Grind D.S. M. Repairing The Screen Completely, Cutting Out The Corroded Part, Making New Fit And Fixing All The Pipes Inside., Giving A Successful Trial., The Slats Of The Can Carrier Are Fully Equipped With Links, Pins, Rollers, Bushings. Cleaning And Greasing And Fitting The Said Equipment In Place In The Slate., Thorough Cleaning And Greasing Of Primary / Secondary Can Carrier Chains Slats, Links, Pin Bush And Rollers And Tying Chain Spares As Per Instructions. Making The Chain, Making And Fixing Juice Ring For Roller., Making And Fitting Mill Bearing Guard From 3 Mm Plate., M.S. For Under Feed Roller Make A Scraper And Apply It., Cutting Chevron Eaves As Required In Old Mill Roller. Cut Chevron Grooves In The New Mill Roller As Required. Makes Dots On The Top And Feed Rollers Of The Mill With The Arcing Electrode As Per Instructions. In Place Of The Worn Teeth Of The Under Feed Rollers. S. Fixing Of New Teeth By Cutting Off The Teeth From The Plate. Arcing By Electrodes As Directed On The Grooves Of The Rollers Used In Mills. Doing. Making Side Juice Guide For Mill Rollers From 3 Mm Plate As Per Instructions. Making Under Feed Roller For Mill As Per Drawing. Dismantling Of Damaged / Damaged Juice Tank Of Mill House, Making And Installing A New Tech In Its Place And Giving A Trial. Replacement / Repair Of Damaged / Defective Part Of Juice Tank Of Mill House. Dismantling And Replacement Of Damaged / Defective Juice Tank Bottom Plate Of Mill House. Cane Carrier / Bangas Carrier / Bagas Elevator / Cross Bagas Carrier / R. B. Removal Of Street Side Plate Of C. And Fixing Of New Plate. Enlarged Holes Of The Links Of Cane Carrier / Bangas Carrier Etc. To The Size Of The Pin According To Welding Or Forging. Cane Carrier / Inter Carrier / Bagasse Elevator / Return Bagasse Carrier / Cross Removal Of Broken Runners Of Bagasse Carrier And New Runner In Place Placement Replacement Of Old Damaged Cane Carrier Slats And Fixing Of New Slats. The Work Of Making Holes In The New Slates Of Cane Carrier / Inter Carrier. Repairs Cane Carrier Slats By Straightening Them As Required. Page 2 Removal Of Old Damaged Slats Of Cane Carrier And Straightening Of Damaged Slats, Removal Of Damaged Part Of Slats And According To The Size Of The Pieces Of New / Old Slats Cut And Repaired By Balding To Size. T Damaged And Weak Hoods Of Cane Chopper, Cutter And Fiberizer As Directed Repair. Preparing Slates Accordingly., Balding The Enlarged Holes Of The Inter Carrier Links And Riveting Sizing By Drilling According To Size., Filling Of Enlarged Holes Of Old Slate Of Inter Carrier By Balding And Make New Holes By Re-Drilling As Per Drawing., Removing The Damaged Band Of The Inner Carrier Clutch Shaft And Making A New One Installation And Giving Satisfactory Trial. Removing The Damaged Juice Gasification Tray On The Mill And Installing A New One., Fitting Oil Tray For Mill Crown Pinion., M / S. New Ds From The Plate M. Fabrication As Per Screen Drawing, Fitting Of New Mesh, Fitting Of Required Pipe Nipples Etc. And Completed., New Screw Conveyor Pipeline For Juice Mill House As Per Drawing And Making And Applying From The Plate And Giving A Trial By Running It., New Fabrication Of Trough Of Screw Conveyor Of Bangas As Per Drawing., Making New Comb Of Bagasse Carrier / Elevator As Per Requirement. Bagas Elevator / R. B. Cutting Out The Weak And Sore Trough Of C. / Cross Carrier And Repairing It By Applying New Plate Of 8 / 10 Mm., Removing Old Bagasse Suit And Repairing It. Making A New Damper On The Boiler From 5 Mm New / Old Plate And Give A Satisfactory Trial. New Plate For Bad Acting Of Id Fan Of Boiler And Fly Ash Arrester., To Fit. Damaged Ms Of Top Roof Of Boilers. / C.I.K, Replacement Of Joint / Channel / Guard. Removal Of Old Fly Ash Arrester Nets And New Ones As Required Making Nets, I.D. Fan Impeller As Per Drawing For Boiler / Fly Ash Arrester Making, Fitting And Giving Successful Trials. Making And Fitting Casing For Economizer Installed On Boiler And Giving Successful Trials., R. Removal Of Damaged Rack And Pinion Type Sliding Gate Fitted In V.C. And Replacement And Satisfactory Trial., Making Air Heater Tubes By Welding, Cleaning Etc. From Old Boiler Tubes. Removal Of Leaky Tubes Of Air Heater Of Boiler And New Air As Per Instructions. Page 3 Fitting And Expanding Heater Tubes. Most Of The Tubes Of The Air Heater Of The Boiler Have Come Out, Cutting Them And Re-Expanding The Tubes. Repair Of Damaged Dynistor Fitted In Boiler Drum. Modification Of I.D. Fans Hood As Per Drawing. Fd The Casing Of The Fan Was Supplied To M.S. Fabrication / Repair As Per Drawing From Plate Doing.,