Tender For Extension Of Fiac Oupada--- 1 Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead per 1 cum. 2 Ground Floor 3 First Floor 4 Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead per 1 sqm 5 Ground Floor 6 First Floor 7 Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead per 1 sqm 8 Ground Floor 9 First Floor 10 Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead per 1 cum 11 Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead per 1 cum 12 Ground Floor 13 First Floor 14 Dismantling and removing R.C.C. Chajja, Shelves, fins and parapet including stacking the useful materials for reuse and removing the debris within 50m lead per 1 sqm 15 Ground Floor 16 First Floor 17 Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead per 1 sqm 18 Earthwork in excavation in foundationandplinth inhard soilwithininitiallead andlift including rough dressing and leveling the bed and removing the debris within 50m. lead etc. all complete. 19 Filling foundation and plinth with clean riversandwith watering and curing including cost, conveyance, royalty and taxes of all materials and labour etc. complete. 20 Providing cement concrete (1:3:6) using 4cm size h.g.c.b. metal including cost, conveyance, royalty and taxes of all materials and labour etc. complete. 21 R.C.C. work M-20 grade using 20mm.and down grade HBG crusher broken chips including hoisting,laying, cost,conveyance and royality of materials curing etc. completeas per direction of Engg-in-Charge . 22 Ground Floor 23 A.Pile cap 24 B.Grade Beam 25 C.Lintel 26 D.Column 27 E. Wall beam 28 F. Chajja 29 G.Roof slab 30 First Floor 31 A.Lintel 32 B.Column 33 C. Wall beam 34 D. Chajja 35 E.Roof slab 36 Cutting, bending, binding andtyingthegrillsandplacing in position including the cost of labour and M.S. rod withbinding wire of 18 to 20 gauge. 37 Ground Floor 38 First Floor 39 Fly Ash Brick Work having crushing strength 75 kg/sq.cm in c.m. 1:6 in super structure including cost conveyance and royality of materials curing etc. complete as per direction of Engg-in-Charge . 40 Ground Floor 41 First Floor 42 12mm thick cement plaster in cement mortar (1:6) to the outside surface of the wall including wateringandcuring with cost, conveyance, royalty and taxes of all material& labour etc. complete. 43 Ground Floor 44 First Floor 45 Outside 46 Inside 47 6mm thick cement plaster in cement mortar (1:4) for RCC work after closed deep chippingincludingcost, conveyance, royalty and taxes ofallmaterialsand labour etc. all complete. 48 Ground Floor 49 First Floor 50 12mm thick cement plaster (1 : 4) over brick work with cement punning for skirting per 1 Sqm. 51 Finishing wall surface of walls with Acrylic wall putty (Water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes, labour T & P etc. complete as per direction of Engg-in-Charge . 52 Ground Floor 53 First Floor 54 Primimg one coat with any approved primer over wall surface including cost of primer. 55 Ground Floor 56 First Floor 57 Outside 58 Inside 59 Finishing interior walls with 2 coats of plastic emulsion paint of approved shade on new work to give an even shade exculding cost of paint. 60 Ground Floor 61 First Floor 62 Finishing exterior walls with weather coat of approved shade two coats on new work to give an even shade including cost of paint. 63 Ground Floor 64 First Floor 65 Iron work wrought and put up in grated doors, windows and cage latrines per 1 Qntl. 66 Painting two coats over a coat of red oxide primer with synthetic enamel paints including cost of all labour and materials the cost of primer and paint. 67 Fixing of Vitrified tiles in floors, treads or steps and landing of steps on 20mm thick cement plaster in mortar (1:4) joined with neat cement slurry mixed with pigments to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles. 68 Ground Floor 69 First Floor 70 Fixing of ceramic tiles in dado, skirting and risers of steps on 12mm thick cement plaster in mortar (1:3) joined with neat cement slurry mixed with pigments to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles per 1 sqm. 71 Ground Floor 72 First Floor 73 Fixing industrial Chequred tiles in floors,treads or steps and landings on 25 mm thick CM (1:1) jointed with neat cement slurry mixed with pigments to match the shades includind cost for rubbing, polishing & cost of marbel tiles etc. completeas per direction of Engg-in-Charge . 74 Supplying, fitting, fixing up window (sliding type) made up of uPVC section 151-154, 151-155 as window frame section; No 151- 155, 151-153, and 151-167 as shutter frame with 5 mm thick black glass as panel fitted with rubber bending including locking arrangement and all fittings including cost of all materials, taxes, labour, T&P complete. Data for 1.49 sqm 75 Ground Floor 76 Supplying, fitting and fixing of stainless steel of 304 grade collapsible gate/Window grill/Ventilator etc made out of stainless steel square bar / stainless steelflats / stainless steel angles as per approved drawing and design, cutting to required size and welding properly, finished smooth and sand papering, including cost, conveyance, taxes of all materials, required screws, cost of all labour, T&P etc. asrequired for the work complete as per direction in all floors. 77 Ground Floor 78 First Floor 79 Providing fitting, fixing of Al. door with OEL anodized Al. door section of 9202 as vertical member, 9201 as top member and 9200 as bottom and middle member and 12mm thick pre-laminated board fixed on door frame by means of tapered clip No. 4660 and the frame to be completed by means of jointing angle No. 1855 including all cost of labour, T&P , hire charges of drilling machine, labour charges etc. complete. 80 PH and Electrical Works (LS)