Mechanical And Electrical Works On Hydromechanical Equipments At Okhla Barrage, Okhla-New Delhi Under Annual Maintenance. - 1 Okhla Barrage, GATE SIZE : 18.30 X 6.00 = 22 Nos. & 18.30 X 5.10 = 5 Nos. 2 Greasing, oiling of all components of lifting mechanism of gate (excluding rollers) after proper cleaning with replacing grease cup/grease nipple as required including cost of all material, labour, T&P etc required for proper completion of work from gate no. 1 to 27. 3 Applying cardium compound on steel wire rope, rope drum of gate after proper cleaning including cost of all material, labour, T&P and scaffolding with safety arrangement required for proper completion of work from gate no. 1 to 27. 4 Replacing, filling gear oil inreduction gear unit after proper cleaning including cost of all material, labour, T&P etc required for proper completion of work from gate no. 1 to 27. 5 Replacing broken/ missing/damaged bolt, nut of hydro mechanical equipment after proper checking of bolt, nut including cost of all material, labour, T&P etc required for proper completion of work from gate no. 1 to 27. 6 Supplying and fixing of Auto Reverses Starter 7.5HP, 3 Phase. 415-V after dismantling, fitting and testing including cost of all material, labour, T&P etc required for proper completion of work. 7 Supplying and fixing of T.P. switch 32 amp 415V, 3 phase after dismantling, fitting and testing including all cost of all material, labour, T&P etc for proper completion of work. 8 Rectifying defective alignment of gate by adjusting length of steel wire rope and other allied work as required including cost of all material, labour, T&P, jigs and fixtures, scaffolding etc as required for proper completion of work. 9 Okhla Barrage Head Regulator, GATE SIZE: 7.80x3.15 m = 09 Nos. 10 Greasing, oiling of all components of lifting mechanism of Gate (excluding rollers) after proper cleaning with replacing grease cup/grease nipple as required including cost of all material, labour, T&P etc required for proper completion of work from gate no. 1 to 9. 11 Applying cardium compound on steel wire rope, rope drum of gate after proper cleaning including cost of all material, labour, T&P and scaffolding with safety arrangement required for proper completion of work from gate no. 1 to 9. 12 Replacing, filling gear oil in radicon reduction unit after proper cleaning including cost of all material, labour, T&P etc required for proper completion of work from gate no. 1 to 9. 13 Replacing broken/ missing/damaged bolt, nut of hydro mechanical equipment after proper checking of bolt, nut including cost of all material, labour, T&P etc required for proper completion of work from gate no. 1 to 9.