}

Tender For E- Quotation For Annual Repair Maintenance Estimate Of Adityapur Water Supply Scheme., jamshedpur-Jharkhand

Drinking Water And Sanitation Department has published Tender For E- Quotation For Annual Repair Maintenance Estimate Of Adityapur Water Supply Scheme.. Submission Date for this Tender is 20-05-2023. Water Supply Project Tenders in jamshedpur Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

37658923
Tender For E- Quotation For Annual Repair Maintenance Estimate Of Adityapur Water Supply Scheme.
Open Tender
NCB
Jharkhand
Jamshedpur
20-05-2023

Tender Details

Tender For E- Quotation For Annual Repair Maintenance Estimate Of Adityapur Water Supply Scheme.- 1 A) 1ST PHASE RAW WATER SITARAMPUR P/P. ( 60 H.P.V.T P/Set - 3 Nos)Repairing of 60 H.P,V.T pump dismantlingbowl assembly as per required along with loading, unloading & transportation charge all complete. 2 Cost towardsrewinding of 60 H.P.V.T Motor with suitable copper wire (32 Kgs) and replacing of spare materials like bearing nut bolts as per required with loading, unloadingtransportation charge all complete. 3 Cost towards supplying and fitting thrust bearing SKF 7320 and 6311 - 2z for 60 H.P.V.T Motor and proper greass etc. all complete 4 Cost towardsSupplying making & fitting S.S line shaft size 56 mm x 72 long ofN - 304 materials, G.M impeller for 3 stage 60 H.P.V.T pump as per size and sample, G.M bush, S.S line shaft , 8 dia M.S Spider bearing with rubber cut less bush etc. all complete 5 Cost towardsrepairing & rewinding of 315 1/0.4 KV Step down Transformer with Suitable Size DPC Copper wire (14.7 Kg. per Coil) Varnishing with best Quality Air drying Vanish heating and repairing all required joints including the cost of all required materials Such as DPC Copper wire, Varnishing insulating, stud, transformer Oilmaterials, rubberized Corrugated Sheet nuts, bolts, washer etc. and doing internal wiring Properly with all labour 6 Cost towards repairing and overhaulingof 400 A OCB make MEI taking out damaged spare parts then replacing with all complete 7 Cost towards repairing and over hauling of 3 Tonne chain pulley block, taken out its damaged spare parts then replacementby new one like chain pulley block, stud nuts & bolts and gear all complete. 8 Cost towards repairing of panel board replace by new one like MCCB,Cable, Socket,washer, Nuts & bolts, Amp. Meter, Volt Meter etc all complete. 9 Cost towardsrepairingof 8 dia N.R Valve, sluice Valve,suction pipe, bend, Hydertaking out damaged spare partslike nut bolts, spindle, washer etcthen fitting by new one including the cost of machining turning & finishing all complete. 10 Cost towards Supplying and Laying 25 mm² x 3Core PVC insulated Copper cable 1.1 KV grade with ISI Mark 11 Cost towardsrepairing & rewinding of 150 KVA1/0.4 KV Step down Transformer with Suitable Size DPC Copper wire (14.7 Kg. per Coil) Varnishing with best Quality Air drying Vanish heating and repairing all required joints including the cost of all required materials Such as DPC Copper wire, Varnishing insulating, stud, transformer Oilmaterials, rubberized Corrugated Sheet nuts, bolts, washer etc. and doing internal wiring Properly with all labour 12 (B) 2ND PHASE RAW WATER SITARAMPUR P/P. ( 100 H.P C/F Pump set - 2 Nos and 90 H.P C/F Pump set - 1 No. ) Dismantling of 90 H.P - 1 Set and100 H.P - 2 Sets Centrifugal Pump and taken out damaged impeller etc. all Complete 13 Cost towardsrepairing and rewinding of 90 H.P.Vand 100H.P Sq. Cage induction motor 3 Phase, 50 Cycles 1440 RPM 415 ± 10% Volts with Super enameled Copper wire (34 Kgs) and replacing of spare materials like bearing nut bolts as per required with loading, unloadingtransportation charge all complete. 14 Cost towardsSupplying and fitting SKF N – 316 Roller bearing (forD.E& NDE Side of the motor)and 6318-C& 6309 Ball bearing for DE & DE side of the pumpgrease, jute etc all complete 15 Cost towardsrepairing and overhaulingof 630 A VCB make ABB, taking out damaged spare parts then replacing by new one like Ratchet assembly, flush mounting type triple pole, fixed contact, moving contact,Arc shield motor and mountingtype of relay etc. all complete. 16 Cost towardsrepairingof 6 dia N.R Valve, sluice Valve, 8 dia foot valve,suction pipe, bend, Hydertaking out damaged spare partslike nut bolts, spindle, washer etcthen fitting by new one including the cost of machining turning & finishing all complete. 17 Cost towards repairing of G.M Shaft bush, Neck ring,G.M Impeller, Tyre Coupling set, Gland Tightnerbearing housing for Proper Size making and machining and finishing for proper bearing fitting. 18 Cost towards repairing & rewinding of 315 KVA1/0.4 KV Step down Transformerreplacing burnt coil studs, transformer oil (300 lits.) insulator, lightening Arrestor, with loading, unloading& transportation charge all complete. 19 Cost towardsrepairing of FASD Starter 2 Nos Oil immersed Star Delta Starter - 1 No. replacing conductor, relay, timerand suitable contact finger. 20 Cost towards repairing and over hauling of 3 Tonne chain pulley block, taken out its damaged spare parts then replacementby new one like chain pulley, stud nuts & bolts and gear all complete. 21 Cost towards repairing of panel board replace by new one like MCCB,Cable, Socket,washer, Nuts & bolts, Amp. Meter, Volt Meter etc all complete. 22 Cost towards Supplying and Laying 35 mm² x 3Core PVC insulated Copper cable 1.1 KV grade with ISI Mark 23 (C) 1ST PHASE CLEAR WATER SITARAMPUR P/P. (125 H.P C/F Pump set - 1 No,120 H.P C/F Pump set - 1 No. 100 H.P C/F Pump set - 2 Nos and 90 H.P C/F Pump set - 1 No. ) Dismantling of the 125 H.P, 100 H.P - 2 Sets, 120 H.P, 90 H.Pinduction motorfrom discharge headand taken out rotor from Stator etc. all Complete 24 Cost towardsrewinding of 125 H.P, 100 H.P - 2 Sets, 120 H.P, 90 H.PinductionMotor with suitable copper wire (36+ 34+34+ 34+32) Kgs) and replacing of spare materials like bearing nut bolts as per required with loading, unloadingtransportation charge all complete 25 Cost towardsrepairingof 6 dia N.R Valve, sluice Valve, 6 dia foot valve,suction pipe, bend, Hydertaking out damaged spare partslike nut bolts, spindle, washer etcthen fitting by new one including the cost of machining turning & finishing all complete. 26 Cost towardsSupplying and fitting SKF N – 316 Roller bearing (forD.E& NDE Side of the motor)and 6318 - C & 6309 Ball bearing, for DE & DE side of the pumpgrease, jute etc all complete 27 Cost towardsrepairing of G.M Shaft bush,Neck ring,G.M Impeller, Tyre Coupling set, Gland Titner,bearing housing for Proper Size making and machining and finishing for proper bearing fitting. 28 Cost towardsrepairing & rewinding of 315 KVA1/0.4 KV Step down Transformerreplacing burnt coil studs, transformer oil (300 lits.) insulator, lightening Arrestor, with loading, unloading& transportation charge all complete. 29 Cost towardsrepairing and overhaulingof 630 A VCB make ABB taking out damaged spare parts then replacing by new one like Ratchet assembly, flush mounting type triple pole, fixed contact, moving contact,Arc shield motor and mountingtype of relay etc. all complete. 30 Cost towardsrepairing of FASD Starter 3 Nos Oil immersed Star Delta Starter - 2 No. replacing conductor, relay. timerand suitable contact finger 31 Cost towards repairing and over hauling of 3 Tonne chain pulley block, taken out its damaged spare parts then replacementby new one like chain pulley, stud nuts & bolts and gear all complete. 32 Cost towardsrepairing and overhaulingof 400 A OCB make MEI, taking out damaged spare parts then replacing with all complete 33 Cost towards repairing of panel board replace by new one like MCCB,Cable, Socket,washer, Nuts & bolts, Amp. Meter, Volt Meter etc all complete. 34 Cost towards S/F 90mm² x 3 Core Copper Cable with ISI mark. 35 (D) 2ND PHASE CLEAR WATER SITARAMPUR P/P. ( 100 H.P C/F Pump set - 3 Nos )Dismantling of100 H.PCentrifugal Pump and taken out damaged impeller etc. all Complete 36 Cost towardsrepairing and rewinding of 100H.P Sq. Cage induction motor 3 Phase, 50 Cycles 1440 RPM 415 ± 10% Volts with Super enameled Copper wire (34 Kgs x 3) and replacing of spare materials like bearing nut bolts as per required with loading, unloadingtransportation charge all complete. 37 Cost towardsSupplying and fitting SKF N – 316 Roller bearing (forD.E& NDE Side of the motor)and 6309 & 6318- CBall bearingfor DE & DE side of the pumpgrease, jute etc all complete 38 Cost towardsrepairingof 6 dia N.R Valve, sluice Valve, 6 dia foot valve,suction pipe, bend, Hydertaking out damaged spare partslike nut bolts, spindle, washer etcthen fitting by new one including the cost of machining turning & finishing all complete. 39 Cost towardsrepairing of G.M Shaft bush, . neck ring,G.M Impeller, Tyre Coupling set, Gland Titner,bearing housing for Proper Size making and machining and finishing for proper bearing fitting. 40 Cost towardsrepairing & rewinding of 250 KVA1/0.4 KV Step down Transformerreplacing burnt coil studs, transformer oil (300 lits.) insulator, lightening Arrestor, with loading, unloading& transportation charge all complete. 41 Cost towardsrepairing and overhaulingof 630 A VCB make ABB, taking out damaged spare parts then replacing by new one like Ratchet assembly, flush mounting type triple pole, fixed contact, moving contact,Arc shield motor and mountingtype of relay etc. all complete. 42 Cost towardsrepairing of FASD Starter 2 Nos Oil immersed Star Delta Starter - 1 No. replacing conductor, relay and suitable contact finger 43 Cost towards repairing and over hauling of 3 Tonne chain pulley block, taken out its damaged spare parts then replacementby new one like chain pulley, stud nuts & bolts and gear all complete. 44 Cost towards repairing of panel board replace by new one like MCCB, Cable, Socket,washer, Nuts & bolts, Amp. Meter, Volt Meter etc all complete. 45 Cost towards Supplying and Laying 300 mm² x 3½Core PVC insulated Armored Aluminum cable 1.1 KV grade with ISI Mark 46 (E)BHUA RAW WATER P/P. (125 H.P.V.T Pump set - 3 Nos ) Repairing of 125 H.P,V.T - 3 Setsreplacing bowl assembly as per required along with loading, unloading & transportation charge all complete. 47 Cost towardsrewinding of 125 H.P.V.T Motor with suitable copper wire (42 Kgs) and replacing of spare materials like bearing nut bolts as per required with loading, unloadingtransportation charge all complete. 48 Cost towardssupplying and fitting thrust bearing SKF 7320 for 60 H.P.V.T Motor and proper greases etc. all complete 49 Cost towardsrepairing & rewinding of 315 KVA1/0.4 KV Step down Transformerreplacing burnt coil studs, transformer oil (300 lits.) insulator, lightening Arrestor, with loading, unloading& transportation charge all complete. 50 Cost towardsrepairing and overhaulingof 630 A VCB make ABB, taking out damaged spare parts then replacementby new one like Ratchet assembly, flush mounting type triple pole, fixed contact, moving contact,Arc shield motor and mountingtype of relay etc. all complete. 51 Cost towards repairing and over hauling of 3 Tonne chain pulley block, taken out its damaged spare parts then replacementby new one like chain, stud nuts & bolts and gear all complete. 52 Cost towardsMakingraw materials andsupplying and fittingS.S line shaft size 56 mm x 72 long ofN - 304 materials, G.M impeller for 3 stage 60 H.P.V.T pump as per size and sample, G.M bush, S.S line shaft , 8 dia M.S Spider bearing with rubber cut less bush etc. all complete 53 Cost towardsrepairingof 8 dia N.R Valve, sluice Valve,suction pipe, bend, Hydertaking out damaged spare partslike nut bolts, spindle, washer etcthen fitting by new one including the cost of machining turning & finishing all complete. 54 Cost towards repairing of panel board replace by new one like MCCB, Cable, Socket,washer, Nuts & bolts, Amp. Meter, Volt Meter etc all complete. 55 (F) GAMHARIA PANI TANKI P/P, ( 40 H.P C/F Pump set - 2 Nos ) Dismantling of the 40 H.P - 2 Sets, induction motorfrom foundation headand taken out rotor from Stator etc. all Complete 56 Cost towardsrewinding of40 H.P - 2 Sets,inductionMotor with suitable copper wire (24 x 2 Kgs) and replacing of spare materials like bearing nut bolts as per required with loading, unloadingtransportation charge all complete 57 Cost towardsrepairingof 4 dia N.R Valve, sluice Valve, 6 dia foot valve,suction pipe, bend, Hydertaking out damaged spare partslike nut bolts, spindle, washer etcthen fitting by new one including the cost of machining turning & finishing all complete. 58 Cost towardsrepairing and replacement of G.M Shaft bush,neck ring,G.M Impeller, Tyre Coupling set, Gland Tightner, bearing housing for Proper Size making and machining and finishing for proper bearing fitting. 59 Cost towardsSupplying and fitting SKF 6306 ball bearing (forD.E& NDE Side of the motor)and Ball bearing, greases, jute etc all complete 60 Cost towards repairing and over hauling of 2 Tonne chain pulley block, taken out its damaged spare parts then replacementby new one like chain pulley, stud nuts & bolts and gear all complete. 61 Cost towardsrepairing of FASD Starter 2 Nos replacing conductor, relay and suitable contact finger 62 Cost towards repairing of panel board replace by new one like MCCB, Cable, Socket,washer, Nuts & bolts, Amp. Meter, Volt Meter etc all complete. 63 (G) S/F consumable materials like grease, gland packing, jute, diesel etc. with replacing lighting equipments like bulb, holder, fuse wire human safety equipments like safety shoes, safety gloves, goggles, Aparanmats etc. all complete ( For 1st & 2nd Phase C/W and 1st & 2nd Phase R/W)

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail