|
| 1 | Launching of Baily Bridge by way of steel work rivetted or bolted in builtup sections, trusses, frameed work,b.w.o. launching of panels, panel-pins, transoms, transom clamps, chord reinforcement, chord bolt(L/S), Base plate, Bearing, Side deck (L/S), Centre deck (L/S), End deck (L/S), HD bolts, Sway Brace, End post (M/F) Bracking bolt, Bracing Frame, Racker, Tie Plate,Roller etc. gears/ tools/ tackles etc or any other tools, safety gadgets and other machinery which ever required (excl cost of components) using cranes, hydra, skilled labour. |
| 2 | Delaunching of Baily Bridge by way of steel work rivetted or bolted in builtup sections, trusses, framemed work,b.w.o. Delaunching of panels, panel-pins, transoms, transom clamps, chord reinforcement, chord bolt(L/S), Base plate, Bearing, Side deck (L/S), Centre deck (L/S), End deck (L/S), HD bolts, Sway Brace, End post (M/F) Bracking bolt, Bracing Frame, Racker, Tie Plate,Roller etc. gears/ tools/ tackles etc or any other tools, safety gadgets and other machinery which ever required (excl cost of components) using cranes, hydra, skilled labour. |
| 3 | Launching/De-launching of nosing by way of removing pannels , pannel pins , transom, transom clamps, sway braces, rackers , bracing bolts including stacking using cranes hydra and skilled labour |
| 4 | Repair/restoration of bailey bridge b.w.o launching ofpanels, panel-pins, transoms, transom clamps, chord reinforcement, chord bolt(L/S), Base plate, Bearing, Side deck (L/S), Centre deck (L/S), End deck (L/S), HD bolts, Sway Brace, End post (M/F) Bracing bolt, Bracing Frame, Racker, Tie Plate,Rolleretcusing hydra cranes, hydra, skilled labour. |
| 5 | Repair/restoration of bailey bridge b.w.o de-launching ofpanels, panel-pins, transoms, transom clamps, chord reinforcement, chord bolt(L/S), Base plate, Bearing, Side deck (L/S), Centre deck (L/S), End deck (L/S), HD bolts, Sway Brace, End post (M/F) Bracing bolt, Bracing Frame, Racker, Tie Plate,Rolleretcusing hydra cranes, hydra, skilled labour. |
| 6 | Carriage of materials from divisional store zewan to site of work and left over components back to divisional store including return of damaged components of bailey bridge to zewan store. |
| 7 | Upto 5 Km |
| 8 | Upto 10 Km |
| 9 | Upto 20 Km |
| 10 | Beyond 20 Km / additional Km |
| 11 | Loading & unloading of bailey bridge componentsusing hydraulic crane & labour. |
| 12 | Engagement of JCB to remove land slides and to make road even for launching / de-launching. |
| 13 | Engagement of black smith for cleaning of rusted nuts and bolts including cost of cutting MS steel and other materials b.w.o mechanical cutter and gas wellding. |
| 14 | Wellding/cutting charges for fixing of MS steel welded in builtup section including mechanical carriege hire cherges of generator, its feul cost ,electrode and labour |
| 15 | Supply and fixing of retroreflactive sign board made on 4mm thick aluminium composite pannel coverred with high intensity prismatic reflective sheet confirming to type IV of ASTMD -4956. The white high intensity prismatic sheet should be printed for the approved design and all types of carriage /head load upto site of work. |