Supplying Road Materials ( Metal, Kapchi, Grit, Etc. ) Different Road Of Navsari Taluka Panchayat ( R&B ) Sub Division Navsari Ta-Navsari, Di-Navsari- Suppling Stacking, & Spreading Stone Of Hand Broken 25Mm. To 90Mm Of Approved Qulity On Road Site Directed., Suppling Stacking, & Spreading Stone Of Hand Broken 40Mm. To 63Mm Of Approved Qulity On Road Site Directed., Suppling Stacking, & Spreading Stone Of Machine Cut 45Mm. To 90Mm Of Approved Qulity On Road Site Directed., Suppling Stacking, & Spreading Stone Of Machine Cut 40Mm. To 63Mm Of Approved Qulity On Road Site Directed., Suppling Stacking, & Spreading Approved Quality Machine Cut Stone Aggregate Size 10Mm. To 20Mm M / C Metal., Suppling Stacking, & Spreading 25 Mm.To 40 Mm M / C Metal, Suppling Stacking, & Spreading 25 Mm M / C Stone Aggregate, Suppling Stacking, & Spreading 20 Mm M / C Stone Aggregate, Suppling Stacking, & Spreading 12 Mm M / C Stone Aggregate, Suppling Stacking, & Spreading 10 Mm M / C Stone Aggregate, Suppling Stacking, & Spreading 6 Mm M / C Stone Aggregate, Suppling Stacking, & Spreading 50 To 150Mm Hard Murrum On Road Side As Directed., Suppling Stacking, & Spreading Sand On Road Side As Directed., Suppling Stacking, & Spreading Stone Dust On Road Side As Directed., Suppling Stacking, & Spreading Yellow Earth Soil On Road Side As Directed., Suppling Stacking, & Spreading Rubble On Road Side As Directed., Suppling Stacking, & Spreading Unscreen Gravel On Road Side As Directed., Suppling Stacking, & Spreading Quarry Spoil On Road Side As Directed., Suppling Stacking, & Spreading Coarse Clean Sharp Sand For Road Filling Side As Directed., Providing, Laying & Rolling Of Built-Up Spray Grout In One Layer Using Bitumen Grade Vg- 10 Tack Coat At The Rate Of 2.5 Kg. / 10 Sqm. With Spreading Stone Aggregate At The Rate Of 0.50 Cum. / 10 Sqm. And Spraying Bitumen At The Rate Of 15 Kg. / 10 Sqm. And Spreading 0.13 Cum. / 10 Sqm. Of Key Aggregate On Top, In Accordance With The Requirement Of Specification, Including Cost Of Stone Aggregate, Bitumen, Consolidation With Vibratory Roller, Necessary Firewood, Oil, Lubricants, Labour Charges, Machineries, Equipment, Tools Etc. Complete., Providing, Laying & Rolling Of Built-Up Spray Grout In Two Layer Using Bitumen Grade Vg 10 Tack Coat At The Rate Of 4.00 Kg. / 10 Sqm. With Spreading Stone Aggregate At The Rate Of 0.50 Cum. / 10 Sqm. And Spraying Bitumen At The Rate Of 15 Kg. / 10 Sqm For First Layer Than Spreading Stone Aggregateat The Rate Of 0.50 Cum. / 10 Sqm. And Spraying Bitumen At The Rate Of 15 Kg. / 10 Sqm For Second Layer And Spreading 0.13 Cum. / 10 Sqm. Of Key Aggregate On Top, In Accordance With The Requirement Of Specification, Including Cost Of Stone Aggregate, Bitumen, Consolidation With Vibratory Roller, Necessary Firewood, Oil, Lubricants, Labour Charges, Machineries, Equipment, Tolls Etc. Complete., Providing Jcb With Fuel & Operator Charges, Providing Hydrolic Dumper With Fuel, Driver & Cleaner Charges., Providing Hydrolic Tractor With Trolly Including Fuel, Driver & Cleaner Charges., Providing Power Roller 8 To 10 Tone Capacity Including Fuel & Driver Charges., Providing Vibrating Roller 8 To 10 Tone Capacity Including Fuel & Driver Charges., Providing Water Tanker 5000 Ltr. Capacity Including Fuel & Driver Charges., Providing Water Tanker 1000 Ltr. Capacity Including Fuel & Driver Charges., Suppling & Stacking Np-2 Hume Pipe 300 Mm.Dia. ( All Lead And Lift ) , Suppling & Stacking Np-2 Hume Pipe 450 Mm.Dia. ( All Lead And Lift ) , Suppling & Stacking Np-2 Hume Pipe 600 Mm.Dia. ( All Lead And Lift ) , Suppling & Stacking Np-2 Hume Pipe 900 Mm.Dia. ( All Lead And Lift ) , Suppling & Stacking Np-3 Hume Pipe 600 Mm.Dia. ( All Lead And Lift ) , Suppling & Stacking Np-3 Hume Pipe 900 Mm.Dia. ( All Lead & Lift ) , Suppling & Stacking Np-3 Hume Pipe 1200 Mm.Dia. ( All Lead And Lift ) , Excavation For Foundation Up To 1.50 Mt. Depth Including Sorting Out And Stacking Of Useful Materials And Disposing Off The Excavated Stuff Upto 50 Mt. Lead. ( A ) Loose Or Soft Soil, Excavation For Foundation Up To 1.50 Mt. Depth Including Sorting Out And Stacking Of Useful Materials And Disposing Off The Excavated Stuff Upto 50 Mt. Lead. ( B ) Dence Or Hard Soil, Excavation For Foundation Up To 1.50 Mt. Depth Including Sorting Out And Stacking Of Useful Materials And Disposing Off The Excavated Stuff Upto 50 Mt. Lead. ( C ) Hard Murrum, Excavation For Foundation Up To 1.50 Mt. Depth Including Sorting Out And Stacking Of Useful Materials And Disposing Off The Excavated Stuff Upto 50 Mt. Lead. ( D ) Soft Rock Not Requiring Blasting, Excavation For Foundation Up To 1.50 Mt. Depth Including Sorting Out And Stacking Of Useful Materials And Disposing Off The Excavated Stuff Upto 50 Mt. Lead. ( E ) Hard Rock, Providing Empty Cement Bags Filled With Sand Including Stiching, Loading Unloading And Placing In Position As Directed Including All Materials, Labours With All Lead And Lift. Etc. Complete. With Materials., Demolition Including Stacking Of Servieable Materails And Disposal Of Unserviceable Materials With All Lead And Lift ( A ) R.C.C. Work, Demolition Including Stacking Of Servieable Materails And Disposal Of Unserviceable Materials With All Lead And Lift ( B ) Brick Work & Stone Masonary, Providing And Laying Rubble Pitching Of 22.50 Cm. Thick Including Preparing The Surface Including Pointing To Pitching In C. M. 1:3 Including Curing, Cost Of All Materilas Etc. Complete., Providing And Laying Cement Concrete 1:4:8 ( 1 Cement, 4 Corse Sand, 8-Hand Broken Stone Aggregates 40Mm Nominal Size ) And Curring Complete Excluding Cost Of Formwork In ( A ) Foundtaion And Plinth, Providing And Laying Cement Concrete 1:3:6 ( 1 Cement, 3 Corse Sand, 6-Crushed Stone Aggregates 20Mm Nominal Size ) And Curring Complete Excluding Cost Of Formwork In ( A ) Wall Caps / Coping, Providing And Laying Cement Concrete 1:2:4 ( 1 Cement, 2 Corse Sand, 4-Graded Stone Aggregates 20Mm Nominal Size ) And Curring Complete Including Cost Of Formwork And Reinforcement And For Reinfiorce Concrete Work., Brick Work Using Common Brunt Clay Building Bricks Having Crushing Strength Not Less Than 35Kg. / Sq.Cm. In Foundation And Plinth In Cement Mortar 1:6 ( 1 Cement, 6 Fine Sand ) ( B ) Convantional., Providing Cement Plaster In Single Coat On Brick / Concrete Walls For Interior Plastering Upto Floor Two Level And Finished And Smooth In ( I ) Cement Mortar ( 1 Cement, 3 Sand ) Including For Finishing With A Floating Coat Of Neat Cement Slurry. ( A ) 10Mm Thick, Providing Cement Plaster In Single Coat On Brick / Concrete Walls For Interior Plastering Upto Floor Two Level And Finished And Smooth In ( I ) Cement Mortar ( 1 Cement, 3 Sand ) Including For Finishing With A Floating Coat Of Neat Cement Slurry. ( B ) 15Mm Thick, Providing Cement Plaster In Single Coat On Brick / Concrete Walls For Interior Plastering Upto Floor Two Level And Finished And Smooth In ( I ) Cement Mortar ( 1 Cement, 3 Sand ) Including For Finishing With A Floating Coat Of Neat Cement Slurry. ( C ) 20Mm Thick Item Code, Suppling Stacking, And Spreading Granular Sub Base By Providing Coarse Graded Machine Crushed B. T. Material Satisfying Most Specification Of Grading - I, Spreading And Compacting With Roller On Road Site As Directed Engineer-In-Charge Ect. Completed, Suppling Stacking, And Spreading Granular Sub-Base By Providing Coarse Graded Material Grading-Ii, Spreading And Compacting With Roller On Road Site As Directed Engineer-In-Charge Ect. Completed, Suppling Stacking, And Spreading Graded Stone Aggregate To Wet Mix Macadam Specification Including Premixing The Material With Water Of Mixed Material By Tipper To Site, Laying And Compacting With Roller On Road Site As Directed Engineer-In-Charge Ect. Completed, Supplying Skilled Labour, Providing Front End Dozer With Tractor With Fuel, Driver & Cleaner Charges., Providing Four Wheeler Tempo With Fuel, Driver & Cleaner Charges., Providing Labour At Site Of Work With All Charges Etc. Complete., Applying Geroo And Lime On Tree And Trunks Includings Prearation Of Surface By Cleaning Scraping & Etc. Complete., Applying Clour ( Lime ) To Head Wall Of C.D.Works / Culverts Includings Prearation Of Surface By Cleaning Scraping & Etc. Complete., Supplying And Fixing Ordinary Kilometer Stone Of Precast C.C. 1:2:4 Including Necessary Reinforcement As Per I.R.C. Type Design In C.C. 1:4:8 Including Letter And Paints Etc. Complete ( For M.D.R. ) , Supplying And Fixing Ordinary Kilometer Stone Of Precast C.C. 1:2:4 Including Necessary Reinforcement As Per I.R.C. Type Design In C.C. 1:4:8 Including Letter And Paints Etc. Complete ( For O.D.R. &V.R. ) , Providing And Fixing Hectometer As Per I.R.C. Type Design Including Painting, Lettering Etc. Complete. ( Ii ) Fixing In C.C. 1:5:10, Supplying And Fixing Guard Stone As Per I.R.C. Type Design Including White Washing Etc. Complete. ( Ii ) Fixing In C.C. 1:5:10, Providing Bump Of Hot Mix Material ( Indian Standard ) At Site Of Work Including Cat Eye & White Oil Paint Patta With All Material & Labour Charges Etc. Complete., Flexible Appron : Construction Of Flexible Approan 1 Mt. Thick Comprising Of Loose Stone Bolders Weighting Not Less Than 40 Kg Beyond Curtain Wall, Supply & Laying Of Mechanically Woven Double Twisted Hexagonal Shaped Wire Mesh Gabion Boxes Of Required Size, Mesh Type 10 X 12Cm, Zinc And Pvc Coated, Mesh Wire Dia. 2.7 / 3.7Mm ( Id / Od ) , Mechanically Edged / Selvedged, With Heavy Coating Of Galvanization As Per En 10223-3 / Astm A975 With Partitions At Every 1M Interval And Properly Packed With Approx 200Mm Size Rubble Including Transportion And Placing At Indicated Place As Per Direction Of Engineer In Charge Including Tools, Plants, Labour, Material, Royalty Charge Etc In All Respect And Stiching With Lacing Wire Of Dia 2.2 / 3.2 Mm ( Id / Od ) , Including All Safty Precautions And With All Lead Lift., Providing And Fixing Pre-Cast Rubber Dye / Steel Dye Inter Locking Concrete Block 60Mm Thick With Grade Of Concrete M300 Pnumatic Compressed / Vibrated Mechanically And As Per Approved Design Confirming To Is 15658 : 2006 Including 35 Mm Sand Layer For Levelling And Filling The Joint With Sand In Proper Line And Level As Per Guidlines Of Irc : Sp 63-2018 Etc. Complete., Providing And Fixing Boundary Stone As Per I.R.C. Design Including Painting, Carving Lettering Etc. Complete. ( Ii ) Fixing In C.C. 1:5:10, Painting And Lettering With Enamel Paint 3 Coats Etc Complete. ( I ) Ordinary K.M. Stone For Nh., Sh., And Mdr., Painting And Lettering With Enamel Paint 3 Coats Etc Complete. ( Ii ) Ordinary K.M. Stone For Odr., And Vr., Painting And Lettering With Enamel Paint 3 Coats Etc Complete. ( Iii ) Fifth K.M. Stone., Painting And Lettering With Enamel Paint 3 Coats Etc Complete. ( Iv ) Hectometer Stone., Painting And Lettering With Enamel Paint 3 Coats Etc Complete. ( V ) Road Sign Board., Painting And Lettering With Enamel Paint 3 Coats Etc Complete. ( Vi ) Village Name Board., Painting And Lettering With Enamel Paint 3 Coats Etc Complete. ( Vii ) Junction Board., Numbering The C.D. Work With Approved Paint Including All Materials For Painting Etc. Complete., Numbering The Board With Letter Of Size Upto 100Mm With Approved Paint Including All Materials For Painting Etc. As Per Engineer Incharge., Painting The Board With Approved Paint Including All Materials For Painting, Cleaning, Etc. As Per Engineer Incharge., Painting And Lettering Scale And Numbering With Enamel Paint 3 Coats On Pier / Abutment / Wall Of Major / Minor Bridge / Slab Drain / Box Culvert Etc Complete As Per Irc., Jungle Cutting Both Side Of Road With All Type Of Jungle & Etc. Complete., Applying C.M. 1:3 With Gunniting On R.C.C Surface In Minimum Thickness 50 Mm Over R.C.C Surface ( Clear Cover ) Using Air Pressure 4 Kg / Cm2 Including Scraping, Chiseling Loose And Cement Concrete Surface And Clearing The Surface With Compressed Sir And Water Including Cost Of Providing And Laying Welded Wire Mesh Jalli 10 Guage Wire 100X100mm Chequrred Size Including Tying Binding With Main Reinforcement Cost Of All Material And Machineries, Equipment, Strutting, Staging, Scaffolding, Etc. Comp. With All Lead And Lift., Dowelling Of Bars For Providing Shear Key To Jacketing Existing Sub Structure With 16Mm Dia Bar Using 20 Ml Lock Fix Material Of Hilty Company Or Equivalent Including Cost Of Materials And Labour Charges For Drilling Holes & Grouting Etc. Complete., Jacketing 0.1M Thick With M25 Concrete With Micro Concrete, Polypropelene Fibre, Polymer Mortar And Super Plastisizer With Shuttering, Curing With All Materials And Labour ( 50% Microconcrete + 50% Concrete ( 1:1:2 ) + 12Mm Polypropelene Fabrillated Fibre + Super Plastisizer. Including Applying Bonding Coat Styrine Butadine Rubber On Existing And Treated Concrete Surface Etc. Comp. For All Floors., Coursed Rubble Masonry With Stone Of Approved Quality In Foundations And Plinth In Cement Mortar 1:5 ( 1 - Cement : 5-Coarse Sand ) Etc. Complete.