|
| 1 | For 20 HP AC Surface Pump |
| 2 | Solar Module mounting (Galvanised Steel) surface structure (for 50 KW having hot deep galvanised of Zinc thickness80micron andasperIS4759 withCChannel&antitheftwithNut Boltofgrade SS304which should also withstandhighwindvelocityupto 150km/hr or as per MNRE. |
| 3 | 50 kWp SPV module of 330wP or higher rating, which must have SpecificationasperIS14286/IEC 61215. The module must have to quality IS/IEC61730partI&II(orhaving mechnical load test of 5400Pa) for safetypurpose.ModuletoModule wattage mismatch in SPV Array shall be+/-3%andtoqualityIECTS62804-:2015 for the detection of potential includeddegradationandwarrantedfro outputwattagenotlessthan90%in 10yrs and 80% at the end of 25yrs as per MNRE. |
| 4 | SPVcontroller/VFDintegrated with GPRS,havingMPPT,ProtectionIP65 or above as per MNRE to run 20HP ACSolar Pump. |
| 5 | Solar cable 4mm2 used as per IS 694 or as per MNRE. |
| 6 | Copper cable 95mm2 used as per IS 694 or as per MNRE. |
| 7 | Arrangement ofLightening Arrestorexcluding for 50kW & 3nos. 20HP Solar Pump. |
| 8 | 20H.PA.CSolarpumpsetofhaving performance with respect to Total Head, Maximum Current, Capacity, Voltage Range etc as per MNRE guidelines. |
| 9 | Array junctionbox(IP65orabove) asper MNRE for 50kW SPV. |
| 10 | MiscllaneousAccessoriesforinstallation of 20 H.P Solar Pump |
| 11 | Supplying,installationand commissioningChargeofModuleandStructure for 50kW |
| 12 | Maintenance for atleast 5 years or as per MNREguidelinesfor50kWSPVand 3nos.20HPACSolarPumpwithallaccessories. |
| 13 | For 10 HP SPV DC Surface Pump |
| 14 | Solar Module mounting (Galvanised Steel) surface structure (for 50 KW having hot deep galvanised of Zinc thickness80micron andasperIS4759 withCChannel&antitheftwithNut Boltofgrade SS304which should also withstandhighwindvelocityupto 150km/hr or as per MNRE. |
| 15 | 50 kWp SPV module of 330wP or higher rating, which must have SpecificationasperIS14286/IEC 61215. The module must have to quality IS/IEC61730partI&II(orhaving mechnical load test of 5400Pa) for safetypurpose.ModuletoModule wattage mismatch in SPV Array shall be+/-3%andtoqualityIECTS62804-:2015 for the detection of potential includeddegradationandwarrantedfro outputwattagenotlessthan90%in 10yrs and 80% at the end of 25yrs as per MNRE. |
| 16 | SPVcontroller/VFDintegrated with GPRS,havingMPPT,ProtectionIP65 or above as per MNRE to run 20HP ACSolar Pump. |
| 17 | Solar cable 4mm2 used as per IS 694 or as per MNRE. |
| 18 | Copper cable 25mm2 used as per IS 694 or as per MNRE. |
| 19 | Arrangement ofLightening Arrestor excludingEarthingasperMNREfor 50kW SPV and 5nos. 10HP Solar Pump |
| 20 | 10 H.P D.C (PMSM/BLDC/SRM) Solarpumpsetofhavingperformancewith respecttoTotalHead,Maximum Current, Capacity, Voltage Range etc as per MNRE guidelines. |
| 21 | Array junctionbox(IP65orabove) asper MNRE for 50kW SPV. |
| 22 | MiscllaneousAccessoriesforinstallation of 10 H.P Solar Pump |
| 23 | Supplying,installationand commissioningChargeofModuleandStructure for 50kW |
| 24 | Maintenance for atleast 5 years or as per MNREguidelinesfor50kWSPVand 5nos.10HPSolarPumpwithallaccessories. |
| 25 | For 5 HP SPV DC Surface Pump |
| 26 | SolarModuleMounting(Galvanised Steel)surfacestructure(for5kW) havingHot deep galvanisedofZinc thickness80micronandasper IS4759withCChannel$antitheft withnutboltofgradeSS304,which should also withstand high wind velocity upto 150km/hr or as per MNRE. |
| 27 | 5kWp SPVmodule of330wPor higherrating,whichmusthave Specification asperIS14286/IEC 61215.Themodule musthaveto quilify IS/IEC61730partI$II(or havingmechanicalloadtestof 5400Pa)forsafetypurpose.Module to Module wattage mismatch in SPV Array shallbe+/-3% and to qualify IEC TS 62804-:2015 for the detectionofpotentialinduced degradation and warranted for output wattage not less than 90% in 10yrsand80%attheendof25yrs as per MNRE. |
| 28 | SPVcontroller/VFDintegratedwith GPRS,havingMPPT,ProtectionIP 65oraboveasperMNRE torun 5 HP DC Solar Pump. |
| 29 | Solar cable 4 mm2used as per IS 694 or as per MNRE. |
| 30 | copper cable 4 mm23 Core used as per IS 694 or as per MNRE. |
| 31 | ArrangementofLighteningArrestor excluding Earthing for 5 kW & 2 nos.5 HP Solar Pump |
| 32 | 5 H.P. D.C. Solar pump set of havingperformancewithrespectto TotalHead,Maximum Current,Capacity, Voltage Range etcas per MNRE guidelines. |
| 33 | Array junctionbox(IP 65 or above ) as per MNRE for 5 kW SPV. |
| 34 | MiscllaneousAccessoriesfor Installation of 5 H.P. Solar Pump |
| 35 | Supplying,installation andcommissioning Charge of Module and Structure for 5 kW. |
| 36 | Maintenanceforatleast5yearsor asperMNREguidelinesfor5kW SPVmodule&2nos.5HPD.C. Solar Pump with all accessories |