| 1 | SUPPLY OF CENTRALISED MATERIAL |
| 2 | Pole STP SP23 8.5 Mtr long (Hot bouttom deep) |
| 3 | Pole STP SP21 8.5 Mtr long (Hot bouttom deep) |
| 4 | MS Channel 100x50mm for top and tee-off and T/F Base |
| 5 | MS Angle 50x50x6mm |
| 6 | MS Angle 75x75x6mm( for Gaurding) |
| 7 | 11 KV polymer Pin insulator with Nut |
| 8 | 11 KV polymer Disc insulator with Nut |
| 9 | 11 KV Disc fitting 45 KN |
| 10 | ACSR weasel conductor for earthing & LT line |
| 11 | ACSR Rabbitconductor |
| 12 | Stay Set 16x1800 mm |
| 13 | Stay wire 7/10 SWG |
| 14 | MS earth rod 20x2500mm |
| 15 | GI wire 08 SWG for Garduing |
| 16 | GI wire 06 SWG for Garduing |
| 17 | Earth wire 7/16 SWG |
| 18 | LT XLPE Cable 1x400 sqmm |
| 19 | 11 KV Pilfer Resistant Metering Cubical |
| 20 | SUPPLY OF NON CENTRALISED MATERIAL |
| 21 | Top channel holding clamp for SP23 with N&B |
| 22 | Bracing clamp for top with N&B |
| 23 | Bracing clamp for Bouttom with N&B |
| 24 | Stay clamp for SP23 with N&B D/E |
| 25 | Stay clamp for SP23 with N&B S/E |
| 26 | Shackle Insulator100x115mm |
| 27 | LT Shackle Insulator Clamp for SP21 |
| 28 | 11 KV Fuse Set |
| 29 | Al. Crimping Lugs ( for HT/LT) |
| 30 | LABOUR CHARGE |
| 31 | Cartage of Poleroad site of work by roadtransport. |
| 32 | STP SP23 8.5 mtr long |
| 33 | STP SP21 8.5 mtr long |
| 34 | Cartage of other line matrials conductor, clamp, insulator etc.road site of work by roadtransport. Avgg. Dist. 50 km |
| 35 | Head load Cartage of Pole & Other material fromroad side to wotk sideApproximate distance upto 1 to 3 km. |
| 36 | STP SP23 8.5 mtr long |
| 37 | STP SP21 8.5 mtr long |
| 38 | Small matrial |
| 39 | Excavation of earth for Pole of size 0.9x.6x1/6 of full length of pole for erecation of pole in all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work. |
| 40 | STP SP23 8.5 mtr long |
| 41 | STP SP21 8.5 mtr long |
| 42 | Erecation of following Single/ Double pole of HT and LT line in proper level and alignment along with fixing of all accessories like top channel and clamp as perRESPO |
| 43 | Doublepole of SP23 |
| 44 | Single pole of SP23 |
| 45 | Single pole of SP21 |
| 46 | Grouting of pole in size .45x.45x1/9of the pole in 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO |
| 47 | Muffing of poles 0.45x0.45x0.300 mm with 1:3:6 cc block and 45cm hight from ground level including cost of blast cement etc. |
| 48 | Fabrication of MS Channel angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing, and speecial type bracket etc. |
| 49 | Excavation of earth for Stayof size 0.6x.6x1.2 mtrin all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work. |
| 50 | Fixing, Tighting Stay and Nozzling sagging with pole and stay rod on required tension as per RESPO |
| 51 | 11 KVStay |
| 52 | Grouting of Stay in size 0.6x0.6x1.2 Mtrin 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO |
| 53 | Earthing of support with MS earth rod of 2.5 mtr long to proper depth and connecting pole by earth wire as per RESPO |
| 54 | Laying, spreading, stringing and sagging of 11 KV line in 3 P 4 W of the Rabbit conductor with GI earth wire complete including fixing of all accessories in 3 Nos conductor in parallel with binding and jupering as per profile and sagging chart |
| 55 | ACSR Rabbit conductor 3 P 4 W. |
| 56 | Laying, spreading, stringing and sagging of LT line in 3 P 4 W of the weasel conductor with GI earth wire complete including fixing of all accessories in 3 Nos conductor in parallel with binding and jupering as per profile and sagging chart |
| 57 | ACSR Weaselconductor 3 P 4 W. |
| 58 | Guarding of Line over LT crossing/ Road/LT line crossing with 6/8 SWG GI wire including fixing of guarding channel & Angle as per RESPO |
| 59 | 11 KV Span |
| 60 | Mounting & fixing of fuse set on doubal pole structure includng making of connection complete work. |
| 61 | Providing an dfixing of danger board and number plate complete by providing M Sflate clamp 50x6 mm with N&B |
| 62 | Installation of 11 KV Metering cubical in the metering room with groutingand making all connection. And CT&PT unit |
| 63 | Route cleareance by of tree branches by looping and chopping of tree for 11 KV line |
| 64 | Retaing wall as per annexture -1 |