Tender For Refractory And Ceramic Fibre Lining Repair Works During Plant 214 And 14 Short Shutdown At Cpcl Manali Refinery, manali-Tamil Nadu

Boards / Undertakings / PSU has published Tender For Refractory And Ceramic Fibre Lining Repair Works During Plant 214 And 14 Short Shutdown At Cpcl Manali Refinery. Submission Date for this Tender is 31-03-2023. Kitchen Equipment Tenders in manali Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

37020172
Corrigendum : Tender For Refractory And Ceramic Fibre Lining Repair Works During Plant 214 And 14 Short Shutdown At Cpcl Manali Refinery
Limitted
Indian
Tamil Nadu
Manali
31-03-2023

Tender Details

Refractory And Ceramic Fibre Lining Repair Works During Plant 214 And 14 Short Shutdown At Cpcl Manali Refinery , Ok , General Scope - Refractory Repair Jobs Includes Dismantling Of The Existing Lining As Per Eic / Inspection, Stacking Of The Debris At Designated Locations Upto A Lead Of 200M, Surface Preparation Before Application, Welding Of Anchors / Studs, Re-Lining Of The Same As Per Drawings / Inspection Recommendations, Clearing Of Loose Refractory / Debris Materials From Furnace Floor Before Boxup And Stacking Of The Same At Designated Locations Upto A Lead Of 200M And Obtaining Inspection Clearance For The Refractory Repair Works After Completion Of The Same. Scope Includes Shifting Of Necessary Materials From Cpcl Stores And Stacking The Same Near The Work Spot Using Temporary Shed, Return Of Unused Material To Stores In Good Condition. Scope Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labor To Complete The Job In All Respects. Saffolding Erection Is Excluded From The Contractors Scope. , Refractory Repair Works In Plant 214 On Lumpsum Basis Comprises Of Following Scope. 1 ) Replacement Of Manway Plug Assembly: Removal And Re-Fixing Of 2 No.S Of New / Old Manway Plug Assembly Of Pg Boiler / Cold Collector Including The Back Up Bricks / Blocks, Ceramic Fibre Blanket Etc, As Applicable. 2 ) Fixing Of Available Ceramic Fibre Modules Upto 10 Sqm In Walls / Roofs Of Reformer Including Marking And Welding Of Studs Using Stud Welding Gun Or Manually With The Help Of Electrodes ( Sliding Type / Centre Hole Type ) Along With Fixing Of Back Up Ceramic Fibre Blanket / Board Upto 75 Mm Thick, 0.1 Mm Ss Foil Fixing And Supply And Application Of 2 Coats Of Epoxy Resin Paint. 3 ) Replacement Of Radiant Section Brick Lining Upto 2 Sqm: Renewal Of Refractory Brick Lining Of Wall Of Reformer Including Removal Of Existing Lining, Fixing Of 3Mm Thick Asbestos Mill Board / Ceramic Paper, Upto 200 Mm Thick Ceramic Fibre Board / Castable , 0.15 Mm Ss Foil, 114 / 230 Thick Insulating Bricks Including Welding Of Split Pins & Brick Holding Plates / Anchors At Castable Locations ( If Required ) Including Supply And Application Of 2 Coats Of Epoxy Resin Paint. 4 ) Filling Of Gaps / Cracks In Refractory Lining With Ceramic Fibre ( Cf ) , Thermo Couple Cf Wrapping & Securing With Ss Binding Wire As Per Eic / Inspection Directions Upto 300 M 5 ) Dismantling Of Bricklining / Ceramic Fibre Blanket Or Module Lining ( As Applicable ) In All Reformer Manways For Entry And Relining Of The Same For Boxup ( As Applicable ) . Scope Includes Mobilisation / Demobilisation Of Required Manpower And Machinary Resources , Refractory Repair Works In Plant 14 On Lumpsum Basis Comprises Of Following Scope. 1 ) Relining Of Ceramic Fibre Blanket Lining Upto 2 Sqm In Walls / Roofs Of Furnace Including Marking And Welding Of Studs Using Stud Welding Gun Or Manually With The Help Of Electrodes, Along With Fixing Of Back Up Ceramic Fibre Blanket Upto 75 Mm Thick, 0.1 Mm Ss Foil Fixing ( As Applicable ) , Fixing Of Moist Felt Hot Face Layer Upto 12 Mm Thick, Ceramic Cup Locks, Lds Mouldable ( As Applicable ) And Supply And Application Of 2 Coats Of Epoxy Resin Paint. 2 ) Replacement Of Castable Refractory Upto 1 Sqm : Replacement Of Insulating Castable In Convection / End Tube Sheet / Header Boxes / Stack ( In Position ) For Thickness Upto 150 Mm Including Welding Of V Anchors If Required 3 ) Filling Of Gaps / Cracks In Refractory Lining With Ceramic Fibre ( Cf ) , Thermo Couple Cf Wrapping & Securing With Ss Binding Wire As Per Eic / Inspection Directions Upto 300 M 4 ) Replacement / Re-Alignment Of Muffle Block Assemblies Upto 3 No.S : Removal Of The Existing Muffle Block Segments, Salvaging Of The Usable Segments, Re-Aligning Using New / Salvaged Segments As Per The Drawing Specifications. Muffle Blocks Will Be Supplied By Cpcl Free Of Cost. 5 ) Dismantling Of Castable / Ceramic Fibre Blanket Or Module Lining ( As Applicable ) In All Furnace Manways For Entry And Relining Of The Same For Boxup ( As Applicable ) . Scope Includes Mobilisation / Demobilisation Of Required Manpower And Machinary Resources , Installation Of Available Ceramic Fibre Modules / Moist Felt ( As Applicable ) In Walls / Roofs Of Reformer / Furnace Including Marking And Welding Of Studs Using Stud Welding Gun Or Manually With The Help Of Electrodes ( Sliding Type / Centre Hole Type ) Along With Fixing Of Back Up Ceramic Fibre Blanket / Board Upto 75 Mm Thick, 0.1 Mm Ss Foil Fixing ( As Applicable ) , Ceramic Cup Locks, Lds Mouldable ( As Applicable ) And Supply And Application Of 2 Coats Of Epoxy Resin Paint. , Replacement Of Radiant Section Brick Lining: Renewal Of Refractory Brick Lining Of Wall Of Reformer Including Removal Of Existing Lining, Fixing Of 3Mm Thick Asbestos Mill Board / Ceramic Paper, Upto 200 Mm Thick Ceramic Fibre Board / Castable , 0.15 Mm Ss Foil, 114 / 230 Thick Insulating Bricks Including Welding Of Split Pins & Brick Holding Plates / Anchors At Castable Locations ( If Required ) Including Supply And Application Of 2 Coats Of Epoxy Resin Paint. , Replacement Of Castable Refractory: Replacement Of Insulating Castable In Convection / End Tube Sheet / Header Boxes / Stack ( In Position ) For Thickness Upto 150 Mm Including Welding Of V Anchors If Required , Filling Of Gaps / Cracks In Refractory Lining With Ceramic Fibre ( Cf ) , Thermo Couple Cf Wrapping & Securing With Ss Binding Wire As Per Eic / Inspection Directions , Replacement Of Radiant Section Floor Refractory: Insulating Castable Refractory Upto 175 Mm Thickness ( Single / Multiple Layers ) And Fire Bricks Of Thickness 65 / 75 Mm. , Replacement Of The Ceramic Fibre Blanket Lining: Ceramic Fibre Of Thickness Upto 150 Mm Thickincluding Welding Of Studs / Anchors Asrequired In Burner Housing, Wind Boxes, Etc Securing With Ss Binding Wire As Applicable. => Limited

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 30-03-2023 Corrigendum-1 Date 31-03-2023

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail