Strengthening And Repair With Patchwork Of Tarntaran System. 1 Clearance Of Weed, Jalla, Deela, Sarkanda, Jungle, Butti, Dhora, Silts Etc Manually From Inner Section Of Lined Channel. Lined ( Medium Growth ) . Discharge Upto 0.283 Cumecs 2 Clearance Of Weed, Jalla, Deela, Sarkanda, Jungle, Butti, Dhora, Silts Etc Manually From Inner Section Of Lined Channel. Lined ( Medium Growth ) . Discharge Exceeding 0.283 But Upto 1.42 Cumecs 3 Clearance Of Weed, Jalla, Deela, Sarkanda, Jungle, Butti, Dhora, Silts Etc Manually From Inner Section Of Lined Channel. Lined ( Medium Growth ) . Discharge Exceeding 1.42 But Upto 2.83 Cumecs 4 Clearance Of Weed, Jalla, Deela, Sarkanda, Jungle, Butti, Dhora, Silts Etc Manually From Inner Section Of Lined Channel. Lined ( Medium Growth ) . Discharge Exceeding 2.83 Cumecs 5 Ordinary Jungle Clearance Of Both Banks Of Running Distributaries, Minors And Drains With Discharge Upto 9Cum / S Including Boundary Road:-Discharge Upto 1.5 Cum / S 6 Ordinary Jungle Clearance Of Both Banks Of Running Distributaries, Minors And Drains With Discharge Upto 9Cum / S Including Boundary Road:-Discharge Exceeding 1.5 Cum / S But Upto 4.5 Cum / S 7 Dismantling Brick Work, Tile Masonary Or Tile Lining In Cement 8 Excavation Of Soil Using Hyraulic Excavator And Hydraulic Tractor Trolly I / C Cutting And Loading In Trolly And Transporting To The Embankment Locations With All Lifts And Leads. Disposal / Carraige From 0 Upto 450M 9 Excavation Of Soil Using Hyraulic Excavator And Hydraulic Tractor Trolly I / C Cutting And Loading In Trolly And Transporting To The Embankment Locations With All Lifts And Leads.Disposal / Carraige Additional Beyond 450M Upto 1Km 10 Excavation Of Soil Using Hyraulic Excavator And Hydraulic Tractor Trolly I / C Cutting And Loading In Trolly And Transporting To The Embankment Locations With All Lifts And Leads. Disposal / Carraige For Every Additional Km Upto 10Km 11 Excavation In Soil ( Any Type ) Using Hydraulic Excavator Ck 90 With Hydraulic Excavator Of 0.9 Cum Bucket Capacity Including Cutting, Trimming Bottom And Side Slopes, In Accordance With Requirements Of Lines, Grades And Cross Sections, Including All Lifts And Combined Lead Upto 30M. 12 Earth Work Excavation In Ordinary Soil, Exclusiveof Compensation Of Earth: Extra For Pudding Work 13 Dressing Of Bed And Preparation Of Sub Grade For Lining 14 Dressing Of Side Slopes And Preparation Of Sub Grade For Lining 15 Single Layer Birck Lining 75 Mm Thick For Irrigation Channels ( Distributaries And Minors ) Cup And Trapezoidal Section For All Depths Consisting Of:- First Layer Of 12.5Mm Thick Cement Plaster 1:5 On Subgrade And Finished. Second Layer Of 10Mm Thick Cement Plaster 1:3 Properly Rendered And Finished.75Mm Thick Bricks Laid In 1:3 Cement Sand Mortar Over Second Layer.In Side Slopes For All Sections 16 Filling Triangular Portion Under Coping And On Side Of Toe Wall Underneath Lining With 1:3 Cement Sand Mortar. 17 Laying Brick On Edge Coping 229Mm Wide And 115Mm Thick In Cement Sand Mortar. 18 Laying Brick On Edge Coping 356Mm Wide And 115Mm Thick In Cement Sand Mortar 1:3 19 Raking, Cleaning And Filling Of Hollow Joints In Cement Sand Mortar 1:3 On Side Slopes Of Tile Lined Channel.When Depth Of Channel Is More Than 5Ft And Work Is Done In Closure.If The Work Pertains To Flat Brick Lining The Labour Rates As Well As Through Rates Will Be Increased By 33% Of Rates Of Tile Lining 20 Raking, Cleaning And Filling Of Hollow Joints In Cement Sand Mortar 1:3 On Side Slopes Of Tile Lined Channel.When Depth Of Channel Is More Than 5Ft And Work Is Done In Closure. ( If Depth Is Less Than 5 Fts. , Above Rates Of Item No. 19.29 ( A ) , 19.29 ( B ) Be Decreased By 15% This Rate Will Aiso Be Applicable To Bed Portion .If The Work Pertains To Flat Brick Liningthe Labour Rates As Well As Through Rates Will Be Increased By 33% Of Rates Of Tile Lining. 21 Laying Cement Concrete 1:3:6 Including S / O C / O Loading And Unloading Complete In All Respect. 22 Laying Brick Masonary 1:4 In Cement Sand Motar Including S / O C / O Loading And Unloading Of All Material Complete In All Respect 23 Providing Apmcast Iron Block Complete In All Respect Including Supply Of Pig Iron, Casting And Pattrenmaking As Per Isi Specify 24 Any Other Items ( Csr + Sp )