| 1 | Schedule ICutting, removing damaged portion of deck plate, towing post etc., of 50 T dump barge belongs to Port department by gas cutting and maing the structure surface perfrectly in level to facilitate to fabrication of new steel items without deviating the original alignment, stacking the cut and removed steel materials within the lead of 50 mtr as directed by EIC, including costof all labour charges, cost of minor tools, cost of all materials required, transportation charges of all materials to work site etc., complete. |
| 2 | Fabrication, errection and assembling of steel structuralby cutting / removing as well as by addition to the structure to strengthen existing structures with various size of MS plates, Angles and other steel structures by using are welding with 4 mm / 3.15 mm advani orelikon over coated electrodes and gas welding as per the direction of EIC, including running expences of welding gen set, cost of all labour charges, minor tools, cost of electrods gas cylinders, transprotation charges of all materials to work site,cost of steel structural and plates etc., complete. |
| 3 | Chipping, Scrapping and cleaning the old steel surface with chipping hammer, scrapper etc., and cleaning with wire brush and cotton waste etc., as directed by the engineer in charge including cost of all labour charge, cost of primer paint and thinner painting brush, minor tools etc., complete. |
| 4 | Painting the cleaned surface of the crafts with one coat coat of approved marine quality primer paint / marine quality epoxy primer and painting two coats of marine quality enamel colour paints over the primer coat as directed by the Engineer in charge including cost of all labour charge, cost of primer paint and thinner painting brush, minor tools etc., complete. |
| 5 | Supply and fixing of anodes of Zinc alloy ( IS code 8062 (Part IV) -1979 of size 3.5\" x 1.5\"\"x 12\"\" with four legs in a zigzag manner over the outer submerged surface of Mooring buoyto havecathodic protection to the mooring buoy against the corrosion . The rate is inclusive the cost of anodes, labour charges and consumable items required for its fitment etc complete. |
| 6 | Providing all Old truck tyre as a fender in the side of a-Frame fitted Dumb barge with G.I Chain & D Shackle etc., as directed by the Engineer in charge, including cost of all labour charges cost of materials like, old truck tyre G.I Chain & D shakle etc. |
| 7 | Cost of Beaching the barge and lifting up to required level & cost of launching the barge after repair. |
| 8 | Schedule II Chipping, Scrapping and cleaning the old steel surface with chipping hammer, scrapper etc., and cleaning with wire brush and cotton waste etc., as directed by the engineer in charge including cost of all labour charge, cost of primer paint and thinner painting brush, minor tools etc., complete. |
| 9 | Painting the cleaned surface of the crafts with one coat coat of approved marine quality primer paint / marine quality epoxy primer and painting two coats of marine quality enamel colour paints over the primer coat as directed by the Engineer in charge including cost of all labour charge, cost of primer paint and thinner painting brush, minor tools etc., complete. |
| 10 | Supply and fixing of anodes of Zinc alloy ( IS code 8062 (Part IV) -1979 of size 3.5\" x 1.5\"\"x 12\"\" with four legs in a zigzag manner over the outer submerged surface of Mooring buoyto havecathodic protection to the mooring buoy against the corrosion . The rate is inclusive the cost of anodes, labour charges and consumable items required for its fitment etc complete. |
| 11 | Providing all Old truck tyre as a fender in the side of a-Frame fitted Dumb barge with G.I Chain & D Shackle etc., as directed by the Engineer in charge, including cost of all labour charges cost of materials like, old truck tyre G.I Chain & D shakle etc. |
| 12 | Cost of Beaching the barge and lifting up to required level & cost of launching the barge after repair. |