Various Electric Works On Turn-Key Basis For Electrification And Strengthening Of Infrastructure Due To Extension Of Nagar Nigam Area Eudd-4 Aligarh-2 Supply Of 11 Mtrs. Long St Pole Is 410 Sp-55 3 Supply Of 09 Mtrs. Long St Pole 4 Supply Of Stone Pad 5 Supply Of Suspension Clamp With Eye Hook 6 Supply Of Dead End Clamp With Eye 7 Supply Of Distritbution Box 8 Supply Of Earthing Complete For St Pole 9 Supply Of Stay Complete ( Gi Stay Rod 16X1800mm, 5 Kgs. Stay Wire 7 / 8, Stay Clamps, Bolts, Nuts & Washers ) 10 Supply Of 11 Kv Xlpe Cable Size 3*185 Sq.Mm. 11 Supply Of Acsr Dog Conductor 12 Supply Of Heat Shrinkable Jointing Kit For 11 Kv Xlpe 3X185 Sq.Mm. Cable Outdoor Type 13 Supply Of L.T. Aeirel Bunch Cable Size 3X120+1X95+1X16 Sq.Mm. 14 Supply Of 100 Kva Distribuition Transoformer 15 Supply Of 250 Kva Distribuition Transoformer 16 Supply Of 11 Kv D.O. Fuse Set 17 Supply Of 11 Kv Tpmo 18 Supply Of Al. Lugs 120 Sq.Mm. 19 Supply Of 11 Kv Pin Insulator With Pin 20 Supply Of 11 Kv Disc Insulator With Fitting 21 Supply Of M.S. Top Channel Size 125X65x6 Mm, 2240 Mm. Long With Clamp 22 Supply Of M.S. Dropper Channel Size 100X50x2028 Mm. 23 Supply Of M.S. Base Angle Size 75X75x6mm., 2028 Mm. Long With Clamp For T / F Base 24 Supply Of M.S. T-Off Channel Size 125X65x6 Mm, 2240 Mm. Long With Clamp 25 Supply Of Clamps For Pole 26 Supply Danger Board With Clamp 27 Supply Of Nut, Bolts & Washer 28 Supply Of Barbed Wire 29 Supply Of L.T. Pvc Cable 3.5X400 Sq.Mm. 30 Supply Of L.T. Incoming Panel With Metering Equipment 31 Supply Of Cross Arm 32 Supply Of 11 Kv Vcb Outgoing 200 / 100 / 05 With Penal 33 Supply Of Support Wire 6 Swg 34 Supply Ofacsr Weasel Conductor 35 Supply Of L.T. Aeirel Bunch Cable Size 3X95+1X35+1X16 Sq.Mm. 36 Supply Of I Hook 37 Erection 38 Erection Of Single Support By 11 Mtrs. St Pole Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. As Per Resspo Manual 39 Erection Of Single Support By 09 Mtrs. St Pole Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. As Per Resspo Manual 40 Erection Of Double Pole Structure By 11 Mtrs. St Pole Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. As Per Resspo Manual 41 Laying Of 11 Kv Xlpe Cable 3X185 Sq.Mm. Including Making Proper Connections At Both Ends. The Work Includes The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 42 Laying Spreading, Lifting And Final Sagging Of Aerial Bunched Cable Size 3X95+1X35+1X16 Sq.Mm. Including Fixing Of All Accessories As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. : 43 Laying Spreading, Lifting And Final Sagging Of Aerial Bunched Cable Size 3X120+1X95+1X16 Sq.Mm. Including Fixing Of All Accessories As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. : 44 Laying Of Lt Pvc Cable 3.5X400 Sq.Mm. Including Making Proper Connections At Both Ends. The Work Includes The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 45 Laying Sagging Stringing And Jumpering Of Acsr Dog Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 46 Laying Sagging Stringing And Jumpering Of Acsr Weasel Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 47 Fixing & Connecting Of Earthing Rods As Per Resspo Manual Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. 48 Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work As Per Resspo Manual. 49 Filling Of Heat Shrinkable Jointing Kit For 11 Kv Xlpe 3X185 Sq.Mm. Cable Indoor / Outdoor Type As Per Resspo Norms. 50 Painting Of Double Pole Structure Of St Pole In Two Coats Of Red Oxide And Two Coats Of Silver Paint With Bottom 6 Feet By Fluorescent Paint In Strips. 51 Painting Of Single Pole Structure Of St Pole In Two Coats Of Red Oxide And Two Coats Of Silver Paint With Bottom 6 Feet By Fluorescent Paint In Strips. 52 Erection Of Pin Insulator With Pin & Nuts, 11 Kv 53 Erection Of Disc Insulator With Fittings, 11 Kv 54 Erection Of Danger Board With Nuts & Bolts And Clamps 55 Erection Of M.S. Top Channel Size 125X65x6 Mm, 2240 Mm. Long With Clamp 56 Erection Of M.S. Dropper Channel Size 100X50x2028 Mm. 57 Erection Of M.S. Base Angle Size 75X75x6mm., 2028 Mm. Long With Clamp For T / F Base 58 Erection Of M.S. T-Off Channel Size 125X65x6 Mm, 2240 Mm. Long With Clamp 59 Erection Of Cross Arm 60 Neutral & Body Earthing Of 11 / 0.4 Kv Sub-Stations Installed By Digging Of Pit Upto Water Level Depth ( Approx. 125 Feet ) And Then Inserting 1-¼” Dia Gi Pipe Of ‘A’ Grade, Conforming To The Requirement Of Is Specification And Then Connecting The Top Of The Inserted Pipe And Transformer Body Through Gi Strip Of Size 40X6 Mm With The Help Of Nut And Bolt Or Through Gas Welding, As Per Direction Of Supervising Engineer. It Includes The Cost Of All Material Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. The Aforesaid Work Shall Be Carried Out As Per Resspo Norms. 61 Erection Of Stone Pad 62 Erection Of H.T. / L.T. Clamps With Nuts & Bolts 63 Erection Of Eye-Hook With Suspension Clamps 64 Erection Of 11 Kv Tpmo 65 Erection Of 11 Kv Do Fuse Set 66 Laying Of Barbed Wire 67 Installation Of L.T. Incoming Panel With Metering Equipment 68 Installation Of 11 Kv Vcb Outgoing 200 / 100 / 05 With Penal 69 Fixing Of Lt Distribution Box Including Making Connections Of Distribution Box With Lt Mains By Piercing Clamps For Aerial Bunched Cable.The Work Will Also Include The Opening Of The Service Connection Of The Consumer And Its Connecting In Distribution Box. 70 Mounting Of 100 Kva Distribution Transformer On Double Pole / Placement On Plinth Including Proper Jumpering From 11 Kv Line To The Transformer And Also Connecting The Lt Site Cables As Per Resspo Manual. 71 Mounting Of 250 Kva Distribution Transformer On Double Pole / Placement On Plinth Including Proper Jumpering From 11 Kv Line To The Transformer And Also Connecting The Lt Site Cables As Per Resspo Manual.