|
| 1 | Fabrication jobs |
| 2 | PIPELINES [M.S./ G.I.] Dismantling up to12\"\" including bends, reducers, flanges etc. |
| 3 | PIPELINES [M.S./ G.I.] Erection up to 2\" dia. |
| 4 | PIPELINES [M.S./ G.I.]- do- above 2\" to 12\" dia. |
| 5 | Dismantling,cleaning, burning & refitting of existing pipe lines of all sizes (for cleaning & modification purposes) |
| 6 | M.S Pipe line above 12\" dia. Dismantling |
| 7 | M.S Pipe line above 12\" dia. Fabrication |
| 8 | M.S Pipe line above 12\" dia. Erection |
| 9 | Dismantling of flanges/ Blind for reuse |
| 10 | Refitting of old flanges/Blind[reuse] new |
| 11 | Fabrication of flanges/Blind from M. S. Plate |
| 12 | Valves Dismantling & fitting up to 6\" Size |
| 13 | Valves Dismantling & fittingfrom 7\" to 12\"\" Size |
| 14 | Valves Dismantling & fitting above 12\" Size |
| 15 | Dismantling & fittingof MS fabricated right angle/ globe valve of size more than 12\" size |
| 16 | Dismantling & fitting of C.I. pipe &accessories |
| 17 | Dismantling& fitting of S.S.Pipe & accessories. |
| 18 | Dismantling of MS bend, Tee, nipple, reducer above 12\" |
| 19 | Fabrication of MS bend, tee, nipple, reducer above 12\" |
| 20 | Erection of MS bend, tee, nipple, reducer above 12\" |
| 21 | Dismantling, Fab. & Erection of M.S./S.S. pipe accessories(tee,cone,cross,distance piece, nipple, reducer, bend) |
| 22 | Dismantling, Fab. & Erection of M.S. Plate jobs (tanks, gutters, chutes Pipe rolling, Boiler ducting etc.) |
| 23 | Dis./fab./erection of internal structure of wet scrubber. |
| 24 | Dismantling of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.) |
| 25 | Fabrication of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.) |
| 26 | Erection of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.) |
| 27 | Repairing of old platform dismantling,fab.&erection |
| 28 | Dismantling, fab.& Erectionof railing |
| 29 | Patch work upto 4 sq. ft. max. |
| 30 | Patch work above 4 sq. ft. Welding work ( Two round ) |
| 31 | Fabrication and erection of condensate pit. |
| 32 | Dismantling, Fabrication and erection of Molasses conditional with coil and drive system. |
| 33 | Strengthening of Quad Bodies. |
| 34 | Dismantling, Fabrication and erection of Hopper. |
| 35 | Dismantling, erection and commissioning of Pan Condenser |
| 36 | Dismantling and erection of Air compressor’s Tank |
| 37 | Repairing of ID fan for Boiler Side. |
| 38 | Dismantling, fabrication & erection of Bagacillopipe from bagacillo to vacuum filter |
| 39 | Dismantling, fitting & hydraulic testing of S.S. Tubes (Semi-kestnner, juice heaters ) |
| 40 | Dismantling, fitting & hydraulic testing of S.S. Tubes (vapour cell & evaporator bodies) |
| 41 | Dismantling, fitting & hydraulic testing of S.S /Brass tubes ( pans ) |
| 42 | Dismantling, fabrication & erection of Pan and quad down take |
| 43 | Dismantling, fab. & erection of Pan and Quad calanderia jacket. |
| 44 | Dismantling of up to 4 \" pump & 15 HP motor. |
| 45 | Erection of up to 4 \" pump & 15 HP motor. |
| 46 | Dismantling of 4” to 8” pump & 15 to 40 H.P.Motor |
| 47 | Erection of 4” to 8” pump & 15 to 40 H.P.Motor |
| 48 | Dismantling of above 8” pump & above 40 H.P.Motor |
| 49 | Erection of above 8” pump & above 40 H.P.Motor |
| 50 | Dismantlingof G.I./ A.C.C. Sheet |
| 51 | Fitting (Erection) of G.I./ A.C.C. Sheet |
| 52 | Dismantling of water gutter & ridge |
| 53 | Erection of water gutter & ridge |
| 54 | Dismantling, fabrication, erection of Sulphur furnace complete |
| 55 | Dismantling, fab. & erection of the Melter/ receiver of Sulphur furnace. |
| 56 | Dismantling, fabrication & erectionof Shell of Sulphur furnace |
| 57 | Dismantling, fabrication & erectionof scrubber of sulphur furnace |
| 58 | Dismantling , fabrication & erectionof steam jacket of sulphur furnace |
| 59 | Dismantling, fabrication, erection of Sulphur furnace cooler |
| 60 | Dismantling, Fabrication & erection of the Bottom portion of weight juice tank with MS plates |
| 61 | Dismantling, Fabrication & erection of the Scrappers of Dorr clarifier with MS plates |
| 62 | Dismantling, Fabrication & erection of the Catcher bottle of Vac. Filter with MS plates |
| 63 | Dismantling, Fabrication & erection of the Bottom of Dorr clarifier with MS plates |
| 64 | Dismantling, Fabrication & erection of the Mud tray of Vac. Filter with MS plates |
| 65 | Dismantling, Fabrication & erection of the Mud tank bottom of vac. Filter with MS plates |
| 66 | Dismantling, Fabrication & erection of the Conical portion of juice/ water/ mud tank with MS plates |
| 67 | Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Pans |
| 68 | Dismantling, Fabrication & erection of MS plates of Pan station - Pan tops |
| 69 | Dismantling, Fabrication & erection of MS plates of Pan station - Saveall |
| 70 | Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Vac. Crystallizer |
| 71 | Dismantling, Fabrication & erection of MS plates of Pan station Bottom plates of Syrup & molasses tanks & conditioners |
| 72 | Dismantling, Fabrication & erection of MS plates of Pan station Side plates of Syrup & molasses tanks & conditioners |
| 73 | Dismantling, Fabrication & erection of MS plates of Pan station Pan shell strengthening work with MS channels/ angles/ MS plate rings |
| 74 | Dismantling, Fabrication & erection of MS plates of Pan station Top cone strengthening work with MS channels/ angles/ MS plate rings |
| 75 | Dismantling, Fabrication & erection of MS plates of Pan station Strengthening of vapour line by inner side supporting of angles/ pipes |
| 76 | Dismantling, fab. & erection of coils of horizontal crystallizers |
| 77 | Dismantling of shaft of crystallizers |
| 78 | Fabrication of shaft of crystallizers |
| 79 | Erectionof shaft of crystallizers |
| 80 | Replacement of 3” MS coils (including bends, flange, etc.) of Vertical crystallizers |
| 81 | Dismantling, fab. & erection of arms of A- crystallizers |
| 82 | Replacement of coils of Dorr & evaporator bodies - Juice coils (Dismantling, Fab. & erection) |
| 83 | Replacement of coils of Dorr & evaporator bodies - Ammonia & gas coils (Dismantling, Fab. & erection) |
| 84 | Replacement of weak MS plates & cooling coils of Molasses tanks Bottom plates |
| 85 | Replacement of weak MS plates & cooling coils of Molasses tanks Side plates upto height 10mtr |
| 86 | Replacement of weak MS plates & cooling coils of Molasses tanks Top cone plates with supports |
| 87 | Replacement of weak MS plates & cooling coils of Molasses tanks Cooling coils |
| 88 | Dismantling, fabrication, erection of MS pipe coil fitting at various station |
| 89 | Fabrication of Drum internal plates of boiler |
| 90 | Dismantling, fabrication and erection of expansion joints of boiler |
| 91 | Dismantling of Existing transient Heaters |
| 92 | Shifting of new transient heater at Site |
| 93 | Erection of new/ existing transient heaters |
| 94 | Dismantling/ Fab./ Erection of weak portion of partition plates ofjuice heaters |
| 95 | Dis./ Repairing/ Fabrication & erection of Bagasse belt conveyor on turnkey basis |
| 96 | Dismantlingofspurgar of juice sulphitor for cleaning |
| 97 | Fabricationofspurgar of juice sulphitor for cleaning |
| 98 | Erection/refitting.ofspurgar of juice sulphitor for cleaning |
| 99 | Dis, fab & erection of stainer of injection pump/spray pump |
| 100 | Injection channel jail dismantling, fab. & erection. |
| 101 | Repairing of agitator of vaccum filter dismantling, fab. & erection. |
| 102 | Fabrication of sweeper trolly |
| 103 | Repairing/ changing of vertical crystallizer arms in top gutter (scrapper type) round shape |
| 104 | ETP middle shaft repairing/ replacement |
| 105 | Fab of new lime tank with its shaft, stirer etc. at ETP |
| 106 | Dismantling, fab & erection of save all ofevaporator bodies |
| 107 | Replacement of juice sulphiter top |
| 108 | Dismantling of vibro screen |
| 109 | Fabriaction of vibro screen |
| 110 | Erection of vibro screen |
| 111 | Repairing/ replacement of shell of sugar melter |
| 112 | Replacement of shaft of sugar melter |
| 113 | Replacemnet of arm of sugar melter |
| 114 | Stair case ( With chequared plate) - Dismentling |
| 115 | Stair case ( With chequared plate) - Fabrication |
| 116 | Stair case ( With chequared plate) - Erection |
| 117 | Juice heater cover dismantling, fab. & erection |
| 118 | Juice heater Refitting with testingby pump. |
| 119 | Sight glass fitting in condensate bottle of seed & juice heaters/ any vessel,by welding the sight glass. |
| 120 | Stair case at sugar bin fabrication & erection. |
| 121 | New planatory gear boxes for B massecuite crystallizer. |
| 122 | F.D. old impeller is to be removed and new is to be fitted and trial. |
| 123 | Straightening of old pipe line of thickness 6-8mm into plain sheet by rolling machine |
| 124 | Pan No. 4 mechanical circulator is to be dismantled and parts to be shifted to W |
| 125 | Pan No. 4 mechanical circulagtoris to be dismantled and parts to be shifted to Workshop for machining.After machining the same circulator parts to be fitted and trial. |
| 126 | Rori melter is to be fabricated and erected as per drg. |
| 127 | Replacement of ID fan ducting & casing. |
| 128 | SS condenser repairing by support to be given by rings |
| 129 | Clear juice filter arrangement by jali fitting - dismantling, fabrication, erection |
| 130 | Dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc. |
| 131 | Juice heater header partition plate top & bottom both side - dismantling, fabrication, erection |
| 132 | Oliver filter tray dismantling, fabrication, erection |
| 133 | Centrifugal machine strengthening dismantling, fabrication & fitting from channel, beam |
| 134 | Dismantling, erection of SS tail pipe at pan & quad condenser |
| 135 | Dismantling, fabrication, erection tail pipe support angle channel |
| 136 | Dismantling, fabrication, erectionof complete Pug Mill for continuous machine B- massecuite. |
| 137 | Repairing of bottom portion of hot water tank replacement |
| 138 | SF melter and receiver steam jacket and its coil |
| 139 | Dismantling, fabrication, erection of so2 gas coil/pipe at syrup sulphiter |
| 140 | Dismantling of Condensate pit |
| 141 | Dismantling, fabrication and erection of top and shell of Quad body |
| 142 | Dismantling, fabrication and erection of Wt. juice tank |
| 143 | Dismantling, fabrication and erection of Maceration water tank |
| 144 | Dismantling, fabrication and erection of feed water tank |
| 145 | Dismantling, fabrication and erection of wet scrubber |
| 146 | Dismantling, fabrication and erection of boiler furnace |
| 147 | Dismantling, fabrication and erection of any type of reduction gear box/ planetary gear boxwith bed & motor. |
| 148 | Dismantling, fabrication and erection of mud & juice kush kush and any type conveyor. |
| 149 | Dismantling, fabrication and erection of casing of any type of conveyor. |
| 150 | Dismantling, fabrication and erection of mud and juice boxes. |
| 151 | Dismantling and erection of double beat valves. |
| 152 | Unloading of Iron & steel, pipes |
| 153 | Loading & Unloading of Oxygen cylinder |
| 154 | Shifting, removing and lowering of any type of submersible pump with motor. |
| 155 | Dismantling, fabrication & erectionof Save all of any evaporator body |
| 156 | Dismantling, fabrication & erectionof Top cone of any evaporator body |
| 157 | Dismantling, fabrication & erection of bed for any pump/motor/fan/ gearbox etc. of any size |