| 1 | Earth work narrow excavation for foundation in all soils and sub-soils and to full depth as may be directed except hard rock requiring blasting inclusive of shoring, shuttering and baling out water wherever necessary, refilling the sides of foundation with excavated earth in layers of not more than 15 cm thick, watered, well rammed, consolidated and depositing the surplus earth on bank with initial lead of 10 m & initial lift of 2 m, clearing and leveling the site etc., complete as directed by the Federation officers and as per standard specification. |
| 2 | Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. |
| 3 | Supply and fixing 12 mm thick Bison board ( 8\" X 4\") for flooringincluding the cost and conveyanceto site, cutting charge, weldingall labour chargesas per standard specificationsetc., complete |
| 4 | Supply and fabrication of MS structure including the costof materials and all labour chargesand as per standard specifications and as per design etc complete. |
| 5 | Providing MS powder coated 0.47mm thick sheet roofing / side walling including the cost and conveyance of all to site and all labour chargesand as per standard specifications and as per design etc complete. |
| 6 | Supply and fixing Steel Rolling Shutter [pull and push type with ISI monogram] of approved quality with MS laths 75 mm wide and 18 gauge thick to different sizes including all accessories like sliding grooves, shafts, springs, bearings, hood & locking arrangements and grouting the sides & top assembly with walls & beams, paintingone coat of red oxide primer etc., complete as directed by the Federation officers and as per standard specification. |
| 7 | Supply and fixing 18 gauge MS sheet panels including the cost of materialsand onveyance of all to site and all labour chargesand as per standard specifications and as per design etc complete. |
| 8 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paintred oxide priming coat etc., complete as directed by the departmental officials. |
| 9 | GST (Note: The tenderer should quote the amount towards Goods and Service tax (GST) in the appropriate columns in terms of percentage (%). If not quoted, it will be considered that the rate quoted is inclusive of GST.) |