| 1 | SITC of Pump, Motor Spare Parts and Supplying ,carting , laying and jointing of G.I pipe (M), Source work ,Reservoir& qualitative drinking water for each house hold and all other appurtenantworks etc complete PARSUNDAKHALwater Supply scheme Under PAURIblocks in District Pauri. All rates shall be included all types of taxes and G.S.T. It is necessary the contractor will start the work from source to Distribution System. If any dispute in the source than other workwill not done by the contractor |
| 2 | Construction of a Cross Wall including supply of all material,labour, T&P etc complete |
| 3 | Construction of aFerench Well 250 mm including supply ofall material, labour, T&P etc complete |
| 4 | Construction of Rapid Sand Filter of 0.60 MLD of 2 unit filter beds of1.80 X 2.30 mtrs = 4.04 sqm. each including supply of all material, labour, T&P etc complete |
| 5 | Supplyofallmatirialslabour &t&pcostructflocculatorunite as per drawing and design |
| 6 | supply of all material labour t&p and cunstructsetting tank of75 kl as per drawing and design |
| 7 | supply of all material labour t&p and cunstruct alum dosing - cum mixingchamberof.9MX.90M X1.0Msizeasperdrawing and design |
| 8 | supplyofallmateriallabourt&pandcunstruct25kl backwash tank as per drawing and design |
| 9 | 100 mm dia GI medium class perforated pipe having 10 mm diaholes25mmapart includingsupplyofallmaterial,labour, T&P etc complete |
| 10 | Fillingpebbles or stone25 mm to 50 mm size in gallary for water interception around perforated pipe including supply of all material, labour, T&P etc complete |
| 11 | Providing & Filling large stones pitching including supply ofall material, labour, T&P etc complete |
| 12 | Providing&Fixing 50mmGImediumpipewithplugfor washoutincludingsupplyofallmaterial,labour,T&Petccomplete |
| 13 | Protection works R.R.1:6 Stone masonry |
| 14 | Protection works R.R.dry Stone masonry |
| 15 | P.C.C 1:4:8 |
| 16 | Investigation, design and construction of following RCC SUMP/semisunkreservoirincludingtesting,costofall pipes&fittings,supplyandcartageofallmaterial,Labour and T&P etc,complete. Structural design should be from IIT or equivalent institution. (Cap. in KL)60 KL CWR |
| 17 | Provision for barbed wire fencing wall or such other work allround the land for preventing approach of unathourised souls. for 60 KL SUMP |
| 18 | Investigation, design and construction of following Pump House including testing, cost of all materials & fittings, supply and cartage of all material, Labour and T&P etc, complete. Structural design should be from IIT or equivalentinstitution. |
| 19 | Provision for barbed wire fencing wall or such other work all round the land for preventing approach of unathourised souls. |
| 20 | Investigation, design and construction of following Staff Quarter Type-I including testing, cost of all materials & fittings, supply and cartage of all material, Labour and T&P etc,complete. Structural design should be from IIT orequivalent institution. |
| 21 | Provision for barbed wire fencing wall or such other work all round the land for preventing approach of unathourised souls. |
| 22 | SITCof horizontal splitcasing centrifugal pumps for MPS discharge 200 LPM,204 mtr head, with suitablemotor and base frame and foundation complete . PUMP MOTOR SET |
| 23 | Cabling from Control Panel to Pump |
| 24 | Cable Tray |
| 25 | Cable Glands |
| 26 | Base Frame |
| 27 | Motor Canopy |
| 28 | Inlet and Outlet Mannual Valves (Sluice Valves) |
| 29 | Installation of Pump & Motor, Cable Laying & Termination on both sides,Motor No Load test atsite,Pump Trial for 8 Hours |
| 30 | Control Panel with 2 VFD (One running, One standby), Switch Gear- /Schneider Incorner & Outgoing, CRCA Sheet Powder Coated, Phase Indicator, MFM, Selector Switch, Floor Mounted. |
| 31 | Mandatory Tools & Spares (List Attached) |
| 32 | Non-Returning Valves |
| 33 | Transportation with Loading & Unloading |
| 34 | Providingofallmaterials,cartingfromsitestoretositeof work, Lowering into trenches with true to alignment, Laying of MSERW Pipes grade Yst 210, Jointing by electric welding processwithpropergradeofelectrodessuitableforjointing of water supply lines(Ador, L&T or equivalent electrodes) by cuttingofpipes andmakingrequiredbends bywelding, completion of work with testing of pipe line etc complete. All 80 mm 3.2 mm thick |
| 35 | Earthworkinexcavationbymechanicalmeans(Hydraulic Excavator)/manualmeansinfoundationtrenchesordrains (not exceeding 1.5 m inwidth or 10sqm onplan) including dressingofsidesandrammingofbottoms,liftupto1.5m, including getting out the excavated soiland disposalof surplus excavated soil as directed, within a lead of 50 m. For pipe line in following strata including supply of labour, T&P. etc complete. Assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle,bajri&bouldersandrest25%willbeinmedium rock.In soil mixed with boulders @ 75 % |
| 36 | In soft rock @ 25 % |
| 37 | Cartage of following pipes, specials & fittings from Kotdwar to site store for proper completion of works.80 mm 3.2 mm thick |
| 38 | Supply andfixing of thefollowing fittingsincluding cartage of materials, labour and T&P etc. complete.Wheel Valve/Gate ValveFor 80 mm dia |
| 39 | Air Valve |
| 40 | Non Returning Valve |
| 41 | Supplyofallmaterials,labourandT&Petc.andconstruct following valve chambers as per type design.Wheel Valve Chamber 45cm x 45cm size |
| 42 | Air Valve Chamber 45cm x 45cm size |
| 43 | Non Returning Valve Chamber 45cm x 45cm size |
| 44 | Supplyofallmaterials,labours,T.&P.etc.andconstruct Anchor Blocks as per type design complete.0.80 m X 0.80 m X 0.80 m |
| 45 | 1.00m X 1.00 m X 1.00 m |
| 46 | 1.15 m X 1.15 m X 1.15 m |
| 47 | 1.25 m X 1.25 m X 1.25 m |
| 48 | Investigation, design and construction of following RCC CWR / semi sunk reservoir including testing, cost of all pipes & fittings, supply and cartage of all material, Labour and T&P etc,complete. Structural design should be from IIT or equivalent institution. (Cap. in KL)55 KL |
| 49 | 5.00KL |
| 50 | 10.00KL |
| 51 | 15.00KL |
| 52 | Provision for barbed wire fencing wall or such other work all round the land for preventing approach of unathourised souls. for CWR\"s |
| 53 | Supply andinstallation of bucket type chlorinator of 25 liters capacityincludingbleachingpowder solutiondoser, chloroscope kit with stop cock & iron cage fabricated with 25 mm x 25 mm square mesh withlocking arrangements below dozer to protect flexible pipe connection with CWR complete with all arrangements in position. |
| 54 | Providingofallmaterials,cartingfromsitestoretositeof work,Laying&JointingofG.I.screwedpipes(including supply of all jointing materialslike specials, white lead,,hempand oil etc) intrenches withits cutting,threading and testing of pipe line etc complete.80mm dia |
| 55 | 40mm dia |
| 56 | 32mm dia |
| 57 | 25mm dia |
| 58 | 20mm dia |
| 59 | Cartage of following pipes, specials & fittings from Kotdwar to site store for proper completion of works.for 80 mm dia |
| 60 | for 40 mm dia |
| 61 | for 32 mm dia |
| 62 | for 25 mm dia |
| 63 | for 20 mm dia |
| 64 | Wheel Valve/Gate Valvefor 32 mm dia |
| 65 | for 25 mm dia |
| 66 | Air Valvefor 25mm dia |
| 67 | Supplyofallmaterials,labourandT&Petc.andconstruct following valve chambers as per type design.Wheel Valve Chamber 45cm x 45cm size |
| 68 | Air Valve Chamber 45cm x 45cm size |
| 69 | Earthworkinexcavationbymechanicalmeans(Hydraulic Excavator)/manualmeansinfoundationtrenchesordrains (not exceeding 3.0 m in width on plan) including dressing of sidesandrammingofbottoms,liftupto1.5m,including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.Briddle Path |
| 70 | Providing and fixing 15 mm dia. G.I. pipes complete with G.I. fittings etc. from distribution network to households32 mm dia |
| 71 | 25 mm dia |
| 72 | 20 mm dia |
| 73 | Cartage of following pipes, specials & fittings from Kotdwar to site store for proper completion of works.32 mm dia |
| 74 | 25 mm dia |
| 75 | 20 mm dia |
| 76 | F.H.T.C.Connection -Distribution Line to Household (50) |
| 77 | Godown & Hiring Charges |