| 1 | Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles |
| 2 | Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles |
| 3 | Rocky ground (Medium)- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles |
| 4 | Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles |
| 5 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles |
| 6 | Hard rock requiring Blasting and chisseling- Erection of 7.32m, 7.5m, 8m, 8.23m poles |
| 7 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles |
| 8 | Normal ground- Erection of 9M & 9.14M poles |
| 9 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles |
| 10 | Rocky ground- Erection of 9M & 9.14M poles |
| 11 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 9M & 9.14M poles |
| 12 | Hard rock requiring Blasting and chisseling- Erection of 9M & 9.14M poles |
| 13 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36\" length RS Joists |
| 14 | Normal ground- Erection ofabove 9.14M poles & 36\" length RS Joists |
| 15 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36\" length RS Joists |
| 16 | Rocky ground- Erection ofabove 9.14M poles & 36\" length RS Joists |
| 17 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14M poles & 36\" length RS Joists |
| 18 | Hard rock requiring Blasting and chisseling- Erection of above 9.14M poles & 36\" length RS Joists |
| 19 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for 42\" length RS Joists |
| 20 | Normal ground- Erection of42\" length RS Joists |
| 21 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for 42\" length RS Joists |
| 22 | Rocky ground- Erection of 42\" length RS Joists |
| 23 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 42\" length RS Joists |
| 24 | Hard rock requiring Blasting and chisseling- Erection of 42\" length RS Joists |
| 25 | Transporting of poles from road side to pole pit upto 2KM - 7.32m, 7.5m, 8m, 8.23m RCC pole |
| 26 | Transporting of poles from road side to pole pit upto 2KM- 9m, 9.14m RCC/PSC pole |
| 27 | Transporting of poles from road side to pole pit upto 2KM - RSJ 36\" Pole |
| 28 | Transporting of poles from road side to pole pit - RSJ 42\" and above |
| 29 | Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole |
| 30 | Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole |
| 31 | Loading and Unloading of poles - RS Joists, tubular & rail pole (above 9.14m) |
| 32 | Concreting of poles as per Board Standards (2\"*2\"*5\"). The materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.complete) |
| 33 | Coping of pole (0.6m*0.6m*0.35m) |
| 34 | Concreting of stay (o.3m * 0.3m * 1.5m) including materials |
| 35 | Coil earthing per pole & pole earthing |
| 36 | Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
| 37 | Normal ground- Erection of stay set |
| 38 | Rocky ground (Medium)- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
| 39 | Rocky ground- Erection of stay set |
| 40 | Hard Rock requires blasting & chisseling- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
| 41 | Hard Rock requires blasting & chisseling- Erection of stay set |
| 42 | Loadingand unloading charges of Oil drums (with oil) |
| 43 | Loadingand unloading charges of Oil drums (withoutoil) |
| 44 | Loadingand unloading charges of Conductor Drum, Cable Drum |
| 45 | Loadingand unloading charges of Line Materials |
| 46 | Loadingand unloading charges of Metering Set |
| 47 | 11KV Lines-(Pin point) Fixing of V & Channel cross arm 5.5\" including transporting of materials from road side to site |
| 48 | 11KV Lines-(Cut Point) Fixing of V & Channel cross arm 5.5\" including transporting of materials from road side to site |
| 49 | 11KV Lines-(Pin point) Fixing of V & Channel cross arm 4.5\" including transporting of materials from road side to site |
| 50 | 11KV Lines-(Cut Point) Fixing of V & Channel cross arm 4.5\" including transporting of materials from road side to site |
| 51 | 11KV Lines-(Pin point) Fixing of V & Channel cross arm 3.5\" including transporting of materials from road side to site |
| 52 | 11KV Lines-(Cut Point) Fixing of V & Channel cross arm 3.5\" including transporting of materials from road side to site |
| 53 | 11KV Lines-Fixing of LT 3Phase cross arm including transporting of materials from road side to site |
| 54 | 11KV Lines-Fixing of LT 1Phase cross arm including transporting of materials from road side to site |
| 55 | 11KV Lines-Fixing of HT LT TI fitting including transporting of materials from road side to site |
| 56 | 11KV Lines-Erection of HT Side arm with stud including transporting of materials from road side to site |
| 57 | 11KV Lines-Erection of LT Side arm with stud including transporting of materials from road side to site |
| 58 | 11KV Lines-Fixing of insulator (per location) including transporting of materials from road side to site |
| 59 | 11KV Lines-Fixing of 11KV Disc including transporting of materials from road side to site |
| 60 | 11KV Lines-Fixing of Tapping channel Cross arm including transporting of materials from road side to site |
| 61 | HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For Dog conductor (1Span/Wire) |
| 62 | HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR conductor (1Span/Wire) |
| 63 | HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For Dog conductor (1Span/Wire) with- Line clear works |
| 64 | HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR conductor (1Span/Wire) with Line clear works |
| 65 | 11KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire) |
| 66 | 11KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire) |
| 67 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire) |
| 68 | 11KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire)-with line clear works |
| 69 | 11KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire) with line clear works |
| 70 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire) with line clear works |
| 71 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR, 7/2.50AAAC |
| 72 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR, 7/3.15 AAAC |
| 73 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR, 7/2.50AAAC with line clear works (1Span/Wire) |
| 74 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR, 7/3.15 AAACwith line clear works (1Span/Wire) |
| 75 | Guarding per span length- Spilt Neutral Guarding |
| 76 | Guarding per span length- Flat Guarding (2 wires) |
| 77 | Guarding per span length- Flat Guarding (4 wires) |
| 78 | Guarding per span length- Flat Guarding (6 wires) |
| 79 | Guarding per span length- Cradle Guarding (Fixing of \" X\" arm Lacing ) |
| 80 | Guarding per span length- Fixing of one earthing device with stud |
| 81 | Erection of transformer/dismantling upto 200KVA |
| 82 | Erection of transformer/dismantling upto 250KVA |
| 83 | Erection of transformer/dismantling upto 500KVA |
| 84 | Erection of centre support (Including concrete) |
| 85 | Erection of Metering set |
| 86 | Erection of feeder cable with open type fuse unit per feeder |
| 87 | Erection of feeder cable with open type fuse unit - for each addl feeder |
| 88 | Erection of feeder cable -Bus bar arrangement with open type |
| 89 | Loading & unloading of Distribution transformer below 250KVA |
| 90 | Loading & unloading of Distribution transformer 250KVA |
| 91 | Loading & unloading of Distribution transformer 500KVA |
| 92 | Plinth work for 500KVA DT with construction material |
| 93 | Fabrication ,erection and excavation for centre support etc for 250 /500 DT including transporting |
| 94 | Tube light erection-1*40W tube light complete set (including transport) |
| 95 | Tube light erection-For SV lamp and mercury lamp complete set (including transport) |
| 96 | Tube light erection-For CFL lamp complete set (including transport) |
| 97 | Painting of Sc Number including Painting |
| 98 | Tube light 72W LED Erection |
| 99 | Manufacturing of clamps 50*8 mm |
| 100 | Manufacturing of clamps 65*10 mm |
| 101 | Alteration of clamps |
| 102 | Street light switching point arrangement |
| 103 | Drilling / Less than 23mm holes per hole /slotted holes |
| 104 | Cutting of channel |
| 105 | Cutting of Flat |
| 106 | Cutting of Angle |
| 107 | RSJ pole cutting |
| 108 | Tubular pole cutting |
| 109 | Rail pole cutting |
| 110 | Fabrication of lightning arrestor frame |
| 111 | LT-Changing of pin point to cut point |
| 112 | HT-Changing of pin point to cut point |
| 113 | Erection of service connection materials-1Ph service |
| 114 | Erection of service connection materials-3Ph service |
| 115 | Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc., |
| 116 | Dismantling of poles without concrete in damaged condition including grill separation etc., |
| 117 | Providing jumpering at cut point |
| 118 | complete replacement of worn out earth wire per structure |
| 119 | Labour for manufacturing of open type fuse unit (Materials supplied by board) |
| 120 | Manufacturing of HG fuse stool incl. materials |
| 121 | Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees |
| 122 | Tree clearence in HT or LT location- For coconut trees |
| 123 | Tree clearence in HT or LT location- For Palmrah trees |
| 124 | Painting-Double pole Transformer structure materials (Double coat) (Including cost of paint) |
| 125 | Painting-Pole (Colour washing with distember) 2 Nos (Including cost of paint) |
| 126 | Painting-For transformer only (Double coat with paint) |
| 127 | Numbering of poles with backround colour paint |
| 128 | Numbering of Distribution Transformer (Painting and writing of name board size-1-1/4*1 incl cost of paint & board and MS sheet |
| 129 | Writing in seating channel (Paint to be supplied by contractor) |
| 130 | Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by contractor |
| 131 | Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by contrcator |
| 132 | Set right of leaning HT pole/LT pole including x arms, TI fittings |
| 133 | Transformer structure erection-Excavation of structure pole pits ( 2Nos) |
| 134 | Transformer structure erection-Erection of structure poles ( 2Nos) |
| 135 | Transformer structure erection-Excavation of stay pits(4Nos) |
| 136 | Transformer structure erection-Erection of stay set (4Nos) |
| 137 | Transformer structure erection-Concreting of structure poles incl.materials Mass concrete with coping (2 poles) |
| 138 | Transformer structure erection-Concreting of stays (4Nos) incl.materials |
| 139 | Erection of Structure materials-Top Channel |
| 140 | Erection of Structure materials-Transformer seating channel and belting angle |
| 141 | Erection of Structure materials-AB switch (Complete) |
| 142 | Erection of Structure materials-HG fuse (Complete) |
| 143 | Erection of Structure materials-Jumpering |
| 144 | Erection of Structure materials-HT LAS |
| 145 | Erection of Structure materials-LT LAS |
| 146 | Erection of structure materials -Transformer LT cable wiring / LT Bus Bar |
| 147 | Erection of structure material-Erection of LT Open type fuse unit including cablejumbering up to the line including cutting welding bending ,fabrication etc |
| 148 | Earthing system-Excavation of 4 Nos. earth pits |
| 149 | Earthing system-Excavation of earth wire trenches and paving of earth wire, Erection of 4 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection |
| 150 | Earthing system-Mason works with bricksforearth pits4 nos (cementsupplied by Contractor) |
| 151 | Earthing system-Painting of transformer structure 2 coats incl.paint |
| 152 | Earthing system-Painting with Distember paint on poles with paint cost |
| 153 | Earthing system-Spreading yard jelly and cut stone and bricks including material |
| 154 | Earthing system-Writing of name board and target board |
| 155 | Earthing system-Transporting of Structure materials ABS,HG Fuse,cable etc Except Pole |
| 156 | Earthing system-Fixing of Danger Board ( labour only) |
| 157 | Erection of Tapping structure-Excavation of structure pole pit. (2Nos) |
| 158 | Erection of Tapping structure-Erection of structure pole. (2Nos) |
| 159 | Erection of Tapping structure-Excavation of stay pit (2Nos) |
| 160 | Erection of Tapping structure-Erection of stay set (2Nos) |
| 161 | Erection of Tapping structure- Concreting of structure poles including materials Mass Concrete with Copping (2Nos) |
| 162 | Erection of Tapping structure-Concreting of stay (2Nos) |
| 163 | Erection of Structure materials-Top channel |
| 164 | Erection of Structure materials-AB switch (complete) |
| 165 | Erection of Structure materials-Assemble, operating pipe fixing etc., fixing of cross bracing |
| 166 | Earthing system-Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure. |
| 167 | Earthing system-Mason works with Bricks for earth pit (including material) |
| 168 | Colour coating on poles with iron materials including paint and distember |
| 169 | Transporting of 42\" twin RSJ pole from roadside pole pit |
| 170 | Fabrication of 42\" Twin RSJ pole, Materials supplied by Board. |
| 171 | Excavation & Erection of Twin 42\"2\" fabricated RSJ pole |
| 172 | Concreting of 42\" twin RSJ pole |
| 173 | Loadiing & Unloading of 42\" Twin RSJ pole |
| 174 | Resagging of various conductor (Please mention in percentage of respectie conductor) |
| 175 | Dismantling of 7.5m /8m pole with out damage |
| 176 | Dismantling of 9.14m pole/ RSJ with out damage |
| 177 | Dismantling of stay set complete |
| 178 | Replacement of detoriated stay rod |
| 179 | Replacement of RSJ/Tubular poles below 30 feet |
| 180 | Replacement Of RSJ/Tubular poles aove 30 feet |
| 181 | Dismantling of detoriated cables of various size(95,120,185 sq.mm) from DT,LT bushing to LT open type clamp anderection of suitable lug at both ends |
| 182 | Replacement of new 10\" earthpipe replacing the corroded earth pipe and renewal of earthing including burying , looping and binding |
| 183 | Mass Concrete for poles on the line ( All Materials including cementRatio 1:2:4) ( 1 Loc ( 0.72 m3) (0.65*0.65*1.65 m,0.6*0.6*0.35 Cum) |
| 184 | SleeveConcrete for poles on the line ( All Materials including cementRatio 1:2:4) ( 1 Loc ( 0.202 ) (0.5*0.45*0.9M) |
| 185 | Providing of Spacers in LT Lines |
| 186 | Hiring of JCB |
| 187 | Hiring of Crane |
| 188 | Exceeding 1 Hour for every hour |
| 189 | Transporting of Charges of DT / Line materials using private vehicle upto 20 KM( Up and Down) |
| 190 | Beyond 20 KM for every KM |
| 191 | Single pole structure erection- Excavation of structure pole pit 3’ x 6’ by using JCB or Manual |
| 192 | Single pole structure erection- Transportation of pole from road side to pole pit by using JCB or Manual |
| 193 | Single pole structure erection-Erection of poles by using JCB or Manual |
| 194 | Single pole structure erection Excavation of stay pit by JCB or Manual (2Nos) |
| 195 | Single pole structure erection- Erection of stay set complete (2Nos) |
| 196 | Single pole structure erection -Mass concreting for structure |
| 197 | Single pole structure erection -Stay Concrete (2Nos) |
| 198 | Single pole structure erection -Erection of Structure materials- Tapping channel |
| 199 | Single pole structure erection -Erection of Structure materials- Transformer Bed Stucture |
| 200 | Single pole structure erection -Erection of AB switch |
| 201 | Single pole structure erection -Erection of H.G. Fuse (3Nos) |
| 202 | Structure earthing complete with 3 pits and earth loops |
| 203 | Single pole structure erection-Fixing of MCD Box |
| 204 | Single pole structure erection-HT-LAS fixing (3Nos) |
| 205 | Singple pole structure erection-LT-LAS fixing (3Nos) |
| 206 | Single pole structure erection-HT jumpering complete |
| 207 | Singple pole structure erection-Painting of all clamps and other iron materials and painting of structure pole |
| 208 | Single pole structure erection-LTCable arrangement |
| 209 | Single pole structure erection-Fixing of Danger board |
| 210 | Dismantling of other line materials - (Please mention In percentage for respective line material errection works) |