| 1 | Item Description |
| 2 | Demolishing of reinforced concrete including stacking of usable material and disposal of unuseable material within 50 m lead inclusive of de-watering wherever required. |
| 3 | Rate as per BSR 2022 ch XVII item no.3 P.N. 85 |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earthwithininitialleadof50mandliftupto1.5mincludingdressingof excavated area and dewatering wherever required complete in all respect |
| 5 | (c)Hard soil mixed with Kankar / boulders, Morrum |
| 6 | Rate as per BSR 2022 ch V item no.1c P.N.11 |
| 7 | ProvidingandLayinginpositionofCementconcreteNominalmix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3(1 cement : 3 coarse sand) and making good the joints excludingthe cost of centering, shuttering and reinforcement. Well graded crusherbroken stone aggregate of maximum size upto 20mm |
| 8 | Rate as per BSR 2022 ch IX item no.8d P.N.26 |
| 9 | Centering and shuttering for piers, galleries, barrels,intake well, sluice well upto 3.0m height from base/floor level (To achieve F2 finish) |
| 10 | Rate as per BSR 2022 ch X item no.3 P.N.32 |
| 11 | Add extra overitem no. 4 for centering and shutterring for each additional 1 m height or part thereof above initial height of 3.0m from base/floor level. |
| 12 | Rate as per BSR 2022 ch X item no.4 P.N.32 |
| 13 | Centring and shuttring for slabesbeams lintles,column trough with without caps and base including proping and remove |
| 14 | Rate as per BSR 2022 ch X item no.2 P.N.32 |
| 15 | Supplying of M.S. reionforcement including labour charges for bending bindingandplacinginpositionallreinforcementasperdrawingincluding cost of binding wire and all leads and lifts using. Tor or ribed bars |
| 16 | Rate as per BSR 2022 ch X item no. 9 b(ii) P.N.33 |
| 17 | Providing and Laying in position of Cement concrete Design mix M-25 includingleadsofallconstructionmaterials,plasticizers(ifrequired), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excludingthe costofcentering,shutteringandreinforcement.Wellgradedcrusher brokenstoneaggregateof maximum sizeupto(FormixdesignCement content considered 420 kg/ cum of concrete)20 mm |
| 18 | Extra labour charges for RCC due to obstruction in laying and placingthe reinforced cement concrete due to reinforcement.Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas,Retainingwalls,piers,abutments,galleries,archcovers,bedplates, sluice capstan bases etc. |
| 19 | Rate as per BSR 2022 ch IX item no. 3d P.N.25+ ch. X item no. 10bP.N.33 |
| 20 | Providing and Laying in position of Cement concrete Design mix M-25 includingleadsofallconstructionmaterials,plasticizers(ifrequired), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excludingthe costofcentering,shutteringandreinforcement.Wellgradedcrusher brokenstoneaggregateof maximum sizeupto(FormixdesignCement content considered 420 kg/ cum of concrete)20 mm |
| 21 | Extra labour charges for RCC due to obstruction in laying and placingthe reinforced cement concrete due to reinforcement.Aqueducttroughs,siphonconduits,boxtypesluicebarrels,domes spiral shafts or stair cases ( thin walled section) and ogee crests, baffle or chute blocks, end sills, buckets, projects coping, extended sill etc. |
| 22 | Rate as per BSR 2022 ch IX item no. 3d P.N.25+ ch. X item no. 10c P.N.33 |
| 23 | Supply&fixing6mmthickPVCwatersealofapprovedqualityin construction/contraction joint as per drawing complete in all respect. |
| 24 | 305 mm wide |
| 25 | Rate as per BSR 2022 ch X item no 7c(ii) P.N.33 |