|
| 1 | Delaunching of Baily Bridge by way of steel work rivetted or bolted in builtup sections, trusses, framemed work,b.w.o. Delaunching of panels, panel-pins, transoms, transom clamps, chord reinforcement, chord bolt(L/S), Base plate, Bearing, Side deck (L/S), Centre deck (L/S), End deck (L/S), HD bolts, Sway Brace, End post (M/F) Bracking bolt, Bracing Frame, Racker, Tie Plate,Roller etc. gears/ tools/ tackles etc or any other tools, safety gadgets and other machinery which ever required (excl cost of components) using cranes, hydra, skilled labour. |
| 2 | Launching of Baily Bridge by way of steel work rivetted or bolted in builtup sections, trusses, framemed work, including hoistting, fixing in position,b.w.o. Launchingpanels, panel-pins,transoms,transom clamps, chord reinforcement,chord bolt(L/S), Base plate, Bearing, Side deck (L/S), Centre deck (L/S), End deck (L/S), HD bolts, Sway Brace, End post (M/F) Bracking bolt, Bracing Frame, Racker, Tie Plate,Roller etc. gears/ tools/ tackles etc or any other tools, safety gadgets and other machinery which ever required (excl cost of components) using cranes, hydra, skilled labourusing Hydra Crans& Skilled labour. |
| 3 | Carriage of materials from Divisional Store Zewan to site of work and left over components back to Divisional store. incl. return ofdamaged componets of bailey bridge to Zewan store. ( Upto 32Km) |
| 4 | Loading & unloading of components using hydraulic crane & labour. |
| 5 | Engagement of JCB to remove land slides & to make road even for de -launching. |
| 6 | Engagement of black smith for cleaning of rusted nuts incl. cutting of MS steel and other materials using mechanical drill or gas welding |