}

Tender For Piping Modification Works For Installation Of New 24 Inch Mov At Crude Tank Inlet Nozzles At Manali Refinery Of Cpcl, manali-Tamil Nadu

Boards / Undertakings / PSU has published Tender For Piping Modification Works For Installation Of New 24 Inch Mov At Crude Tank Inlet Nozzles At Manali Refinery Of Cpcl. Submission Date for this Tender is 08-02-2023. Earth Moving Machinery Tenders in manali Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

35912956
Tender For Piping Modification Works For Installation Of New 24 Inch Mov At Crude Tank Inlet Nozzles At Manali Refinery Of Cpcl
Limitted
Indian
Tamil Nadu
Manali
08-02-2023

Tender Details

Piping Modification Works For Installation Of New 24 Inch Mov At Crude Tank Inlet Nozzles At Manali Refinery Of Cpcl , Blinding And De-Blinding , The Job Includes Collection And Transportation Of Required Quantity Of Materials Like Gaskets, Fastners Etc. From Owner Storage Point, Loosening And Tighting Of Studs (Cold/Gas Cutting If Required), Wedge Opening, Cleaning Of Flanges, Insertion Of Blinds And Removal Of Blinds & Gaskets, Providing New Gaskets After Removal Of Blinds, Over Hauling Of Fastners Using Oil, Replacing The Defective Studs, Nuts To Ensure Zero Leak Of Joints Including Hot Bolting.Blind Shall Be Fabricated And Supplied By Contractor. , The Job Also Includes Supplying Of All Types Of Tools And Tackles, Lifiting Arrangements Like Chain Pulley Blocks, Mechineries, All Consumables And Labour To Complete The Job In All Respects,Transportation Of Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions. , Blinding & Deblinding Of 150# And 300# Ratings , Blinding & Deblinding - Size 18 Inch Dia. To 24 Inch Dia. , Water Flushing, Air Blowing, Steam Blowing And Drying With Blower , Rates Are Inclusive Of Labour And Supply Of Tools And Tackles For Water Flushing Amd Air Blowing Of Various Hydrocarbon And Other Pipelines/Headers At Tanks Tk-113,114,115,116,117 And 118 Inlet As Directed By Eic, Contractor Shall Supply Fire Water Hoses, Steam Hoses, Water Hoses, Etc. Along With Chicago Couplings, Flange Connections And Similar Fittings Required To Connect The Hoses For Successful Completion Of The Work. Any Required Valves Etc For This Works Shall Be Provided On Free Of Cost.Two Tanks Only Shall Be Taken At A Time For Modification When Inlet Header Is Released By Operations.For Completion Of Modification At Six Tanks,It Requires Three Times Flushing,Air Blowing,Steam Blowing And Drying. , This Job Includes Supplying Of All Necessary Tools And Tackles, Other Water Flushing Accessories, Air Blowing Accessories, Air Blower Or Compressor For Carrying Out Air Blowing, Steam Hoses And Accessories For Steam Blowing, And Carrying Out Above Activities As Per Instruction Of Eic And Inspection Personnel. Steam And Water Shall Be Provided By Cpcl. Contractor Shall Supply Air Blowers, Compressors. , 8 Dia To 12 Dia , 14 Dia To 24 Dia , 30 Dia To 36 Dia , Dismantling & Removal Of Piping , The Job Involves Removal Of Existing Above Ground, Under Ground, Overhead Insulated Or Uninsulated Or Steam Traced Piping Including All Types Of Fittings Like Elbows / Tees / Reducers, Etc., Flanges, Valves, All Types Of Instruments, Supports By Coldcutting / Gas Cutting / Grinding, Etc., At All Locations At All Grades & Elevations Without Damaging Any Other Portion Of The Existing Unit, Lowering Down The Same To Ground Level, Transportation Of The Same To The Designated Area As Per The Instructions Of Engineer-In-Charge. The Insulation Materials To Be Removed From The Pipesand Transported To Their Respective Designated Locations As Per Eic. , The Job Also Includes Supplying Of All Types Of Tools & Tackles,Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects. , Dismantling & Removal Of Piping - Carbon Steel , Carbon Steel Piping Work - Above Ground , The Job Includes Transporation Of All Free Issue Materials From Owners Storage Point To Work Site, Handling At Site, Cutting, Bevelling, Fabrication, Laying, Welding & Erection Of Carbon Steel Piping At All Locations Above Ground Level, Overhead, Over Sleepers, Piperacks, Crossovers, Pipe Sleeves, Trenches, Stand Posts, Connecting With Equipments & Nozzles, Providing Tappings From The Existing Pipelines At All Grades & Elevations Including Under Road Culverts. , The Piping Job Includes All Modification And Replacement Jobs Involving Pipes & All Types Of Fittings Like Elbows / Tees / Reducers / Half Coupling / Full Coupling, Etc.,All Types Of Flanges Like Slip On / Raised Face, Etc., All Types Of Inline Instruments Like Rotameter / Pressure Gauges / Thermowells, Etc., Valves, Expansion Joints, Steam Traps, Orifice Assemblies, Strainers, Vents, Drains, Funnels, Etc., Of Different Schedules, Pressure Ratings And For Various Temperature Applications , The Piping Job Includes Providing Shoe Supports, Pads At Support Locations, Reinforcement Pads, Etc., Wherever Required. , The Job Includes Flushing, Preparing Work Area For Executing Hot Work, Bending To Suit The Contours Wherever Required, Socket, Fillet, Butt Welding Using E 6010 / E 6013 / E 7018 Electrodes / Er 70S2 Filler Wire As Required, Post Weld Heat Treatment (Pwht - Stress Relieving) After Welding Wherever Required, Dpt Wherever Required,Hydraulic / Pneumatic Test As Per Codes, Specification, Drawings And Draining Of Water & Drying With Compressor Air After Hydrotest. , The Job Also Includes Supplying Of All Types Of Tools & Tackles,Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Returning Back The Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To The Designated Area As Per Eic Instructions. , The Rates For The Following Items Shall Be Exclusive Of Blinding & Deblinding, Flushing Of The Piping System,Radiography, Stress Relieving, Reinforcement Pad Welding, Removal Of Old Piping For Replacement And Erection & Removal Of Scaffolding, Hydrotesting And Draining / Drying Of The Piping System. , The Rates For The Following Items Shall Be Inclusive Of Fabrication, Laying, Erection, Welding, Providing Shoe Supports, Pads At Support Locations, Offering Stagewise Inspection. , With Cpcl Supply Of Free Power & Contractors Welding Machine , Socket Welding - All Elevations , Carbon Steel - Above Ground Piping - Socket / Fillet Welding Joint - Without Hydrotest , Butt Welding - Upto 5 Metres From Ground Level - Using Er-70S2 Filler Wire / E-7018 Electrodes , Carbon Steel - Above Ground Piping - Butt Welding Joint - Upto 8.8 Mm Thickness - Without Hydrotest (Root Er-70S2 / Filling E-7018) , Carbon Steel - Above Ground Piping - Butt Welding Joint - Above 8.8 Mm And Upto 12.7 Mm Thickness - Without Hydrotest (Root Er-70S2 / Filling E-7018) , Notes: , (1) Thickness Of Piping For Measurement Shall Be Based On The Relevant Ansi Or Equivalent Standards , (2) The Finished Weld Joint Elevation At Site Shall Be Taken As Reference For Measurement, Wherever Applicable. , (3) The Rates For Socket & Fillet Welding In Piping Shall Remain Same For All Thickness And Elevations As Per Sor. , (4) Rate For Weld Joints Of Vents & Drains Shall Be Paid On Actual Measurement Using The Applicable Sor. , (5) For Reinforcement Pad Welding, The Rates Shall Be Paid As Per Separately Sor , (6) Fabrication & Welding Of Pipe Shoe Supports & Pad At Support Locations Are Included In Sor And Will Not Be Considered For Measurement , (7) For Blinding & Deblinding Wherever Involved, Rates Shall Be Paid Separately , (8) In Case Of Replacement Of Existing Piping, Rates For Removal Of Old Pipelines Shall Be Paid Separately , (9) During Hydrotesting Of The Above Piping Jobs, Some Portions Of The Existing Piping In The Circuit Required To Be Hydrotested Depending On The Blinding And The Same Is Included In The Applicable Welding Sor. , (10) Radiography Of Weld Joints Is Not Included In Sor And Rate Shall Be Paid Separately , Carbon Steel Piping Specials Like Mitre Cut Bend, Reducers , The Job Includes Transporation Of All Free Issue Materials From Owners Storage Point To Work Site, Handling At Site, Cutting, Bevelling, Fabrication & Welding Of Carbon Steel Piping Specials (Of Any Thickness) Like 4 Element - 3 Weld Type 90° Mitre Cut Bend,3 Element - 2 Weld Type 45° Mitre Cut Bend / Reducers, Etc., At All Locations Above Ground Level, Overhead, Over Sleepers, Piperacks, Crossovers, Pipe Sleeves, Trenches, Stand Posts, Connecting With Equipments & Nozzles At All Grades & Elevations Including Under Road Culverts Of Different Schedules, Pressure Ratings And For Various Temperature Applications. , The Job Includes Flushing, Preparing Work Area For Executing Hot Work, Bending To Suit The Contours Wherever Required, Welding Using E 6010 / E 6013 / E 7018 Electrodes As Required, Dpt Wherever Required, Hydraulic / Pneumatic Test As Per Codes, Specification, Drawings And Draining Of Water & Drying With Compressor Air After Hydrotest. , The Job Also Includes Supplying Of All Types Of Tools & Tackles,Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Returning Back The Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions. , The Rates For The Following Items Shall Be Exclusive Of Radiography, Stress Relieving,Welding Of Vents & Drainsand Erection & Removal Of Scaffolding , The Rates For The Following Items Shall Be Inclusive Of Fabrication, Welding,Offering Stagewise Inspection. , Reducers - Butt Weld Joint - Carbon Steel , Mitre Reducers -30 Inch X 24Inch , Note: , (1) Rate For Weld Joints Of Vents & Drains Shall Be Paid On Actual Measurement Using The Applicable Sor. , Reinforcement Pad Welding , Rf Pad Welding Using E-6013 Electrode , The Job Includes Preparing Work Area For Executing Hot Work, Grinding, Fillet Welding On Plate Surfaces Using E 6013 Electrodes At All Grades & Elevations. , The Job Also Includes Supplying Of All Types Of Tools & Tackles, Machineries, All Consumables And Labour To Complete The Job In All Respects As Per Eic Instructions. , 8 Mm Thickness Using E 6013 Electrodes With Pneumatic Testing , Hydrotesting / Pneumatic Testing , The Job Involves Hydrotesting Of Pipe Lines To The Specified Test Pressure At All Elevations By Providing Necessary Hose Connections From The Source Of Water Supply To The Work Location For Preparing The Test, Flushing, Filling Up Water On The Piping Circuit, Vent Entrapped Air, Pressurised To The Required Hydro Test Pressure With Necessary Test Pumps, And Offer For Inspection Including Access And Assistance To Eic During The Checking, Draining And Drying Of The Piping Circuit. , The Job Also Includes Supplying Of All Types Of Tools And Tackles, Suitable Test Pumps, Pressure Gauges, Mechineries, All Consumables And Labour To Complete The Job In All Respects And As Instructed By Eic. , 8 Dia To 10 Dia , 18 Dia To 24 Dia , 26 Dia To 30 Dia , Non Destructive Testing , Radiography , The Job Includes Performing Radiography Examination Of Welds On Piping & All Type Of Equipments As Per Relevant Asme / Astm Standards & As Per Cpcl Specification Cpcl-Insp-Rad-01 At All Grades & Elevations With Film Width Not Less Than 4 Inches. , The Job Also Includes Supplying Of Radiation Source Camera, Other Machineries Required, All Consumables Required For Filming & Developing, Transportation Of Camera, Etc., Area Preparation Before Starting The Job, Labour, Supervision To Complete The Job In All Respects Including Preparation Of Developing Chemicals, Developing The Films & Submission Of Films For Inspection Review. , Weld Joint Size - Above 6 Nominal Dia , Dye Penetrating Testing , Performance Of Dye Penetrant Test Including Supply Of All Necessary Materials, Equipment And Labour For Carrying Out The Work As Per Specification And Directions Of Engineer-In Charge. All Materials For Dp Testing Shall Be Used Only After Clearance From Eic (Or) Inspection Resperentative Of Client. , Dye Penetration Test , Manpower Supply , Supply Of Manpower With All Tools & Tackles, Consumables, Booms, Dial Indicators, Laser Alignment Instruments, Supervision, Safety, Ppes, Etc. For Carrying Put Pre-Commssioning, Comissioning Activities, Tie-In Commissioning And Completing The Work As Per The Instruction And Complete Satisfaction Of Eic. Manpower Shall Also Be Used For Shifting Hot Tapping Machine From Cpcl Warehouse To Project Site.Oneshift/Manday Consisitng Of 12 Hrs Per Day. Contractor Shall Quote Labour Rates Accrodingly. , Quoted Rates Shall Include Payroll Cost And Allowances, Taxes, Fring Benefits, Overheads, Supervision, And Profits, Etc. These Rates Will Also Be Utilised For Computing Rates For To Compensate Extra Items, Miscellaneous Work Etc., Until Plant Take Over By Client. This Will Be Applicable Only For The Items For Which Rates Are Not Covered Under Schedule Of Rates Items Mentioned Elsewhere In This Sor. , Semi-Skilled Duringon For 12 Hrs Shift , Skilled Duringon For 12 Hrs Shift , Erection Of Valves , Erection Of Valves Including Shifting Of Valves Which Is Kept Inside Tank Dyke To The Erection Location Using Structural Arrangement (Supply Rates For The Same Is Included In Separate Sor) Which Needs To Be Erected To Mount/Fix Pulling Arrangements And Tools, Erection Of Valves At Site Including Lifting, Placing, Installing Supports At All Levels & Locations, Leveling, Aligning, Jointing With Flanges/ Welding/ Threading With The Adjoining Piping/ Piping Components, Equipment Nozzles, Placing Of Proper Gaskets, Bolting, Connecting The Systemto The Required Other System, Equipment, Pumps Etc., As Per The Drawings &Instructions Of Engineer-In-Charge And Other Related Scope. , Rates To Include The Followings , Shifting Of Mov Kept Inside The Dyke To Erection Location And Erection Of Valves,Tighting Of Glands During Commisioning Of The System/Application Of Grease, If Required, For Gear Operated Valves.& Hot Bolting Of Joints Whenever Required / As Directed By Engineer-In-Charge. , Rate Is Exclusive Of Structural Fabrication,Erection,Pedestal Construction And Transportation Of Mov Outside To Inside The Dyke. , Gate Motor Operated Valves Of 300#(Flanged) , 24 Inch , The Job Includes Transportation Of Valves, Gaskets, Fasteners, Etc., From The Owners Storage Point Or Valve Maintenance Shop, Cleaning, Checking, Tightening The Gland, Greasing & Freeing Up Etc., Servicing Of All The Fasteners Using Oil, Replacing With New Fasteners Wherever Required, Hydrotesting The Valve If Required, At The Specified Pressure At Valve Maintenance Shop,Installation Of Flanged Valve At All Heights & Grades Using Proper Gaskets & Studs. , The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Dumping The Generated Scrap Material To The Designated Area, All Consumables And Labour To Complete The Job In All Respects. , Valve Rating - 150# & 300# , Installation Of Valves - Size 8 Inch Dia. To 10 Inch Dia. , Removal Flanged Valves , The Job Includes Removal Of Flanged Valves At All Grades & Elevations By De-Bolting / Cold Cutting / Gas Cutting And Transportation Of The Valve To The Maintenance Valve Shop Or Any Other Designated Place Inside The Refinery Premises For Repair / Disposal. , The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Dumping The Generated Scrap Material To The Designated Area, All Consumables And Labour To Complete The Job In All Respects. , Valve Rating - 150# & 300# , Removal Of Valves - Size 8 Inch Dia. To 10 Inch Dia. , Supply Of Structural Steel Materials , Contractor To Supply Structural Items Including Mainly Beams,Channels,Flats,Angles,Plates Etc Of Required Size.The Rate Is Inclusive Of Transportation Upto The Job Location. , Supply Of Structural Steel Materials , Fabrication And Erection Of Structural Steel , The Job Includes Fabrication And Erection Of Carbon Steel Structurals In Position As Per Eic Instructions.Structural Arrangement Shall Be Made Near The Mov Erection Location(Derrick/Monorail Etc As Per Requirement) Andin Locations As Directed By Eic. It Is Required For Mounting The Lifting/Pulling Tools Required To Pull The Valve Which Is Kept Inside Tank Dyke To Near Erection Location/ Lifting& Erecting The Valve In Position.The Structural Arrangement Shall Be Made With Maximum Bolted Connection So That Can Be Re-Used .The Structural Fabrication And Erectionis Also Required For Mov Supports.Contractor Will Be Paid Separately For Construction Of Rcc Pedestal Required For Erection Of Structure. , The Job Includes Fabrication And Erection Of Carbon Steel Structurals In Position Such As Platforms, Ladders, Stairs, Brackets, Pipe Supports, Pipe Shoe, Using The Structural Materials Like Angles, Flats, Channels, Beams, Rounds, Plates Etc. At All Grades & Elevations. , The Job Also Includes Supplying Of All Types Of Tools & Tackles,Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects. , The Rates Shall Be Exclusive Of Supply Of Structurals, Construction Of Pedestal For Structural Erection And Transportation Of Mov Outside To Inside The Dyke/Inside Dyke To Erection Area And Dismantling Of Structural Steel. , The Rates For The Following Items Shall Be Inclusive Of Fabrication, Erection,Welding And Transportation Of Material From One Tank Location To Another , Fabrication And Erection Of Structurals , Dismantling & Removal Of Structurals , The Job Includes Dismantling Of Structural Items Erected For Shifting Of Mov Inside The Dyke To Valve Erection Location. , The Job Involves Removal Of Existing Above Ground, Overhead Structurals Including Platforms, Ladders, Gi & Steel Gratings By Unfastening / Coldcutting / Gas Cutting / Grinding, Etc., From Various Locations At All Grades & Elevations Without Damaging Any Other Portion Of The Existing Unit, Lowering Down The Same To Ground Level, Transportation Of The Same To The Designated Area Or Scrap Yard As Per The Instructions Of Engineer-In-Charge Including Weighment Of The Material At The Appropriate Place Within The Refinery Premises, If Required. , The Job Also Includes Supplying Of All Types Of Tools & Tackles,Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects. , Dismantling & Removal Of Structurals , Construction Of Rcc Pedestals , Earthwork In Excavationinall Types Of Soil ,Includingsoft Or Hard Murrum, But Excluding Soft And Hard Rock, Using Mechanical Means(Hydraulic Excavators) / Manually For Depth Upto 1.5M,Including Removal Of Vegetation, Shrubs And Debris, Cutting And Dressing Of Sides In Slopes, Levelling, Grading And Ramming Of Bottoms, Dewatering Of Accumulated/Sub-Soil Water From Any Source And Keeping The Surface Dry For Subsequent Works And Disposal Or Stacking Of Excavated Material Within A Lead Of 100M, As Directed Including Providing Temporary Supports To Existing Service Lines Like Water Pipes,Sewage Pipes, Electricunderground Cables, Etc.All Complete As Per The Specifications And Directions Of Engineer-In-Charge. , Backfilling After Execution Of The Work Toproper Grade And Level With Selected Materials From Available Excavated Soil Fromsoil Heaps Within A Lead Of 100M,Including Re-Excavating The Deposited Soil Excavated Earlier, Breaking Clods, Laying At All Depths And Heights In Layers Of Thickness Not Exceeding 150 Mm,Watering, Rolling And Ramming By Manual Methods/Mechanical Compactors , Dressing, Trimming Etc. In Foundations, Plinths,Pits Etc.All Complete As Per Directions Of Engineer-In-Charge. , Supplying And Filling Approved M Sand Of Specified Quality Under Floors, Plinths, Foundations Etc. For All Depthsincluding The Cost Of Sand, Labour Charges,Tools And Tackles,Royalties, Transportation To Site For All Leads And Lifts, Including Loading, Unloading, Spreading In Layer Not Exceeding 150 Mm, Watering, Ramming, Compacting With Mechanical Compactors And/ Or Other Equipment To Specified Levelall Complete As Perspecifications And Directions Of Engineer-In-Charge. , Providing And Laying Plain Cement Concrete (Pcc)1:4:8 By Volume(1Cement : 4 M Sand:8 Coarse Aggregate) With Opc 53 Grade And 40Mm & Down Size Graded Crushed Stone Aggregates For All Depths Wherever Required Like In Foundations, Fillings ,Floors,Pavements & Ramps Or Any Other Works Etc., Including Shuttering, Tamping, Ramming, Vibrating, Curing, Etc. All As Specified In Any Shape, Position, Thickness And Finishing The Top Surface Rough Or Smooth As Specified And Directed All Complete Including Cement Cost Etc, All Complete As Directed By Engineer-In-Charge. , Providing And Laying Of Reinforced Cement Concrete (Rcc) 1:1.5:3 By Volume (1Cement: 1.5 M Sand:3 Aggregate) With Opc 53 Grade And 20Mm And Down Size Graded Crushed Stone Aggregate Materials For Sub Structure Upto Plinth Beam Levelfor All Depths Including Pavement, Machine Mixing, Curing, Consolidating With Vibrator, Cement Cost Etcall Complete As Per Instructions Of Engineer-In-Charge Excluding Cost Of Shuttering And Reinforcement. , Same As Above Sor Item No:112,But For Super Structure At All Heights Above Plinth Beam Level. , Providing,Fixing Formwork Including Centering, Shuttering ,Strutting And Propping In Sub Structure At All Depths Wherever Required Including Removal Of The Shuttering After The Specified Period Is Over And As Directed By The Engineer- In- Charge Complete With All Materials, Labour, Consumables Etc.(Form Work Shall Be Supplied By The Contractor And Shall Remain The Property Of The Contractor) , Providing, Fixing Formworkincluding Centering, Shuttering ,Strutting And Propping Insuper Structure At All Heightswherever Required Including Removal Of The Shuttering After The Specified Period Is Over And As Directed By The Engineer- In- Charge Complete With All Materials, Labour, Consumables Etc.(Form Work Shall Be Supplied By The Contractor And Shall Remain The Property Of The Contractor) , Supplying, Fabricating And Placing In Position High Strength Deformed Steel Bar Reinforcement(Conforming To Is 1786, Grade Fe500) For Rcc Work, Straightening, Cleaning, Decoiling, Cutting, Bending To Required Shapes And Lengths As Per Details, Binding With Contractors Own 16 Standard Wire Gauge(Swg) Black Soft Annealed Binding Wire At Every Intersection, Supplying And Placing With Proper Cover Blocks, Supports, Overlaps, Welding Spacers, Lifting Hooks Etc For All Heights & Depths Etc. Removing Of Scraps From Site, All Complete As Directed By Engineer-In-Charge. , Transporting & Disposing The Surplus Earth & Debris Including Shrubs And Vegetations From Construction Area (Beyond The Initial Lead Of 100M) To The Designated Area Outside The Refinery Premises Up To A Lead Of 7Km (Vaikkadu Village) Including Re-Excavating The Deposited Soil Excavated Earlier, Transportation, Loading, Unloading, Laying At All Depths & Heights, Stacking, Levelling And Dressing Both Areas (Viz., From Where The Earth Is Transported And Where It Is Deposited) To Required Levels And Slopes Complete With All Lifts As Directedby Engineer In Charge.( Note: If Measured By Stacks 30%Voids Will Be Deducted.) , Hiring Of 150Mt Or Higher Crane , Hiring Of 100 Ton (Or Above) Capacity Crane (1No.).Minimum Requirement The Crane Should Be Capable Of Handling A Minimum Load Of 3 Mt At A Radius Of 25 M With A Boom Length Of 40 M Or Above. Job Involves 1) Hiring Of 1 No. 100 Mt Or Higher Crane. 2)The Unit Of Measurement Shall Be Considered As One Day Of 24 Hrs/Day 3)Crane Operator/Supervisor/Helper Will Remain All The Time In Touch With Eic For Allotment Of Day To Day Job 4)Manpower I)Crane Operator-1 No Per Shift Ii)Helper For Operator – 1 No. Per Shift. Iii) Supervisor - 1 No. Per Shift Job Involves Reporting Of The Crane Operator, Helper And Supervisor To Eic At 7.30 Am & 7.30 Pm And Take The Instructions From Eic. Engagement Of The Crane As Per Site Requirement/As Per The Direction Of Eic On Round The Clock Only Basis. Note: Unit Day Represent 1Shift Of 24 Hrs. The Supply Of Diesel Required For Crane Operations Is In Contractor Scope. The Crew Food And Accomodation Is In Contractors Scope. Hiring Period Starts From The Time Crane Reaches The Site, Assembled, Carrying Out Load Site And Crane Supervisor Reports The Crane Is Ready For Use To Eic. The Vendor Shall Submit Valid Inspection Certificate From Tpi(Third Party Inspection Agency) For The Crane. Hiring Period Ends Time For The Crane When The Crane Is Released By Eic. Any Crane Breakdown Time Shall Be Reported To Eic And The Same Shall Be Deducted From The Hiring Time.The Rate Shall Be Inclusive Of Mobilisation And De-Mobilisation Charges. => Limited

Key Value

Document Fees
Refer document
EMD
INR 46000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail