|
| 1 | Wireless Controller with technical specifications as per Annexure-A |
| 2 | Wireless Access Points with technical specifications as per Annexure-A, Sr. No. 2 |
| 3 | Wireless Access Points with technical specifications as per Annexure-A, Sr. No. 3 |
| 4 | 24 Port POE Switchwith technical specifications as per Annexure-A |
| 5 | 12 Port LIU Kit with PIGTAIL LC single mode fully loaded with technical specifications as per Annexure-A |
| 6 | 1G OFCModule/Transceiver with technical specifications as per Annexure-A |
| 7 | 6 Coresingle mode Optical Fibre Cable with technical specifications as per Annexure-A |
| 8 | OFC Patch Chord single mode with technical specifications as per Annexure-A |
| 9 | HDPE Pipe 1 inch |
| 10 | 1 KVA Offline UPS with technical specifications as per Annexure-A |
| 11 | 24 PortLayer L2 Switch with technical specifications as per Annexure-B |
| 12 | Fibre Distribution box 6 Core Fully loaded including SC type pigtail and other necessary accessories |
| 13 | OFC Patch Chord single mode with technical specifications as per Annexure-B |
| 14 | Wireless Controller configuration &installation |
| 15 | Wireless Access Point configuration & installation |
| 16 | Fixing PVC conduit in a groove on surface/wallbymaking groove in surface/wall bycutting the surface/wallandmaking good the same byfilling POP including supply of 0.5 inch or 1 inch PVC conduit and all other required fixtures and accessories |
| 17 | Supplying and drawing 4 pair un-shielded twisted pair (UTP), 0.5 mm PVC insulated copper conductor un-armoured Cat-6 computer cable FRLS in existing surface/concealed, steel/PVC. conduit/ casing-n-capping as required. |
| 18 | Laying of Optical Fibre Cable in PVC conduit. |
| 19 | Laying of Optical Fibre Cable in PVC casing caping with all required fixtures and accessories. |
| 20 | Laying of underground Optical Fibre Cable in HDPE pipe at 1.5 feet depth by digging soilincluding all fixtures & accessories with tools & tackles etc. required for laying.After laying of OFC, bringing the landetc. to its original state by filling soil or cementing etc. |
| 21 | Laying of underground Optical Fibre Cable in HDPE pipeat one feet depth by digging roadincluding all fixtures & accessories withtools & tackles etc. required for laying.After laying of OFC, bringing the road to its original state by filling soil or cementing etc. |
| 22 | Laying of Optical Fibre Cable under false cellingin 0.5 inch /1 inch PVC pipe including all fixtures, accessories & 0.5 PVC pipe with tools & tackles etc. required for laying. |
| 23 | Supply, installation testing and commissioning of 19\" modular patch - 1 U patch panel 24, RJ 45 cat-6 connector |
| 24 | 12 Port LIU Kit installation with splicingincluding all accessories |
| 25 | Supply, installation testing and commissioning of wall mounting rack, for computer switches complete as mentioned below :-9U cabinet 500X600X500, wall mounting with 6 point 5 Amp. socket power supply strip and fan, tray |
| 26 | Supply, installation testing and commissioning of patch cord as mentioned below :- CAT 6 RJ45 patch cord UTP 1 metre |
| 27 | Laying of Optical Fibre Cable in HDPE pipe by fixing HDPE on wall/ Cable duct includingall fixtures & accessories with tools & tackles etc. required for laying. |
| 28 | Supply &fixing cable route marker round/square size 100mm, 5mm. thick, G.I. Plate duly bolted/welded on 35mm x 35mm x 5mm angle iron 60cm long including excavation, grouting in cement concrete 1:2:4 (1cement and 2 coarse sand: 4 graded stone aggregate 20mm nominal size) foundation of size 20cm x 20cm x 30cm duly embedded in ground 30cm depth or as required. |
| 29 | Configuration of24 PortLayer L2Switch allowing only Internet traffic |
| 30 | NOTE: 1.Transit Insurance shall be in the scope of NHDC Ltd.2. Bidder should quote unit basic rate inclusive of packing, forwarding, handling and frieght charges for F.O.R. Omkareshwar Power Station in column no. 5. 3 Bidder shall quote unit CGST, SGST amount in column no. 6 &7 respectively for intra-state supply and shall quote IGST amount in column no. 8 for inter-state supply.4.Bidders are requested to verify carefully the amount entered by them in respective column and the amount generated automaticallythrough formulae before uploading it to the portal. |