Supply Of 115V Ac Ups Supply Of 115V Ac Ups For Numaligarh Refinery Expansion Project , Rating Of 115V Ac Ups From 40Kva To 100Kva, 1Ph , Ac Ups System (Srr 9), 115V, 100% Parallel Redundant Ups With Common Bypass. 115V,50Hz, 100Kva, 1Ph, 0.8Pf, Ac Ups System Consisting Of 2X100% Parallel Redundant Configuration With Common Bypass, Including Condition Monitoring As Detailed In The Specification Tp-1Zzzael- Spe-0017 & Cell Booster, As Per Typical Sld & As Per Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning, , Ac Ups System (Lcr), 115V, 100% Parallel Redundant Ups With Common Bypass. 115V,50Hz, 40Kva, 1Ph, 0.8Pf, Ac Ups System Consisting Of 2X100% Parallel Redundant Configuration With Common Bypass, Including Condition Monitoring As Detailed In The Specification Tp-1Zzzael- Spe-0017 & Cell Booster, As Per Typical Sld & As Per Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning, , Ac Ups System (Srr 10), 115V, 100% Parallel Redundant Ups With Common Bypass. 115V,50Hz, 60Kva, 1Ph, 0.8Pf, Ac Ups System Consisting Of 2X100% Parallel Redundant Configuration With Common Bypass, Including Condition Monitoring As Detailed In The Specification Tp-1Zzzael- Spe-0017 & Cell Booster, As Per Typical Sld & As Per Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning, , Ac Ups System (Cr 2), 115V, 100% 100% Parallel Redundant Ups With Common Bypass. 115V,50Hz, 60Kva, 1Ph, 0.8Pf, Ac Ups System Consisting Of 2X100% Parallel Redundant Configuration With Common Bypass, Including Condition Monitoring As Detailed In The Specification Tp-1Zzzael- Spe-0017 & Cell Booster, As Per Typical Sld & As Per Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning, , Ac Ups System (Ac Distribution Panel) Lcr, 115V Ac, Single Front, Non-Draw Out, Compartmentalized Db For Ac Ups Having Two Incomer And Outgoers As Per Feeder List & Requisition Documents And Shall Include Testing After Erection,Pre-Commissioning & Commissioning, , Ac Ups System (Ac Distribution Panel) Srr 9, 115V Ac, Single Front, Non-Draw Out, Compartmentalized Db For Ac Ups Having Two Incomer And Outgoers As Per Feeder List & Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning, , Ac Ups System (Ac Distribution Panel) Srr 10, 115V Ac, Single Front, Non-Draw Out, Compartmentalized Db For Ac Ups Having Two Incomer And Outgoers As Per Feeder List & Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning, , Ac Ups System (Ac Distribution Panel) Cr 2, 115V Ac, Single Front, Non-Draw Out, Compartmentalized Db For Ac Ups Having Two Incomer And Outgoers As Per Feeder List & Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning, , Battery Set For Ups System, Vented Ni- Cd Type Set Of Ni-Cd Type Battery Bank (2 X 100%) As Per The Duty Cycle Attached Part Of The Requisition Along With Battery Rack And Other Accessories As Per Sld & Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning, , Battery Set For Ups System, Vented Ni- Cd Type Set Of Ni-Cd Type Battery Bank (2 X 100%) As Per The Duty Cycle Attached Part Of The Requisition Along With Battery Rack And Other Accessories As Per Sld & Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning, , Battery Set For Ups System, Vented Ni- Cd Type Set Of Ni-Cd Type Battery Bank (2 X 100%) As Per The Duty Cycle Attached Part Of The Requisition Along With Battery Rack And Other Accessories As Per Sld & Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning, , Battery Set For Ups System, Vented Ni- Cd Type Set Of Ni-Cd Type Battery Bank (2 X 100%) As Per The Duty Cycle Attached Part Of The Requisition Along With Battery Rack And Other Accessories As Per Sld & Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning, , Miscellaneous Battery Isolation Breaker For Each Battery Bank - Flame Proof (Ex-D) Suitable For Installation In Gas Group Ii-C As Per Sld & Requisition Documents For All The Above Battery Banks Supplied In This Lot (8 Nos.) , Copper Cables And Accessories Like Lug And Gland, Etc. For Interconnection Of Ups System And Its Acdb & Ups System And Its Battery - As Per Sld & Requisition Documents For All The Above Ups System Supplied In This Lot.Refer Note 16 Of Sos , Special Tools And Tackles As Per Manufacturer’S Recommendation For The Above 115V Ac Ups , Special Tools And Tackles As Per Manufacturer’S Recommendation For The Above 115V Ac Ups Battery Bank. Other Accessories (Like Aprons And Gloves) For Safe And Proper Commissioning, Operation And Maintenance Of The Battery Bank. , Special Tools And Tackles As Per Manufacturer’S Recommendation For The Above 115V Acdb , Pre-Commissioning / Commissioning / Start-Up Spares As Per Manufacturer’S Recommendation For The Above 115V Ac Ups , Pre-Commissioning / Commissioning / Start-Up Spares As Per Manufacturer’S Recommendation For The Above 115V Ac Ups Battery Bank , Pre-Commissioning / Commissioning / Start-Up Spares As Per Manufacturer’S Recommendation For The Above 115V Acdb , Training To 2 Nos. Of Owner Personnel At Oem’S Factory For 1 Week For The Entire Package (Including Condition Monitoring). , Training To 10 Nos. Of Owner Personnel At Nrep Site For 1 Week For The Entire Package (Including Condition Monitoring). , Bidder Shall Provide Per Diem Rate For Supervision Services For Installation Of The Entire Package And For Commissioning / Support Engineer From Oem Shall Be Stationed At Nrep Site For The Duration Of 1 Month From The Date Of Commissioning & Handover For The Entire Package , Cost For Additional Warranty Period Of 24 Months After Commissioning Or 36 Months After Dispatch Whichever Is Earlier” ( As Per Note 12)