| 1 | CLEAR WATER PUMPING MACHINERIS |
| 2 | Operation, guarding of 4nos. (2W + 2S) each of 260 KW + 4Nos.(2W+ 2S) each of 225 KW +2Nos.(1W+ 1S) each of 30KWClear water pump pumping machinerys, 2 nos Dewatering water pumps,L.T. PDB panel cum MCC panels of individual Soft starter panels, Pump Control Panel, along withother accessories and electrical gadgets, actuator operated butterfly valves, flow meters, level indicators etc an inside the WTP pumping station and internal and external illumination complete withall other electrical accessories and ancilliariesfor round the clock supply of drinking water by engaging 4(Four) nosoperating personnelas per direction of E.I.C(w.e.f. 01-02-2022 to 31-01-2024) |
| 3 | Waste Water Recycle pumping machineries |
| 4 | Operation, guarding2 nos 13 KW Waste Water Recycle Pumps, with Pump Control Panel, and other accessories and ancilliariesfor round the clock supply of drinking water by engaging 1(One) no operating personnelas per direction of E.I.C |
| 5 | Back wash pumping machineries |
| 6 | Operation, guarding2(two) nos 30 KW Waste Water Recycle Pumps, with Pump Control Panel, and other accessories and ancilliariesfor round the clock operation by engaging 1(One) no operating personnelas per direction of E.I.C |
| 7 | Waste Water Sludge Transfer pumping machineries |
| 8 | Operation, guarding 2(two) nos 13 KW Waste Water Sludge Transfer Pumpswith Pump Control Panel, along withother accessories and ancilliariesfor round the clock operation by engaging 1(One) no operating personnelas per direction of E.I.C |
| 9 | Day to day maintenance for upkeepment of all electrical & mechanical installation by engaging licensed electrician / machanic/ skilled/unskilled labour as and when required by providing all necessary material viz. gland packing for pumps and sluice valves, replacements of indicating lamp with holder,periodic lubrication of motor bearings, O ring/ rubber gasket of chlorination system etc. as per direction of E.I.C.with the all required tools tackles, measuring instruments etc. required to execute minor maintenanceworks. (w.e.f. 01-02-2022 to 31-01-2024) |
| 10 | SUB-STATION |
| 11 | Operation & Guardingof outdoor Sub-Station for Transformer 33/0.433. KV (2000 KVA-2nos+ 50KVA 380-420V, lighting transformer two nosand62.5 KVA D.G Set 1 nos along with Sub-Station equipment’s and other allied accessories including operation of HV Panel Boards, PDB, Control Panel Board, Capacitor Banks, 110 Volt DC trip circuit with batteries, battery charger etc. also operation of LV panel board for illumination arrangement by engaging suitable operating personne as per direction of E.I.C. (w.e.f. 01-02-2022 to 31-01-2024) |
| 12 | Routine and periodical maintenance of PDB panel board, VCB Panel cables, capacitors, transformer, battery with battery charger, CT & PTs earthing system all breakers, tightening nuts & bolts of bus bar, replacement of control fuses, indicating lamp with holder etc. as per direction of E.I.C.(w.e.f. 01-02-2022 to 31-01-2024) |
| 13 | Servicing, testing and calibration of different relays, breakers and cleaning of carbon shoots from bus bar, breaker, meter CT & PT chamber etc. for smooth operation of the Sub-Station and Pump meters etc by any testing Agency approved by WBSEDCL or Directorateof Electricity Board as per scope of work.(Twice in a year)N.B- All test report and calibration certificate are to be submitted(w.e.f. 01-01-2023 to 31-12-2023) |
| 14 | GASEOUS CHLORINATION PLANT AT CLEAR WATEROperation & guarding of gaseous chlorination system two(2) Set installed at site for feeding chlorine gas in the drinking water for disinfection of the same by engaging 3(Three) nosoperating personnelas per direction of E.I.C(byDep’t.supplied Chlorine Gas )(w.e.f. 01-02-2022 to 31-01-2024) |
| 15 | Supervision charges for Gas Plant by Gas Plant Supervision and the cost of visit charges of the Gas Plant Supervisor at least two day in a month along with expart technician for servision of the installation for the above period as per direction of E.I.C |
| 16 | Supply of HSD and lubricants at site including all carriage and storage for running 62.5KVA Diesel engine as an when requred as per direction of E.I.C and entry in the log book (w.e.f. 01-02-2022 to 31-01-2024) |
| 17 | For D.G Set No- I |
| 18 | Routine & Periodical inspection by electrical supervisor having valid suprevisor\"s certificate of competency from directorate of Electricity (Licensing board), Govt. of WestBengal or under any other State Government of India along with Pump Technician / Supervisorfor checking of Pumping station, D.G Set, L.T and H.T equipments,MCC/ Starter panels for all pumping machineries, indoor & out door lighting , valves with actuators along withall other electro mechanical installation e.g. level indicator, flow meterto keep the system in healthy condition.N.B-Minimum 2 day in a month and each visit should be recorded in the log book (with date and time) to be supplied by the agency and kept in the pump house building .(w.e.f. 01-02-2022 to 31-01-2024) |
| 19 | Supervision charges for Sub-Station and electrical installation by licensed electrician having requisite parts as per IE rules, 1956 with latest amendments and overhead expenditures for the above periodN.B-Minimum 2 day in a month and each visit should be recorded in the log book (with date and time) to be supplied by the agency and kept in the pump house building(w.e.f. 01-02-2022 to 31-01-2024) |
| 20 | Cleaning ofPump House,Substationand its surroundings by engaging sweeper in regular manner by providing all necessary material viz. cotton duster, broom sticks, batteries,carbolic acid, detergent soap, gloves, apron including all tools tackles,etc. required as per direction of E.I.C.(w.e.f. 01-02-2022 to 31-01-2024) |
| 21 | INTAKE (RAW WATER) PUMPING STATION |
| 22 | Operation and guarding ofall vertical turbine pumping machinery each having motor capacity of 110 KW including others pumps, L.T. PDB panel , MCC Panel individual Soft starter panels,electrical gadgets, actator operated butterfly valves, flow meters, level indicators etc installed atintake pumping station and internal & external illumination complete withall other electrical accessories and ancilliariesfor round the clock supply of waterand Operation and guarding of 11/0.433. KV outdoor Sub-Station (400 KVAX 2nos) includinglighting transformer,Sub-Station equipment’s ,10 KVA D.G Set and other allied accessories including operation of LV Panel Boards, Control Panel Board, Capacitor Banks, 110 Volt DC trip circuit, battery charger etc. also operation of LV panel board for lighting arrangement by engaging 3(Three)nos operating personnel as per direction of E.I.C(w.e.f. 01-02-2022 to 31-01-2024) |
| 23 | Routine and periodical maintenance of pumps, motors, valves with actuators, tightening of nut bolt of sluice valve, air valve, dismantling joint etc. including replacements of indicating lamp with holder, replacement of gland packing for pumps and sluice valves with proper lubrication of motor bearings etc. as per direction of E.I.C. (w.e.f. 01-02-2022 to 31-01-2024) |
| 24 | Supervision charges for electrical installation by licensed electrician having requisite parts as per IE rules, 1956 with latest amendments and overhead expenditures for the above period(w.e.f. 01-02-2022 to 31-01-2024) |
| 25 | Servicing, testing and calibration of Transformer, different relays, breakers and cleaning of carbon shoots from bus bar, breaker, CT & PT chamber etc. for smooth operation of the Sub-Station by any testing Agency approved by WBSEDCL or Directorateof Electricity Board as per scope of work. as per scope of work. (twice in a year)N.B- Report for all Testing & Servicing certificate to be submitted(w.e.f. 01-02-2022 to 31-01-2024) |
| 26 | Supply of HSD and lubricants at site including all carriage and storage for running(10 KVA) diesel engine as an when requred as per direction and as per log book (w.e.f. 01-02-2022 to 31-01-2024) |
| 27 | Cleaning ofPump House,Substation , and its surroundings by engaging sweeper in regular manner by providing all necessary material viz. cotton duster, broom sticks, batteries,carbolic acid, detergent soap, gloves, apron including all tools tackles,etc. required as per direction of E.I.C.(w.e.f. 01-02-2022 to 31-01-2024) |