Item Rate Contract Tender Of Pmksy Wdc 2.0 Project No. - 01, Village Name – Mindhiyari-1 Jungle Clearance ( Ganda Baval Etc ) Of Light / Heavy Dance ( Work Done By Manually Or By Machinery ) Including Grabbing Of & Removing The Roots & Girth Completely From The Ground & Back Fill With Earth & Making Surface Good As Directed Including Depositing & Removing The Material Away From The Site Of Work At Own Risk And Cost As And Where Directed Etc Completed For Following. ( A ) Light Density ( Irrigation Sor 2015-16, Ch -08, Item- No. 32 ) 2 Quarrying, Transporting & Spreading Selected Materials From Borrow Area For Raising Of Embankment Work In Homogeneous Section In Uniform Layers Of Specified Thickness ( Up To 23Cm ) As Directed Including Dressing Breaking Clods And Dry Rolling Of Earth Work With Light Rollers Of Upto 2.0 Tones Capacity As Directed With All Lift Etc Complete. ( Irrigation Sor 2015-16, ( Ch - 01, Item No. 6 - Ch 01, Item No.11 - Ch - 01, Item No. 12 + Ch 06 Item No. - 6 ( 73.00 - 7.40 - 6.80 + 4.60 = 63.40 ) 3 Excavation In All Sort Of Strata And Formations Incl. Depositing The Unuseful Excavated Stuff As And Where Directed Including Sorting And Stacking Useful Materials As Directed Up To 200 Mt Lead And All Lift Etc. Complete Incl. Dewatering. ( Irrigation Sor 2015- 16, Ch -05, Item- No. 1 ) ( A ) In Overburden Incl. Hard Murrum. ( B ) In Soft Rock. ( C ) In Hard Rock. 4 Prov. & Laying In Position Nominal Mix Cement Concrete Using Cement , Sand & H.B.Metal By Mass And Machine Mix For Pcc Including Necessary Formworks, Compaction, Raming, Curing As Directed With All Lead And Lift Etc Complete. For Foundation Concrete / Other General Purpose A ) Concrete ( 1:3:6 ) Metal Size- 63Mm ( Cement Level 220 Kg / Cum ) 5 Prov. & Laying In Position Cement Concrete Using Cement, Sand And Crushed Metal Coarse Aggregate And Machine Mix For Pcc / Rcc Including Necessary Formworks Compaction By Vibrator, Curing As Directed With All Lead & Lift Etc Complete. ( Excluding Cost Of Steel ) For .Body Wall, Apron, Training Wall, Side Wall, Splay Wall, Key Wall, Cut Of Wall Etc. ( 4-A ) Controlled Concrete Grade M-15 And Msa-40Mm ( Irrigation Sor 2015-16, Ch-5, Item No. 4 ) 6 Cement Plaster 20Mm Thick In Single Coat To Stone Masonry In C.M. 1:3 Incl Finishing, Curing, Scaffolding Etc Complete. 7 Providing And Laying Dry Rubble Stone Pitching Without Base , Inverted Filter / Murrum Bedding And Header Stone Including Hand Packing & Trimming & Dressing Slopes Etc Complete. ( Irrigation Sor 2015- 16, Ch-1, Item No. 16 ) ( A ) 15 Cms Thick Stone Pitching ( A ) 23 Cms Thick Stone Pitching 8 Providing And Fixing In Position White Marble Plate Of Size 45X45x1.8 Cm Including Engravings The Letters As Per Drawing / As Directed Etc Complete. ( Irrigation Sor 2015-16, Ch-5, Item No. 17 ) 9 Transporting Including Rehandling And Spreading Of The Useful Excavated Materials Of C.O.T Spillway Foundation, Approach Channel, Tail Channel, Hr, Inspection Road, Approach Road, Etc For Embankment Raising Including Spreading In Uniform Layers Of Specified Thickness, Dressing, Breaking Clods & Rolling At Requisite Moisture Content To Required Dry Density With Suitable Type Of Roller And Watering At Omc For Lead Upto 1.0 Km And All Lift Etc Complete. 10 Quaring, Transporting & Spreading Selected Materials From Borrow Area For Raising Of Embankment Work In Homogeneous Section In Uniform Layers Of Specified Thickness ( Up To 23Cm ) As Directed Including Dressing Breaking Clods And Rolling At Requisite Moisture Contents To Required Dry Density With Roller Of Suitable Type And Watering At Omc For Lead Upto 1.0 Km And All Lifts Etc Complete. 11 Quarring, Trasporting & Laying Horizontal And Inclind Sand Filter Of Required Gradation In Earthen Dam In Layers Of Specified Thickness Incl.Required Watering , Light Rolling For All Lead And Lift Etc Complete. 12 Watering Charges For Consolidation At Omc Inclusive Of All Cost Of Materials And Labour With All Lead And Lifts Etc Complete. 13 Compaction Of Embankment Work At Requisite Moisture Content To The Required Dry Density Using Rollers Of Suitable Type At Omc Standard Inclusive Of Necessary Spreading, Dressing, Rolling As Directed With All Lead And Lifts Etc Complete. 14 Quarring, Transporting And Laying Rock Fill For Rock Toe Using Hard Stone In Layers Directed Including Graded Filter, Necessary Hand Packing Of Stones For Adjusting Sides To Correct Design Slopes Etc Using Light Hammer Driven Wedges Between Rubble On Exposed Face For Lead Upto 1.0 Km And All Lifts Etc Comp. 15 Providing H.Y.S.D. Bar Reinforcement For R.C.C. Work Including Bending, Binding And Placing In Position Complete Upto Floor Two Level 16 Providing Tmt Bar Fe 415 Reinforcement For R.C.C. Work Including Bending, Binding And Placing In Position Complete Upto Floor Two Level 17 Providing And Laying Cement Concrete 1:2:4 ( 1- Cement : 2- Coarse Sand : 4- Graded Stone Aggregates 20 Mm Nominal Size ) And Curing Complete Excluding Cost Of Formwork In ( B ) Independent Piers, Columns, And Pillars, Upto Floor Two Level 18 Precast Concrete Block Masonry ( Including Quoin Blocks Jamb Blocks Closer Etc. ) With Solid Concrete Blocks Of Approved Size Made Of Cement Concrete 1:3:6 Mix ( 1- Cement : 3 Coarse Sand: 6- Graded Stone Aggregates Of 20 Mm And Down Grade ) In Foundation And Plinth Cement Morter 1:6 19 50Mm Thick Puf Insulated Continuous Sandwich Panels ( 0.50 Mm Thick Pre Coated Gi Sheet On Both Side Of Polyurethane Foam With External Face Being Corrugated ) 20 Structural Steel Work ( Confirming To Is 4923-1997 ) Riveted, Bolted Or Welded In Builtup For All Type Sections, In Framed Work, Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer All Complete As Per The Structural Designs And Directions Of Engineer In Charge.Column ( 122 X 61 X 3.6Mm ) 21 Excavation In All Sort Of Strata And Formations Incl. Depositing The Unuseful Excavated Stuff As And Where Directed Incl Sorting And Stacking Useful Materials As Directed Upto 30 Mt Lead Etc. Complete Incl. Dewatering. ( For All Type Canal & Foundation Trenches Of C.D. Works ) In Overburden Incl. Hard Murrum.