|
| 1 | WHARFAGE CHARGES AS PER PREVAILING PORT TARIFF (ACTUAL) |
| 2 | FOR ROAD DESPATCHES : AGENCY WORK & CUSTOM CLEARANCE, MANUAL STEVEDORING (INCLUDING LOADING OF MATERIAL INTO TRUCKS/DUMPERS AT WHARF), LOCAL SHIFTING OR TRANSPORTATION OF MATERIAL UP TO SILO/SHED, MECHANICAL OR MANUAL BAGGING , STANDARDISATION (IN 50 KG NET WEIGHT), MACHINE STITCHING (INCLUSIVE THREADS) , STACKING OF BAGS., DE-STACKING AND LOADING OF BAGSIN TRUCKS WITH DOCUMENTATION FOR OUTSTATION DELIVERYFOR ROAD DESPATCHES INCLUDING SUPERVISION BY SURVEYOR(RATE IN RS. PER MT) |
| 3 | FOR RAIL DESPATCHES :AGENCY WORK & CUSTOM CLEARANCE, MANUAL STEVEDORING (INCLUDING LOADING OF MATERIAL INTO TRUCKS/DUMPERS AT WHARF), LOCAL SHIFTING OR TRANSPORTATION OF MATERIAL UP TO SILO/SHED, MECHANICAL OR MANUAL BAGGING , STANDARDISATION (IN 50 KG NET WEIGHT), MACHINE STITCHING (INCLUSIVE THREADS), STACKING OF BAGS., DE-STACKING, LOADING IN TRUCKS, SHIFTING TO RAILWAY PLATFORM BY TRUCKS,UNLOADING AND STACKING ON PLATFORM, DESTACKING AND LOADING IN TO WAGONS WITH DOCUMENTATIONS (MULTI PRODUCTS AT ANY RAKE POINT, INSIDE/OUTSIDE RAIL DESPATCHES INCLUDING SUPERVISION BY SURVEYOR/REPRESENTATIVE UPTO DESTINATION POINT. (RATE IN RS. PER MT) |
| 4 | RAILWAY TERMINAL CHARGES -(RATE IN RS. PER MT) |
| 5 | PORT ROYALTY CHARGES - (RATE IN RS. PER MT) |
| 6 | DUNNAGE CHARGES FOR RAIL DESPATCHES (RATE IN RS. PER MT) |
| 7 | PORT RAILWAY USAGE CHARGES (PRTUC) OR WAGON HAULAGE CHARGES FOR CLOSED WAGONS)RATEIN RS. FOR 54 MT PER WAGON , IF ANY. |
| 8 | POLLUTION CHARGES (RS/MT)-(IF ANY) |
| 9 | SERVICE CHARGES (RS/MT) -(IF ANY) |
| 10 | ANY OTHER CHARGES (RS/MT) -(IF ANY) |
| 11 | GODOWN RENT(FIRST 30 DAYS FREE FROM THE DATE OF BERTHING OF THE VESSEL ). FROM THE 31st DAY TO 45th DAYFOR A COVERED STORAGE FOR 15 DAY PERIOD OR PART THERE OF (RENT inRs./MT) |
| 12 | GODOWN RENT (FIRST 30 DAYSFREE FROM THE DATE OF BERTHING OF THE VESSEL) . FROM THE 46th DAY TO 60th DAY FOR A COVERED STORAGE FOR 15 DAY PERIOD OR PART THERE OF (RENT inRs./MT) |
| 13 | GODOWN RENT ( FIRST 30 DAYSFREE FROM THE DATE OF BERTHING OF THE VESSEL) . FROM THE 61stDAY TO 75th DAY FOR A COVERED STORAGE FOR 15 DAY PERIOD OR PART THERE OF (RENT inRs./MT) |
| 14 | GODOWN RENT (FIRST 30 DAYS FREE FROM THE DATE OF BERTHING OF THE VESSEL) . FROM THE 76thDAY TO 90 th DAY FOR A COVERED STORAGE FOR 15 DAY PERIOD OR PART THERE OF (RENT inRs./MT) |
| 15 | GODOWN RENT ( FIRST 30 DAYSFREE FROM THE DATE OF BERTHING OF THE VESSEL) . FROM 91st DAY AND ABOVE FOR A COVERED STORAGE (RENT inRs./MT) |
| 16 | RENT FOR OPEN SPACE (FIRST 30 DAYSFREE FROM THE DATE OF BERTHING OF THE VESSEL) . FROM THE 31st DAY TO 45th DAY FOR A PERIOD OF 15 DAYS OR PART THERE OF (RENT inRs./MT) |
| 17 | RENT FOR OPEN SPACE (FIRST 30 DAYSFREE FROM THE DATE OF BERTHING OF THE VESSEL) . FROM THE 46th DAY TO 60th DAY FOR A PERIOD OF 15 DAYS OR PART THERE OF (RENT inRs./MT) |
| 18 | RENT FOR OPEN SPACE (FIRST 30 DAYSFREE FROM THE DATE OF BERTHING OF THE VESSEL) . FROM THE61stDAY TO 75th DAY FOR A PERIOD OF 15 DAYS OR PART THERE OF (RENT inRs./MT) |
| 19 | RENT FOR OPEN SPACE (FIRST 30 DAYSFREE FROM THE DATE OF BERTHING OF THE VESSEL) . FROM THE76thDAY TO 90th DAY FOR A PERIOD OF 15 DAYS OR PART THERE OF (RENT inRs./MT) |
| 20 | RENT FOR OPEN SPACE ( FIRST 30 DAYSFREE FROM THE DATE OF BERTHING OF THE VESSEL) . FROM 91st DAY AND ABOVE FOR A OPEN SPACE(RENT inRs./MT) |