}

Tender For Procurement Of Pre-Stressed Concrete Sleepers Of Various Types, Secunderabad-Telangana

South Central Railway has published Tender For Procurement Of Pre-Stressed Concrete Sleepers Of Various Types. Submission Date for this Tender is 20-01-2023. Railway Ancillaries Tenders in Secunderabad Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

35394303
Tender For Procurement Of Pre-Stressed Concrete Sleepers Of Various Types
Open Tender
Indian
Telangana
Secunderabad
20-01-2023

Tender Details

Supply Of Procurement Of Pre-Stressed Concrete Sleepers Of Various Typesprocurement Of Pre-Stressed Concrete Sleepers Of Various Types,Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleeper (Pre-Tensioned Type) For Broad Gauge (1673Mm) As Per Rdso Design For 1 In 12 Psc Turnout Sleepers (Sets) To Rdso Drg. No. Rdso/T- 4218 With Latest Alterations/Amendments And To Irs Specifications No. T-45-(4Th Revision) March 2021 With Latest Amendments / Alterations Made By Track Standard Committee As Amended Time To Time During The Currency Of The Contract, Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleeper (Pre-Tensioned Type) For Broad Gauge (1673Mm) As Per Rdso Design For 1 In 8.5 Psc Turnout Sleepers (Sets) To Rdso Drg. No.Rdso/T-4865 With Latest Alterations/Amendments And To Irs Specifications No. T-45-(4Th Revision) March 2021 With Latest Amendments / Alterations Made By Track Standard Committee As Amended Time To Time During The Currency Of The Contract, Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleeper (Pre-Tensioned Type) For Broad Gauge (1673Mm) As Per Rdso Design For 1 In 8.5 Psc Turnout Sleepers (Sets) To Rdso Drg. No.Rdso/T-4865 With Latest Alterations/Amendments And To Irs Specifications No. T-45-(4Th Revision) March 2021 With Latest Amendments / Alterations Made By Track Standard Committee As Amended Time To Time During The Currency Of The Contract, Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleeper (Pre-Tensioned Type) For Broad Gauge (1673Mm) As Per Rdso Design For 1 In 8.5 Psc Turnout Sleepers (Sets) To Rdso Drg. No.Rdso/T-4865 With Latest Alterations/Amendments And To Irs Specifications No. T-45 (4Th Revision) March 2021 With Latest Amendments / Alterations Made By Track Standard Committee As Amended Time To Time During The Currency Of The Contract, Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleeper (Pre-Tensioned Type) For Broad Gauge (1673Mm) As Per Rdso Design For 1 In 8.5 Psc Turnout Sleepers (Sets) To Rdso Drg. No.Rdso/T-4865 With Latest Alterations/Amendments And To Irs Specifications No. T-45-(4Th Revision) March 2021 With Latest Amendments / Alterations Made By Track Standard Committee As Amended Time To Time During The Currency Of The Contract, Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Procurement Of Pre-Stressed Mono Block Concrete Sleepers Isolated For 1 In 12 P&C ( T-4218) With Latest Alteration If Any And Part Drawings Thereof To Suite 60Kg Uic Rail/52Kg Rail And To Irs Specification No. T-45, Third Revision Nov2016 Duly Loaded Into Wagons/Road Vehicles. Unit Of The Item Is Running Meter (Rmt) [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Pre-Stressed Mono Block Concrete Sleeper For1 In 8.5 Psc Turnouts As Per Rdso Drg.No. T-4865 With Latest Alteration And Part Drawing Thereof To Suit 60Kg (Uic Rail)/ 52 Kg Rail And Irs-T-45 (4Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre Stressed Mono Block Concrete Sleepers For 1 In 12 Turnouts To Rdso Drg. No. T-4218 With Latest Alteration If Any And Part Drawings Thereof To Suit 60Kg Uic Rail/52Kg Rail To Irs Specification No. T-45 4Th Revision March 2021(With Latest Amendments If Any) Duly Loaded With Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] Sse/P.Way/Depot/Kzj , Telangana 7.00 Set , Manufacture And Supply Of Pre Stressed Mono Block Concrete Sleepers For 1 In 8.5 Turnouts To Rdso Drg. No. T-4865 With Latest Alteration If Any And Part Drawings Thereof To Suit 60Kg Uic Rail/52Kg Rail To Irs Specification No. T-45 4Th Revision March 2021 (With Latest Amendments If Any) Duly Loaded With Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] Sse/P.Way/Depot/Kzj , Telangana 7.00 Set , Manufacture And Supply Pre-Stressed Mono Block Concrete Sleeper For1 In 12 Psc Turnouts As Per Rdso Drg.No. T-4218 With Latest Alteration And Part Drawing Thereof To Suit 60Kg (Uic Rail)/ 52 Kg Rail And Irs-T-45 (4Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Pre-Stressed Mono Block Concrete Sleeper For1 In 12 Psc Turnouts As Per Rdso Drg.No. T-4218 With Latest Alteration And Part Drawing Thereof To Suit 60Kg (Uic Rail)/ 52 Kg Rail And Irs-T-45 (4Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Agaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Pre-Stressed Concrete Sleeper For Switch Expansion Joint For Long Welded Rails B.G. 52Kg/60Kg Uic As Per Rdso Drg. No. T- 4149 Alt-4 As Per Irs-T-39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Special Type Of Pre-Stressed Mono Block Concrete Sleepers For Level Crossings As Per Rdso Drg.No.T- 8969 With 60Kg (Uic) Running Rail As Per Irs-T-39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Wider Base Pre-Stressed Mono Block Concrete Sleepers As Per Rdso Drg.No.T-8746 As Per Irs-T-39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Special Type Of Pre-Stressed Mono Block Concrete Sleepers For Slab Bridges As Per Rdso Drg. No. T- 8970 With 60Kg (Uic) / 60E1 / Running Rail And 52Kg Check Rail As Per Irs-T- 39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Pre-Stressed Concrete Sleeper For Switch Expansion Joint For Long Welded Rails B.G. 52Kg/60Kg Uic As Per Rdso Drg. No. T- 4149 Alt-4 As Per Irs-T-39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Special Type Of Pre-Stressed Mono Block Concrete Sleepers For Slab Bridges As Per Rdso Drg. No. T- 8970 With 60Kg (Uic) / 60E1 / Running Rail And 52Kg Check Rail As Per Irs- T- 39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Special Type Of Pre-Stressed Mono Block Concrete Sleepers For Slab Bridges As Per Rdso Drg. No. T- 8970 With 60Kg (Uic) / 60E1 / Running Rail And 52Kg Check Rail As Per Irs- T- 39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Wider Prestressed Concrete Sleeper For 25T Axle Load For B.G.60Kg (Uic) / 60E1 / 52 Kg Running Rail With 60Kg (Uic) / 60E1 / 52 Kg Guard Rail On Bridge Approaches To Rdso Drg. No. T- 8971 To T-8978 Specification As Per Irs T-39 (6Th Revision March 2021)As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Wider Prestressed Concrete Sleeper For Level Crossing For 60 Kg (Uic) / 60E1 / 52 Kg Running Rail With 52 Kg Check Rail For 25T Axle Load Special Type Of Wider Base Psc Sleeper Without Fittings But Inclusive Of Inserts For Level Crossings To Rdso Drg. No. T- 8969 Specification As Per Irs T-39 (6Th Revision March 2021) As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Pre-Stressed Concrete Sleeper For Switch Expansion Joint For Long Welded Rails B.G. 52Kg/60Kg Uic As Per Rdso Drg. No. T- 4149 Alt-4 As Per Irs-T-39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Wider Prestressed Concrete Sleeper For Level Crossing For 60 Kg (Uic) / 60E1 / 52 Kg Running Rail With 52 Kg Check Rail For 25T Axle Load Special Type Of Wider Base Psc Sleeper Without Fittings But Inclusive Of Inserts For Level Crossings To Rdso Drg. No. T- 8969 Specification As Amended Up To Date Duly Loaded. Irs T-39 (6Th Revision March 2021)Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Special Type Of Pre-Stressed Mono Block Concrete Sleepers For Slab Bridges As Per Rdso Drg. No. T- 8970 With 60Kg (Uic) / 60E1 / Running Rail And 52Kg Check Rail As Per Irs- T- 39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Wider Prestressed Concrete Sleeper For 25T Axle Load For B.G.60Kg (Uic) / 60E1 / 52 Kg Running Rail With 60Kg (Uic) / 60E1 / 52 Kg Guard Rail On Bridge Approaches To Rdso Drg.No. T- 8971 To T-8978 Specification As Per Irs T-39 (6Th Revision March 2021) As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Wider Pre-Stressed Concrete Sleeper For 25T Axle Load For 60Kg(Uic)/52Kg Running Rails With60kg(Uic)/52Kg Guard Rail On Bridge Approaches As Per Rdso Drg.No.T-8971 To T-8978, With Latest Alteration & Irs Specification No. T-39 (6Th Revision March 2021) With Latest Amendments/Alterations If Any Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Wider Pre-Stressed Concrete Sleeper For 25T Axle Load For 60Kg(Uic)/52Kg Running Rails With60kg(Uic)/52Kg Guard Rail On Bridge Approaches As Per Rdso Drg.No.T-8971 To T-8978, With Latest Alteration & Irs Specification No. T-39 (6Th Revision March 2021) With Latest Amendments/Alterations If Any Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Wider Pre-Stressed Concrete Sleeper For 25T Axle Load For 60Kg(Uic)/52Kg Running Rails With60kg(Uic)/52Kg Guard Rail On Bridge Approaches As Per Rdso Drg.No.T-8971 To T-8978, With Latest Alteration & Irs Specification No. T-39 (6Th Revision March 2021) With Latest Amendments/Alterations If Any Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Wider Pre-Stressed Concrete Sleeper For 25T Axle Load For 60Kg(Uic)/52Kg Running Rails With60kg(Uic)/52Kg Guard Rail On Bridge Approaches As Per Rdso Drg.No.T-8971 To T-8978, With Latest Alteration & Irs Specification No. T-39 (6Th Revision March 2021) With Latest Amendments/Alterations If Any Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Wider Pre-Stressed Concrete Sleeper For 25T Axle Load For 60Kg(Uic)/52Kg Running Rails With60kg (Uic)/52Kg Guard Rail For Use On Ballasted Desk Bridges As Per Drg No.T- 8970, As Per Irs-T-39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Wider Pre-Stressed Concrete Sleeper For 25T Axle Load For 60Kg(Uic)/52Kg Running Rails With60kg (Uic)/52Kg Guard Rail For Use On Ballasted Desk Bridges As Per Drg No.T- 8970, As Per Irs-T-39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Pre-Stressed Concrete Sleeper For Switch Expansion Joint For Long Welded Rails B.G. 52Kg/60Kg Uic As Per Rdso Drg. No. T- 4149 Alt-4 As Per Irst- 39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleeper (Pre-Tensioned Type) For Broad Gauge (1673Mm) As Per Rdso Design For 1 In 16 Psc Turnout Sleepers (Sets) To Rdso Drg. No. Rdso/T-5691 With Latest Alterations/Amendments And To Irs Specifications No. T-45 (4Th Revision) March 2021 With Latest Amendments/Alterations Made By Track Standard Committee As Amended Time To Time During The Currency Of The Contract, Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleepers (Pre-Tensioned Type) For Broad Gauge (1673 Mm) For Level Crossings To Rdso Drg No. Rt-8671 Alt-2, With Latest Alterations And Part Drawing Thereof To Uit 60 Kg (Uic Rail) And As Per Irs Specification T-39 (6Th Revision- March 2021), Both As Amended Up To Date Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Pre-Stressed Concrete Sleeper For Switch Expansion Joint For Long Welded Rails B.G. 52Kg/60Kg Uic As Per Rdso Drg. No. T- 4149 Alt-4 As Per Irst- 39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Pre-Stressed Concrete Sleeper For Switch Expansion Joint For Long Welded Rails B.G. 52Kg/60Kg Uic As Per Rdso Drg. No. T- 4149 Alt-4 As Per Irst- 39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Bridge Approach Sleepers Confirming To Rdso Drg. No. Rdso T-8673- 8680 (Latest Alteration) (Pre-Tensioned) For Broad Gauge (16733Mm) And Part Drawing Thereof To Suit 60Kg (Uic Rail) And As Per Irs Specification T-39 (5Th Revision- February 2016) With Latest Amendments If Any. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Pre-Stressed Concrete Sleeper For Switch Expansion Joint For Long Welded Rails B.G. 52Kg/60Kg Uic As Per Rdso Drg. No. T- 4149 Alt-4 As Per Irst- 39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Pre-Stressed Concrete Sleeper For Switch Expansion Joint For Long Welded Rails B.G. 52Kg/60Kg Uic As Per Rdso Drg. No. T- 4149 Alt-4 As Per Irst- 39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Pre-Stressed Concrete Sleeper For Switch Expansion Joint For Long Welded Rails B.G. 52Kg/60Kg Uic As Per Rdso Drg. No. T- 4149 Alt-4 As Per Irst- 39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Smanufacture And Supply Of Bridge Approach Sleepers Confirming To Rdso Drg. No. Rdso T- 8673-8680 (Latest Alteration) (Pre-Tensioned) For Broad Gauge (16733Mm) And Part Drawing Thereof To Suit 60Kg (Uic Rail) And As Per Irs Specification T-39 (5Th Revision- February 2016) With Latest Amendments If Any. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Wider Pre-Stressed Concrete Sleeper For 25T Axle Load For 60Kg(Uic)/52Kg Running Rails With60kg (Uic)/52Kg Guard Rail For Use On Ballasted Desk Bridges As Per Drg No.T- 8970, As Per Irs-T-39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Wider Pre-Stressed Concrete Sleeper For 25T Axle Load For 60Kg(Uic)/52Kg Running Rails With60kg (Uic)/52Kg Guard Rail For Use On Ballasted Desk Bridges As Per Drg No.T- 8970, As Per Irs-T-39 (6Th Revision March 2021) Specification As Amended Up To Date Duly Loaded Into Wagaons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Bridge Approach Sleepers Confirming To Rdso Drg. No. Rdso T-8673- 8680 (Latest Alteration) (Pre-Tensioned) For Broad Gauge (16733Mm) And Part Drawing Thereof To Suit 60Kg (Uic Rail) And As Per Irs Specification T-39 (5Th Revision- February 2016) With Latest Amendments If Any. [ Warranty Period: 60 Months After The Date Of Delivery] Sse/P.Way/Depot/Kzj , Telangana 24.00 Set , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleeper (Pre-Tensioned Type) For Broad Gauge (1673Mm) As Per Rdso Design For Sej Sleepers (Sets) To Rdso Drg. No. Rdso/T-4149 With Latest Alterations/Amendments And To Irs Specifications No.T-39(6Th Revision) Mar-2021 With Latest Amendments / Alterations Made By Track Standard Committee As Amended Time To Time During The Currency Of The Contract, Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleeper (Pre-Tensioned Type) For Broad Gauge (1673Mm) As Per Rdso Design For Sej Sleepers (Sets) To Rdso Drg. No. Rdso/T-4149 With Latest Alterations/Amendments And To Irs Specifications No.T-39(6Th Revision) Mar-2021 With Latest Amendments / Alterations Made By Track Standard Committee As Amended Time To Time During The Currency Of The Contract, Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleeper (Pre-Tensioned Type) For Broad Gauge (1673Mm) As Per Rdso Design For Sej Sleepers (Sets) To Rdso Drg. No. Rdso/T-4149 With Latest Alterations/Amendments And To Irs Specifications No.T-39(6Th Revision) Mar-2021 With Latest Amendments / Alterations Made By Track Standard Committee As Amended Time To Time During The Currency Of The Contract, Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleeper (Pre-Tensioned Type) For Broad Gauge (1673Mm) As Per Rdso Design For 1 In 16 Psc Turnout Sleepers (Sets) To Rdso Drg. No. Rdso/T-5691 With Latest Alterations/Amendments And To Irs Specifications No. T-45 (4Th Revision) March 2021 With Latest Amendments/Alterations Made By Track Standard Committee As Amended Time To Time During The Currency Of The Contract, Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre-Stressed Mono-Block Concrete Sleepers (Pre- Tensioned Type)For Broad Gauge (16733Mm) Conforming To Rdso Drg. No. Rt-4149 Alt-3 (With Latest Alerations) And Part Drawing Thereof To Suit 60Kg (Uic Rail) For Switch Expansion Joints And As Per Irs Specification T-39 With Latest Amendments If Any. [ Warranty Period: 60 Months After The Date Of Delivery] Sse/P.Way/Depot/Kzj , Telangana 64.00 Set , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleepers (Pre-Tensioned Type) For Broad Gauge (1673 Mm) For Level Crossings To Rdso Drg No. Rt-8671 Alt-2, With Latest Alterations And Part Drawing Thereof To Uit 60 Kg (Uic Rail) And As Per Irs Specification T-39 (6Th Revision- March 2021), Both As Amended Up To Date Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleepers (Pre-Tensioned Type) For Broad Gauge (1673 Mm) For Level Crossings To Rdso Drg No. Rt-8671 Alt-2, With Latest Alterations And Part Drawing Thereof To Uit 60 Kg (Uic Rail) And As Per Irs Specification T-39 (6Th Revision- March 2021), Both As Amended Up To Date Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleepers (Pre-Tensioned Type) For Broad Gauge (1673 Mm) For Level Crossings To Rdso Drg No. Rt-8671 Alt-2, With Latest Alterations And Part Drawing Thereof To Uit 60 Kg (Uic Rail) And As Per Irs Specification T-39 (6Th Revision- March 2021), Both As Amended Up To Date Duly Loaded Into Wagons/Road Vehicles. [ Warranty Period: 60 Months After The Date Of Delivery] , Manufacture And Supply Of Pre-Stressed Mono Block Concrete Sleepers (Pre- Tensioned Type) For Broad Gauge (1673Mm) Confirming To Rdso Drg. No. Rt-4149 Alt-3 (Latest Alteration) And Part Drawing Thereof To Suit 60Kg (Uic Rail) For Switch Expansion Joints And As Per Irs Specification T-39 (6Th Rev Mar 21) With Latest Alteration If Any. [ Warranty Period: 60 Months After The Date Of Delivery] Sse/P.Way/Depot/Kzj , Telangana 12.00 Set

Key Value

Document Fees
Refer document
EMD
INR 2000000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail