Construction Of Interconnecting Pipeline Vdpl To Vapl - Fabrication, Erection, Including Cutting, Welding, Grinding & Installationof Above Ground Piping In Position Excluding Any Ndt But Including Hydro Testing.Fabrication Including Cutting, Welding, Edge Preparation, Inclusive Of Grinding The Edges Of Pipes, Fittings, Flanges, Etc. To Match With The Matching Edges Of Uneven / Different Thickness Wherever Required, Welding, Attachment Of All Pipe Fittings Like Elbows, Tees, Reducers. Supply Of Nipples, Couplings, Caps, Plugs, Gasket, Stud Bolts, Nuts, U-Clamps, Etc. As Required For Completion Of Job. 2 24 Dia X 22.2 Mm Thk 3 36 Dia X 23.8 Mm Thk 4 ¾Inch Dia, Thk / Sch 160 Up To 1*1 / 2 Zinch. 5 Installation Of Valves 6 Size -24 Inch , Ratting 900# 7 Size 2.0 Inchratting 900# 8 Installation Of Above Ground Welded / Socket Welded Valve 9 Size 1.0Inch 10 Size ¾ Inch 11 Radiography By Gamma Rayperformance Of Radiographic Inspection By Gamma Radiation As Per Scope Of Work And As Per Specifications In Piping Of All Types And Thickness Including Providing / Hiring Of All Necessary Equipments, Supply Of All Consumables, And Whatever Else Even Though Not Expressly Mentioned But Required To Perform The Work As Per Specifications And Instructions Of Eic ( Full Circle Re-Radiography Of The Repaired Joint And Additional Radiography Necessitated Due To Poor Performance Of ContractorS Welder Shall Be Carried Out By The Contractor At His Own Cost And Shall Not Be Paid Extra By Company ) . Radiographs Shall Be Submitted To The Eic For Acceptance Whose Decision Shall Be Final And Binding. 12 24 Dia 13 36 Dia 14 Pipe Support ( Supply And Installation ) Erection Of Pipe / Equipment Supports ( For All Sizes / Thickness ) Including Shoes, Pipes, Cross-Ivers, Platforms, Ladders, Railings Etc. As Required, Cradles, Turn Buckles, T-Posts For All Types Of Guides, Anchors, Special Supports For Cold / Hot Insulated Pipes Etc. If Applicable, All Necessary Equipment, Consumables, Labour Etc. For Completing All Works Including Supply Of Bolts, Nuts, Washers, U-Clamps, Wooden Blocks Etc. As Required For Supporting, Supply And Application Of Paints And Primers Suitable For Normal Corrosive Painting Environment As Defined In Contract Document And As Per Standard Specification For Painting Specification, Drawings, Specification, Standards, Other Provisions Of Contractand Instructionof Engineer-In-Charge. 15 Csstructural Steel Supply And Fabricationerection 16 Painting Of Piping Including Copper Slag Blastingpainting Of Entire System ( Including Aboveground All Pipes Fittings, Flanges & Accessories ) Suitable For Normal Corrosive Area Environment Including Supply Of Approved Paints & Primers, Application Of Primer & Paints, Identification Lettering / Numbering, Color-Coding, Etc. As Specified Including Rub-Down & Touch-Up Of Shop Primer Or Scrapping Of Shop Primer Wherever Required By Company And Providing Scaffolding For All Heights, Etc. 17 24 Dia 18 36 Dia 19 3 / 4 Dia 20 Hookup & Commissioning Assistancecommissioning Is In Contractor Scope And Shall Provide All Necessary Assistance In Term Of Supply Of Manpower, Equipment, Tools And Tackles Required Amount Of Nitrogen For Purging Of Entire Terminal Piping System Including Equipments Etc. To The Company During Commissioning Activities. Completion Of All Such Work In All Respects As Per Scope Of Work And As Per Drawings, Specifications And Instructions Of The Company And Keeping The System Ready In All Respects For Further Commissioning And Start-Up.