| 1 | AIR CONDITIONER |
| 2 | Material and labour for taking down window type Air Conditioner of1.0 TR/1.5 TR / 2.0 TR, cleaning completely the cooling coil initially with hand blower, spraying with soap water solution and finally clean with clear water and refixing at same location with complete testing all as directed by the Engr-in-Charge. |
| 3 | Dismantling covers of out-door and in-door units of split type Air Conditioner of capacity 1.0TR/1.5TR/2.0TR, cleaning completely the condenser coil and cooling coil initially with hand blower, spraying with soap water solution and finally clean with clear water, re-fixing the covers in same position complete as directed by the Engineer-in-Charge. |
| 4 | Carrying out pressure leak test by Nitrogen gas pressure for detecting leak in condensing unit refrigerant pipe and repairing the leak by welding or brazing of condensing unit and refrigerant pipe, putting under pressure for leak checking after repairs of leak pipe including gas charging as per existing and and transporting & carrying out T&P required at site for work of following capacity ACs, water coolers & refrigeratorsall as specified and directed.Note : The rate under mentioned items included for transpotation of AC to & from work shop as approved by Engr-in-Charge. |
| 5 | (a) Window type AC of capacity up to 2.0 TR |
| 6 | (b) Split type AC of capacity of capacity up to 2.0 TR. |
| 7 | (c) Refrigerator of capacity up to 340 ltr |
| 8 | (d) Water cooler of capacity 40 Ltr to 150 ltrs |
| 9 | (e) Deepfreezer of capacity 320 ltrs |
| 10 | Dismantling of blower fan motor cutting burnt coils replacement and taking out from the AC unit, cleaning and rewinding using supper enameled copper wire of existing size and gauge including insulation materials change of bush (front and rear) made out of gun metal and reassembling all accessories and testing complete all as directed for the following :- |
| 11 | (a)Window type AC of capacity 1.0 TR/1.5TR/2.0TR |
| 12 | (b)Split type AC of capacity 1.0 TR/1.5TR/2.0TR |
| 13 | (c)Water cooler of capacity 40 Ltr to 150 ltrs |
| 14 | (d)Deepfreezer of capacity 320 ltrs |
| 15 | Labour only for collecting the complaints of various wards/departments etc pertains tosplit/window type ACs of any capacity/make from concern JE of AGE E/M, attendending these at site to asses the actual fault after opening of ACs and fixing only spares required to make it fully functional in all respect and handing over the report duly signed by the user by nameto concern JE all as directed. (Spare parts shall be measured and paid separately under appropriate items) |
| 16 | (a) Running capacitor 50 mfd |
| 17 | (b) Running Capacitor 4/6 mfd |
| 18 | (c) Capillary Tube (copper) as per existing size. |
| 19 | (d) Filter strainer |
| 20 | (e) Air filter made of plastic frame and nylon net |
| 21 | (f) Temparature sensor of any make or equivalent |
| 22 | (g) Contactor relay for split type AC. |
| 23 | (h) Running capacitor 45/50 Mfd + 6 MFD up to 2 ton split type AC |
| 24 | (j) Blower motor for window/Split Type AC upto 2 Ton capacity (as per existing make such as Blue Star, carrier, Usha, Voltas,LG, Amtrex etc) |
| 25 | (k)Remote suitable for window/Split AC |
| 26 | (l) Front grill (as per existing make such as Blue Star, carrier, Usha, Voltas,LG, Amtrex etc) |
| 27 | (m) PCB Board for Window/split type AC |
| 28 | (n) PCB Board for Duel inverter split type AC |
| 29 | (o) Rubber bushing for blower motor |
| 30 | (p) Swing motor for split type AC of capacity 1.0 TR/1.5TR/2.0TR. |
| 31 | (q) Display assembly for spilit type AC |
| 32 | (r) Starting capacitor 100/120 mfd (Universal/ SARADA or equivalent) |
| 33 | (s) Sensor for Indoor unit. |
| 34 | (t)Copper tube cooling/condensor coil 5/8 inch with proper insulation |
| 35 | (u)Copper tube cooling/condensor coil 1/2 inch with proper insulation |
| 36 | (v)Copper tube cooling/condensor coil 1/4 inch with proper insulation |
| 37 | (w) Modular plug top 20 Amps |
| 38 | (x)Fan blade set |
| 39 | (y)Brand new fan motor 1/5 HP |
| 40 | Supply and fixing in repair sealed unit Compressor rotary type for window/split ACupto 1.5 Ton capacity, complete all as specified and as directed. |
| 41 | Supply and fixing in repair sealed unit Compressor rotary type for window/split ACupto 2.0 Ton capacity, complete all as specified and as directed. |
| 42 | S&F in repair flexible drain pipe for split type AC, complete all as specified and as directed. |
| 43 | M&L for wiring kit and connector etc. and replacement of defective wiring of any make by Window/Split AC, complete all as specified and as directed. |
| 44 | M&L in repair of voltage stablizer of 4 KVA Cap range between 130 to 280 Volt suitable for 1.5 Ton window/split AC, complete all as specified and as directed. |
| 45 | S&F in repair of voltage stablizer of 5 KVA Cap range between 130 to 280 Volt suitable for 2 Ton window/split AC, complete all as specified and as directed. |
| 46 | M&L for opening/cutting hole in brick wall sutable for window type AC 1.5/2 Ton and making good disturbed surface area complete with cement plaster and masonary work reqd at site and made air tight to opening with the thermocoal material all round the window AC etc., complete all as specified and directed by Emgr-in-Charge. |
| 47 | Disconnecting and taking out existing defective MCB of any description & in any make and supplying and fixing new MCB, single pole, 240 v, 32 Amps, \"B\" series, complete all as specified and as directed. |
| 48 | Disconnecting and taking out existing defective MCB of any description & in any make and supplying and fixing new MCB, single pole, 240 v, 20 Amps, \"B\" series, complete all as specified and as directed. |
| 49 | Supply & fixing split out door fan with copper condenser of capacity 2 Ton, complete all as specified and as directed. |
| 50 | S&F PVC sheathed copper conductor cable of size 4 sqmm x 3 core, 1100 volt, ISI marked, complete all as specified and as directed. |
| 51 | S&F PVC sheathed copper conductor cable of size 6 sqmm x 3 core, 1100 volt, ISI marked, complete all as specified and as directed. |
| 52 | S&F fan capacitor of capacity 3/4/5 mfd, 230 volt, ISI marked, complete all as specified and as directed. |
| 53 | REFRIGERATOR |
| 54 | Labour only for collecting the complaints of various wards/departments etc pertains toRefrigerators of any capacity/make from concern JE of AGE E/M, attendending these at site to asses the actual fault after opening of refrigerator and fixing only spares required to make it fully functional in all respect and handing over the report duly signed by the user by nameto concern JE all as directed. (Spare parts shall be measured and paid separately under appropriate items)Note : The rate under mentioned items included for transpotation of refrigerator to & from work shop as approved by Engr-in-Charge. |
| 55 | (a) Condenser coil for upto 340 Ltrs cap |
| 56 | (b) Pin/Thread type lamp holder |
| 57 | (c) Bulb LED 15 watt (Pin/Thread type) |
| 58 | (d) Ice tray |
| 59 | (e) Open type relay with overload protector, 165 to 210 ltr |
| 60 | (f) Thermostat auto defrost |
| 61 | (g) Capillary tube (copper) as per existing |
| 62 | (h) Chill tray |
| 63 | (j) 3 Pin 15 Amps plug top 240 Volt |
| 64 | (k) Ice Chamber up to 340 Ltr |
| 65 | (l) Vegetable box |
| 66 | (m) Bimetal (Double door) |
| 67 | (n) Frost free fan motor |
| 68 | (o) Timer |
| 69 | (p) Relay 1/6 HP (240 to 310 ltr) |
| 70 | (q) Over load protector 1/6 HP |
| 71 | (r) Door megnatic gasket for upto 340 Ltrs cap |
| 72 | (s) Light switch upto 340 Ltrs cap |
| 73 | (t) Cooling coil for upto 340 ltrs |
| 74 | (u) Brand new fan motor 1/5 HP |
| 75 | (v) Compressor as per existing upto 220 Ltrs |
| 76 | (w) Compressor as per existing upto 340 Ltrs |
| 77 | WATER COOLER |
| 78 | Labour only for collecting the complaints of various wards/departments etc pertains to water coolers of any capacity/make from concern JE of AGE E/M, attendending these at site to asses the actual fault after opening of water coolers and fixing only spares required to make it fully functional in all respect and handing over the report duly signed by the user by nameto concern JE all as directed. (Spare parts shall be measured and paid separately under appropriate items)Note : The rate under mentioned items included for transpotation of water cooler to & from work shop as approved by Engr-in-Charge. |
| 79 | (a) Push type tapcopper alloy chromium plated 15/20 mm bore. |
| 80 | (b) Rubber lining for top cover gasket (3 metre approx each cooler) |
| 81 | (c) Starting relay suitable for 5/8 HP motor |
| 82 | (d) Starting capacitor 60/80 mfd |
| 83 | (e) Thermostat |
| 84 | (f) Float valve Brass with fly nut screwed as per existing. |
| 85 | (g) Over load protector |
| 86 | (h) Capilary tube as per existing size (Copper). |
| 87 | (j) Blower motor as per existing. |
| 88 | (k) Running capacitor 15 mfd |
| 89 | (l) Running capacitor 10 mfd |
| 90 | (m) Fan blade assembly as per existing |
| 91 | (n) Wiring kit |
| 92 | (o) Drain stainless steel tray with drain elbow and connector |
| 93 | (p) PVC hose connection pipe both ends having brass coupling threaded for 15mm bore |
| 94 | (q) PVC drain hose pipe of size 32mm dia |
| 95 | (r) Compressor as per existing upto 120/150 Ltrs |
| 96 | Supply and charging refrigeration gas R-22for Split/window AC/water cooler/Deep fridger/AC plant of cap 7.5 TR, testing leak in system and commissioning all as specified and directed. |
| 97 | Supply and charging refrigeration gas R-134Afor Split/window AC, testing leak in system and commissioning all as specified and directed. |
| 98 | Supply and charging refrigeration gas R-410for Split/window AC, testing leak in system and commissioning all as specified and directed. |
| 99 | S&F in repair for sheet metal enclosure single pole and neutral with two pin and earth plug complete with one single pole MCB 20 Amps 240 volt, complete all as specified and as directed. |
| 100 | Taking down out door unit of 1.5TR/2.0 TR capacity removing unserviceable AC stand/angle iron bracket fixing new AC stand/angle iron bracket in repair fixing to wall by foundation bolts refixing the out door unit connection the suction and discharge line completetesting and running all as directed by the Engr-in-Charge. |
| 101 | Dismantling and taking out voltage stabllizer transformer unit,auto transformer varier,electric circult board,all cable connections,including repairing/replacement of push on switch,transistor,capacitor,relay transistor,diode,condenser,voltmeter,PVC connector,indicator lamp,cutout,MCB complete parts along with testing commissioning and trasportation charges from site to workshop all as directed :- |
| 102 | (a)Upto 2 KVA capacity |
| 103 | (b)03 KVA capacity |
| 104 | (c)05 KVA capacity |
| 105 | Replacement of following spare parts for 1 KVA to 3 KVA capacity stabalizers : |
| 106 | (a) Relay set ( set of two ) |
| 107 | (b) PCB ( Printed circuit board) |
| 108 | Replacement of following spare parts for 4 KVA to 5 KVA capacity stabalizers : |
| 109 | (a) Relay set ( set of two ) |
| 110 | (b) PCB ( Printed circuit board) |
| 111 | GEYSER |
| 112 | Taking down geyser of 50/35/25 ltrs capacity from its position after disconnecting connection, opening of geyser to take out inner tank , soldering attwo to three places to stop leakage and also scraping , brushing down old paint with emery paper and apply two coats of white paint using spray machine spray painting and complete all as specified and as directed. |
| 113 | Dismantling of exist unserviceable apparatus plate and Supply & fixing in repair new apparatus plate match to the existingone with rubber gasket suitable for 35 ltrs geyser, complete all as specified and as directed. |
| 114 | All as per Item No. 4.02 here-in-before but for 25 ltrs capacity. |
| 115 | S&F in repair puf glass wool suitable for geyser, complete all as specified and as directed. |
| 116 | Dismantling of exist unserviceable heating element triangular type from geyser and Supply & fixing in repair new heating element of 1.5/2.0 kw 230 volt at including testing and complete connection all as specified and as directed. |
| 117 | Dismantling of exist unserviceable heating element round from geyser and Supply & fixing in repair new heating element of 1.5/2.0 kw 230 volt at including testing and complete connection all as specified and as directed. |
| 118 | Dismantling of existing old unserviceable thermostat 60 degree C to 90 degree C reseting thermostat for diffrent type geyser and Supply & fixing in repair new thermostat matching to exist one including all connection, testing etc., complete all as specified and as directed. |
| 119 | Supply & fixing in repair PVC Connection pipe steel wire braided 15 mm dia (one pair, i.e. 02 Nos) with two Nos brass chromium plated union alongwith Hexagonal nuts adoptor,rubber washer etc for water line, complete all as specified and as directed :- |
| 120 | (a) 450mm long |
| 121 | (b) 600mm long |
| 122 | Supply & fixing in repair PVC Connection pipe heavy pipe (sutable to hold 60 to 100 degree C temprature for hot water) of 15 mm dia (one pair, i.e. 02 Nos) with brass flexible tube along with CP Hexagonal nuts adoptor,rubber washer etc. for water line, complete all as specified and as directed :- |
| 123 | (a) 450mm long |
| 124 | (b) 600mm long |
| 125 | Supply and fixing fusible plug for geysers melting at 95 degree C ( any special required for fixing plug shall be supply without any financial implication after taking down old unserviceable fusible plug, complete all as specified and as directed. |
| 126 | S&F indicators lamp Red/Green, round /rectangular type after taking down old unserviceable indicator lamp, complete all as specified and as directed. |
| 127 | S&F insulated flexible multi strand copper conductor nominal area 2.5 Sqmm, round type 3 core cable after taking out old unserviceable cable, complete all as specified and as directed. |
| 128 | Taking down stop valve and supply & fixing new stop valve CP and fixed of 15 mm bore, complete all as specified and as directed. |
| 129 | Taking down old rusted clamp, nut, bolt, washer complete set and supply & fixing new clamp, nut, bolt, washer complete set for hanging of geyser, complete all as specified and as directed. |
| 130 | DEEP FREEZER |
| 131 | Labour only for collecting the complaints of various wards/departments etc pertains to deep fridger of any capacity/make from concern JE of AGE E/M, attendending these at site to asses the actual fault after opening of deep fridger and fixing only spares required to make it fully functional in all respect and handing over the report duly signed by the user by nameto concern JE all as directed. (Spare parts shall be measured and paid separately under appropriate items)Note : The rate under mentioned items included for transpotation of deep fridger to & from work shop as approved by Engr-in-Charge. |
| 132 | (a) Over load relay. |
| 133 | (b) Fan motor set 4\" size |
| 134 | (c) Fan motor set 6\" size |
| 135 | (d) Thermostate |
| 136 | (e) Filter |
| 137 | (f) Compressor reciprocating upto 320 Ltrs |
| 138 | (g) Compressor reciprocating upto 500 Ltrs |
| 139 | Dismantling of burn fan motor of any size and make from the deep fridger and replacement of new fan motor and reassembling all as accessories and testing, complete all as specified and as directed. |
| 140 | S&F in repair wiring for circuit/submain wiring alongwith earth wire with the following size of FRLSH PVC insulated copper conductor, single core cable in surface/recessed as required 2 x 6.0 sqmm + 1 x 6.0 sqmm earth wire in PVC casing caping, complete all as specified and as directed.Note : Two run plus one run of cable considered as One RM. |
| 141 | S&F in repair wiring for circuit/submain wiring alongwith earth wire with the following size of FRLSH PVC insulated copper conductor, single core cable in surface/recessed as required 2 x 4.0 sqmm + 1 x 4.0 sqmm earth wire in PVC casing caping, complete all as specified and as directed.Note : Two run plus one run of cable considered as One RM. |
| 142 | CENTRAL TYPE AC PLANT 50 TR CAPACITY (3 x 25 TR) |
| 143 | M&L for preventive and comprehensive maintenance of Central AC chiller plant of capacity 3 x 25 TR strictly through OEM i.e. M/S Voltasforthe plant and equipment ofModle No. ACWCDSQ26DPMN 2 X 1P 25. The scope of work is as under :-(a) Checking and rectification if required for abnormal noise, vibration, leakage of refrigerant , oil etc.(b) Topping up of system with refrigerant and oil replace dehydrators etc.(c) Checking of operation of oil heater, motor protector, flow switch, loading unloading etc. (d) Checking of control valve.(e) Attend breakdown calls as and when required, investigation, locate defect and submit action plan to rectify the same.(f) All the maintenance /servicing work should be done in such a way sothat the equipment /unit can be used for its optimum performance.(g) Adjustment in the system to achive required temprature and RH level .(h)Cleaning of all type of aire filter (j) Checking and servicing of AHU.(k)Descaling of copper tube of cooling coil bu suitable means as per manufacturer recommandation.(l) Cleaning of ducting system having diffuser, grills, damper etc.(m)Servicing, cleanning ofevaporators, expansion valve, water cooled condenser, oil cooler, oil piping, oil filter, refrigerant piping, refrigerant filter, solenoidvalve, AHU control panel. |
| 144 | NOTE :(a) Scope of work also include supply of material like timer, chiller in/out sensor, filter drier and solenoid coil during AMC.(b)Comprehensive maintenance is to be carried out by OEM i.e. M/S Blue Star only. The contractor shall be required to submit an MOU with OEM for the same and it will be essential requirement and technical evaluation stage. |
| 145 | Taking down Defective Burn out cooling tower squirrel cage motor of capacity 3 HP/2.25KW, 945 RPM, (IP 55) after disconnecting all Electrical Connections and rewinding the Same with New cooling tower motor of same capacityincluding testing and commissioning, complete all as specified and as directed. |
| 146 | Taking down Defective condencer water pump of suction/delivary 80/65 mm, head 25m capacity, coupled with motor cap 7.5 kw, 1450 rpm, 415 Volt after disconnecting all mechanical & electrical Connections, cleaning all parts incl impeller strainer and replaced the Same with new bush/bearing, gland packing, greasing, servicing etc. complete and installed the same incl testing, complete all as specified and as directed. |
| 147 | Taking down defective burn out condencer water pump motor of cap 7.5 KW, 1450 rpm, 415 Volt (IP 55) after disconnecting all electrical Connections and rewinding the same with new copper winding with same wire gauge & size to achive 1450 rpm motor including reinstalling, testing and commissioning, complete all as specified and as directed. |
| 148 | Taking down Defective Hot water and Chiller water pump of suction/delivary 80/65 mm, head 48m capacity, coupled with motor cap 15 kw, 1460 rpm, 415 Volt after disconnecting all mechanical & electrical Connections, cleaning all parts incl impeller strainer and replaced the Same with new bush/bearing, gland packing, greasing, servicing etc. complete and installed the same incl testing, complete all as specified and as directed. |
| 149 | Taking down defective burn out chiller water pump motor of cap 15 KW, 1460 rpm, Head-48M, 415 Volt (IP 55) after disconnecting all electrical Connections and rewinding the same with new copper winding with same wire gauge & size to achive 1460 rpm motor including reinstalling, testing and commissioning, complete all as specified and as directed. |
| 150 | Comprehensive maintenance of AC plant indoor type panel for monitoring system including servicing (i.e. replace same size of cu. Wire, lugs etc. if reqd.) of unserviceable part equipments, complete all as specified and directed. |
| 151 | S&F in repair Contactor TP, AC3, type MNX 32 as approved and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 152 | S&F in repair Contactor TP, AC3, type MNX 25 as approved and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 153 | S&F in repair Contactor TP, AC3, type MNX 9 as approved and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 154 | S&F in repair Contactor TP, AC3, type MNX 12 as approved and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 155 | S&F in repair thermal over load relay 9 to 15 A as approved and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 156 | S&F in repair thermal over load relay 4.5 to 7.5 A as approved and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 157 | S&F in repair thermal over load relay 3 to 5 A as approved and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 158 | S&F in repair S/D timer, coil : 230 volt AC as approved and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 159 | Taking out unserviceable digital Ammeter, supply & fixing digital Ammeter of similar range of size 96mmx96mm\", capacity ,1 phase, 230 volt, AC, suitable forthe LT Panel board including electrical connection withsuitable size of copper wire, complete all as specified and as directed. |
| 160 | Taking out unserviceable digital Voltmeter, supply & fixing digital Voltmeter of similar range of size 96mmx96mm\", capacity ,1 phase, 230 volt, AC, suitable forthe LT Panel board including electrical connection withsuitable size of copper wire, complete all as specified and as directed. |
| 161 | Taking out unserviceable selector switch, supply & fixing IP 2W selector switch of cap 6 A, suitable for LT Panel board including electrical connection withsuitable size of copper wire, complete all as specified and as directed |
| 162 | Taking out unserviceable ammeter selector switch, supply & fixing Ammeter selector switch of cap 6 A, suitable for LT Panel board including electrical connection withsuitable size of copper wire, complete all as specified and as directed. |
| 163 | S&F in repair push button (start-stop) switch and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 164 | S&F in repair MCB, SP, 6-32 Amps, 10 KA, C-curve and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 165 | S&F in repair MCCB, 4P, 630 Amps, 36 KA, thermal magnetic release and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 166 | S&F in repair MCCB, 4P, 100 Amps, 25 KA, thermal magnetic release and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 167 | S&F in repair MCCB, 3P, 63 Amps, 25 KA, thermal magnetic release and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 168 | S&F in repair MCCB, 3P, 16 Amps, 25 KA, thermal magnetic release and suitable for LT Panel of CENTRAL AC PLANT, complete all as specified and as directed. |
| 169 | Overhauling, servicing and maintenance of AHU unit including cleanning of filters after disconnecting all mechanical & electrical Connections, cleaning all parts etc. complete incl testing all as specified and as directed. |
| 170 | S&F in repair\"s Rotary switch suitable make and size with handle, complete all as specified and as directed. |
| 171 | S&F in repair\"s of butterfly valve of size 100 mm dia, complete all as specified and as directed. |
| 172 | Painting of MS portion of AC plant including cooling tower and AHU unit, removing of all rusted parts, proper cleaning of parts etc., complete all as specified and as directed. |
| 173 | S&F in repair\"s of filter stainer (Refrigerent line) as per suitable size, complete all as specified and as directed. |
| 174 | S&F in repair\"s of HP/ LP cut out, complete all as specified and as directed. |
| 175 | S&F in repair\"s of water pressure gauge of existing size range, , complete all as specified and as directed. |
| 176 | S&F in repair\"s of Thermometer of existing size & shape, complete all as specified and as directed. |
| 177 | Descaling of copper tube and pipe line of cooling coil for min 8hrs/ as per site requirement or as per OEM recommendation, complete all as specified and as directed. |
| 178 | Descaling of copper tube and pipe line of condensing coil for 8 hrs as per OEM recommendation, complete all as specified and as directed. |
| 179 | M&L for Nitrogen gas pressure testing by pressurising with nitrogen gas upto 300 psi the complete system to find out the leakage & maintaining pressure for 24 hours and rectifying leakages in the system, vaccumising complete system of central A/C plant with double stage vaccum pump of - 2kg/Sq cmvaccum pressure, complete all as specified and as directed. |
| 180 | Supply and charging refrigeration gas R-407C for Central AC plant, testing leak in system and commissioning all as specified and directed. |
| 181 | Comprehensive maintenance of AC plant remote monitoring system including servicing of all unserviceable part/equipments, complete all as specified and directed. |
| 182 | Schedule of Credit |