|
| 1 | SUPPLY OF MOISTURE ANALYZER FOR NREP PROJECT- Group 1 |
| 2 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares,Mandatory Periodic Visitsfor MOISTURE ANALYZER as specified in Material Requisition & mentioned below.TAG NO. 1P23-AT-278104 -1 No |
| 3 | SUPPLY OF MOISTURE ANALYZER FOR NREP PROJECT- Group 2 |
| 4 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares, Mandatory Periodic Visitsfor MOISTURE ANALYZER as specified in Material Requisition & mentioned below.TAG NO.1P23-AT-638502-1 No |
| 5 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares, Mandatory Periodic Visitsfor MOISTURE ANALYZER as specified in Material Requisition & mentioned below.TAG NO. 1P24-AT-120002 (Multi Channel analyser)-1 No |
| 6 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares, Mandatory Periodic Visitsfor MOISTURE ANALYZER as specified in Material Requisition & mentioned below.TAG NO. 1P24-AT-133101 (Multi Channel analyser) -1 No |
| 7 | SUPPLY OF MOISTURE ANALYZER FOR NREP PROJECT - Group 3 |
| 8 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares, Mandatory Periodic Visitsfor MOISTURE ANALYZER as specified in Material Requisition & mentioned below.TAG NO.1P25-AT-317101- 1 No |
| 9 | Charges for SITE Supervision of Erection / Installation and Testing for SUPPLY OF of MOISTURE ANALYZER as per MR for 7 (Seven) Man-Days for Group 1 (1P23-AT-278104) , 15 (Fifteen) Man-Days for Group 2 ( 1P23-AT-638502, 1P24-AT-120002 & 1P24-AT-133101 combined) and 7 (Seven) Man-Days for Group 3 (1P25-AT-317101) shall be considered for supervision of erection, testing and commissioning at site as per MR |
| 10 | Per diem charges for upto 8 hours work on normal working days. |
| 11 | Overtime rate / hour beyond normal 8 hours work on normal working days. |
| 12 | Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). |
| 13 | Charges for Training MOISTURE ANALYZER as per MR |
| 14 | Per diem charges for training at NRL site as per MR 05(Five) man-day for each group |
| 15 | Per diem chargesfor Trainingat OEM\"s Work as per MR 05(Five) man-day for each group |