Procurement And Installation Of The Non-Schedule Items For Auditorium Cum Cultural Center, Kuchinda , Frp Door Frame , Providing And Fixing Frp Door Frames Size ( 65Mmx90mm ) At Any Locations Including Doors, Windows, Cupboard, Clerestory And Other Frames Fixing In Position Including Cost Of Hinges, M.S. Flat ( 30Mmx6mm ) Hold Fasts Lugs Or Dash Fasteners Of Required Dia And Length As Per Drawing / Specification, At All Floors And All Heights. ( Ground Floor ) , Frp Door Shutter , Supplying Fitting, Fixing Factory Made Single Leaf Rigid Frp Sandwich Composite Door / Window Shutter ( Alternately Grp ) Of 32 Mm Thick Laminated With Two Grp Skins With Wood Grain Finish Fabricated Using Uv-Stabilised Isopathalic Gelcoat And One Layer Of 450 Gsm E-Glass Chopped Strand Mat ( Csm ) Mpregnate With Orthopthalic Polysterskin. The Thickness Of The Skins Shall Not Be Less Than 1.5 Mm Expanded Polystyone ( Eps ) Structural Foam Panel Of 29 Mm Thickness And A Density Of 20 Kg / Cu.Mtr Shall Be Used As Core Material. Wooded Reinforcement Made Of Seaoned Sal Wood Block Of Cross Section Not Less Than 28Mm X 32Mm And Also Necessary Sal Wood Reinfocements For Fitting The Metal Fittings Such As Tower Bolt, Aldrop. Hanles, Etc. Shall Be Provided. A Structural Adhesive Compatible With ( Eps ) Foam Shall Be Used For Bending The Core Material. The Material And Process For Mariufacturing The Door Shutters Shall Be Conform To Rv- Tifac Composite Design Centers Standards And Specifications And The Door Shutters Tested In Conforming To Is: 4020-1998. The Finish Door Shutter Will Be Plain Colour As Per Specification And Diection Of Engineer-In Charge. ( Ground Floor ) , Wooden Flooring , Providing And Laying In Position 12 Mm Thick Engineered Hardwood Flooring Of Make Xylos Walnut Shade Having Dimension 12*1210 Mm*125 Mm Having Smart Lock Tongue And Groove Joints To Secure Long Lasting Joint. The Material Comprising Of Three Layers, Top Layer Is Of Genuine Hardwood Surface, The Middle Layer Is Of Pine Or Spruce Ribs Laid Transversely And The Third Layer Is Stabilizing Bottom Layer. The Floor Is Finished On Top With Seven Course Of Uv Curved Formaldehyde Free Lacquer. The Planks Are Installed On Foam And Polythene Sheet On Top Of The Under Floor And Stuck To One Another Using Adhesive In The Groove Of The Board All Complete Including All Accessories ( Skirting, Profile ) Etc. , Gyp Board Ceilling , Providing And Fixing False Ceiling As Per Saint Gobain Specifications Made Of Standard G.I. Sections And 12Mm Thick Gyp Board Sheets Inclusive Of All Hangers, Edge Members And Other Clips Complete, With Sheets Fixed With Proper Philip Fastner By Power Drills And Joints Duly Finished Ensuring Level In Line, Complete With Putty, Primer And Painting Of Approved Make And Colour. Cost Includes Cutouts For Electrical Fittings, Materials, Labour, T&P Etc Complete As Per Direction Of The Engineer-In-Charge , Grid Ceiling With Anutonesubtex Nubby Step Edge , Supply And Installation Of Anutone 15 Mm Glassfiber Steppe Edge Glass Fibre Core Ceiling Tile Of Size 595 X 595 X 15Mm Having All Edges Encapsulated With Chemical Treated Paint & Having Density 100-120 Kgs / M3, Weight 1.5 - 3.0 Kg / M2 Which Is Suspended By Using 0.3Mm Thick And 15 Mm Wide Pre Coated Metal T15 / 24 Grid System. The Technical Parameters Are As Follows :Core - Glassfibre, Fire – Class 1 & P , Acoustics – Nrc 0.95, Climate ( Oc Rh ) – 40, 95, Termite Resistance , Light Reflectance – 85 %, Green ( Rc % ) – 35, Hygiene ( Voc, Clean Room ) – Low, Class 3 Strength, Load Capacity ( Kg ) - Antisag. The T15 / 24Grid System Of 600 X 600 Mm Module Shall Include Wall Angle ( Wa15 ) With Unequal Flanges Of Size 14 X 20 X3000mm Wide, Length 3000Mm, 0.43 Mm Thick Fixed Along The Perimeter Of Wall With The Help Of Nylon Sleeves And Suitable Fasteners At 300Mm Centers. Then Suspend The Main T15 ( Mt15w36 ) Having Flange Width 15Mm / 24 Mm , Height32 / 38 Mm And Length 3600Mm Thickness 0.30 Mm From The Soffit With Help Of Soffit Cleat And Wire At 1200Mm C / C. Cross T15 ( Ct15w12 ) With Flange Width 15 Mm, Height 32 Mm And Length 1200 Mm Is Then Interlocked Into The Pre-Cut Slots In The Main T15 At 600Mm Centers In The Direction Perpendicular To The Main T15. Finally Cross T15 ( Ct15w06 ) Having Flange Width 15 Mm, Height 32Mm And Length 600Mm Are Then Interlocked Into The Pre Cut Slots In The 1200 Mm Cross T15 At 1200Mm Centers Andin Direction Parallel To The Main T15.Anuton Subtex Nubby Steppeedge Of Size 595 X 595 X 15Mm Thick Shall Be Placed Into The Grid Size Of 600 X 600 Mm. Ensure Arrow Marks Behind Subtex Panels Are Orianted In One Direction To Achieve Uniform Shade.Test Certificate Will Be Submmited After Procurement Of Materials. , Ceiling - Ceiling With Wooden Slat Hdf Plank :- Anutone Or Equivalet. , Supply And Installation Of Anutonehigh Density Fiber Board Made Out Of Pinewood E1 Grade Fiberboard, Melamine Laminated Finish, Perforated Wooden Grooved Perforated Hdf Slats Defuse L 16-2 / L 8-2 - ( 2 Mm @ 16 Mm Pitch ) , Back Lined With Black Acoustical Fleece, Tongue-Groove Edge For A Seamless Look, Fire Resistance Grade, Of Lineal Dimension Size 128 Mm X 2440 Mm X 16 Mm Thick Having Density 800 Kg / M3, Weight 12.8 Kgs / M2 Installed By Using Gi Strut System. The Gi Strut System Includes Gi Cross Channel ( Cc 25 ) Having Thickness 0.45 Mm, Length 3600 Mm, Knurled Web 40 Mm, Depth 25 Mm And Equal Flanges 9.5 Mm Is Fastened Vertically At Every 600 Mm Centers.Aluminum Core Cross Channel ( Cc 18 ) Having Thickness 0.5 Mm, Length 2400 Mm, Web 15 Mm & 27 Mm, Depth 18 Mm And Flanges Of 7 Mm With Suitable Edge & Center Brackets Is Then Fixed Perpendicular To The Cc 25. Now The System Is To Be Suspended On Gi Frames As Per The Specification For Fixing Concealed Grid Ceiling System. The Concealed Ceiling System Shall Include Gi Wall Channel ( Wc 27 ) Having Thickness 0.45 Mm, Length 3600 Mm, Unequal Flanges Of 15 & 20 Mm And Web Of 27 Mm Should Be Fixed Along The Perimeters Of The Wall With Nylon Sleeves And Suitable Fasteners At Every 300 Mm Centers. Then Suspend Main Channels ( Mc 45 ) Having Thickness 0.9 Mm, Length 3600 Mm, Equal Flanges Of 15 Mm And Web 45 Mm From The Soffit At Every 1200 Mm Centers With Suspender Angle ( Sa 25 ) Having Thickness 0.45 Mm, Unequal Flanges Of 25 & 10 Mm. Gi Cross Channel ( Cc 25 ) Having Thickness 0.45 Mm, Length 3600 Mm, Knurled Web 35 Mm, Depth Of 25 Mm And Equal Flanges 9.5 Mm Is Fastened To The Main Channel In The Direction Perpendicular To The Main Channel At Every 450 Mm Centers.Test Certificate Will Be Submitted After Procurement Of Materials. , Grid Ceiling Magnesium Oxide Vinyl Flim Square Tiles , Supply And Installation Of 8 Mm Thick Magnesium Oxide Square Edge Magnesia Core Ceiling Tile Of Size 595 X 595 Mm Having Density 1000 Kgs / M3, Weight 8 Kg / M2 Which Is Suspended By Using 0.3 Mm Thick And 24 Mm Wide Precoated Metal T 24 Grid System. The Technical Parameters Are As Follows :Core - Magnesia, Fire – Class 1 & P, Acoustics – Stc 44 - 54 , Climate - 50 , Rh - 95, Termite Resistance , Green ( Rc % ) – 30, Hygiene ( Voc, Clean Room ) – Low, Class 3 , Thermal-0.12 W / Mk. The T 24 Grid System Of 600 X 600 Mm Module Shall Include Wall Angle ( Wa 24 W 30 ) With Unequal Flanges Of Size 14 & 20 Mm Wide, Length 3000 Mm, 0.43 Mm Thick Fixed Along The Perimeter Of Wall With The Help Of Nylon Sleeves And Suitable Fasteners At 300 Mm Centers. Then Suspend The Main T 24 ( Mt 24 W 36 ) Having Flange Width 24 Mm, Height32 Mm And Length 3600 Mm From The Soffit With Help Of Soffit Cleat And Wire Rod Along With Leveling Spring Clip At 1200 Mm C / C. Cross 24 ( Ct 24 W 12 ) With Flange Width 24 Mm, Height 32 Mm And Length 1200 Mm Is Then Interlocked Into The Precut Slots In The Main T 24 At 600 Mm Centers In The Direction Perpendicular To The Main T 24. Finally Cross T 24 ( Ct 24 W 06 ) Having Flange Width 24 Mm, Height 32 Mm And Length 600 Mm Are Then Interlocked Into The Precut Slots In The 1200 Mm Cross T 24 At 1200 Mm Centers Andin Direction Parallel To The Main T 24. Magnesium Oxide Vinyl Square Edge Of Size 595 X 595 X 8 Mm Thick Shall Be Placed Into The Grid Size Of 600 X 600 Mm.Test Certificate Will Be Submitted After Procurement Of Materials. , Panelling - Wall Paneling With Wooden Salon Salts Surco :- Anutone Or Equivalent. , Supply & Installation Ofwall Paneling Of Anutone Slats Surco High Density Fiberboard Made Out Ofpure Pinewood Particles, Fire Resistance- Pink In Colour Core With5 Test Fire Resistance Bs 476 Part 5 , Bs 476 Part 6 , Bs 476 Part 7 Iso 1182 Astm E662 Smoke Density- Melamine Laminated Finish, Perforated Wooden Grooved Hdf Slatsl16-2 ( 2 Mm Grooves @ 8 Mm Centers ) , Tongue-Groove Edge For A Seamless Look Of Lineal Dimension Size 128 Mm X 2440 Mm X 16 Mm Thick Having Density 700 Kg / M3, Weight -9 Kgs / M2 With Back Fleecs From Soundtex Germany Nonwoven Acoustic To Be Pasted On Slats Surco Is To Be Installed By Using Gi Strut System. The Technical Parameters Are As Follows Core Variants - Fiberboard, Climate ( Oc Rh ) – 50, 70 Light Reflectance – 75%, Green ( Rc % ) – 25, Hygiene ( Voc, Clean Room ) – Low, Class 1, Strength, Load Capacity ( Kg ) - Anti Sag, Ball-Impact.The Concealed Wall Paneling System Shall Include Gi Wall Channel ( Wc25 ) Having Thickness 0.45Mm, Length 3600Mm, Unequal Flanges Of 15 & 20Mm And Web Of 25Mm Should Be Fixed Along The Perimeters Of The Wall With Nylon Sleeves And Suitable Fasteners At Every 300Mm Centers. Then Fixed Main Channels ( Mc45 ) Having Thickness 0.9Mm, Length 3600Mm, Equal Flanges Of 15Mm And Web 45Mm From The Side Wall & Fixed At Every 1200Mm Centers With Gi Cross Channel ( Cc25 ) Having Thickness 0.45Mm, Length 3600Mm, Knurled Web 35Mm, Depth Of 25Mm And Equal Flanges 9.5Mm Is Fastened To The Main Channel In The Direction Perpendicular To The Main Channel At Every 600Mm Centers. The Framework Will Maintain 50 / 75 Mm Gap From The Walls. Now Clad The Wooden Slats Surco On The Cc 18 With The Help Of Center & Edge Clips To Get Better Locking Of Slats. The Tongue & Groove Are To Be Properly Aligned To Get Flush Look . Synth Poly Fiber Pf 5 X 50 Wool Of 500 Gsm To Be Filled Between The Horizontal & Vertical Studs As In Filler With The Help Of Wire / Stick 7 Adhesive. Test Certificate Of The Use Products Shall Be Submitted After Procurement Of Materials , Panelling - Wall Paneling Stretch Fabric Nrc / Hush :- Anutone Or Equivalet. , Supply And Installation Of Anutone Stretchable Acoustical Fabric Nrc Fabric System By Using Fr Grade Nrc Fabric Of Size 1700 Mm Width, Shall Be Stretched By Using Wooden Base 10 Mm Thick Rigid Vinyl Stretch Tracks Half Wrap / Full Wrap 15 Mm Fs15 & Mid Seam 15 Mm Fs 15, 15 Mm Pinewood Magnesia Bonded Strand Board, Synthetic Poly Fiber 5X50 Infill With Requisite Accessories & Tools. Pinewood Wood Based Wool Fiber Having 15 Mm Thick Square Edge Is First Installed On The Wall Along The Marking Lines With Metal Fasteners Inserted At 300 Mm Centers Fs 15 Tracks To Be Installed On Wooden Base After Applying Stick S7 Adhesive On Both Surfaces For A True & Continuous Secure Grip, & Heavy - Duty Fasteners At 150 Mm Centers On Both Sides Of Stretch Tracks. Pinewood Wool Panels Having Square Edge Magnesite Bonded Pinewood Fibers Panels Of Size600 X 1200 X15 Mm Having Density 400 Kg / M3 , Weight 4 Kg Which Is Fixed To Gi Channel Cc25 On Walls Placed At 600 Mm Centersvertically / Horizontally With Suitable Fasteners With Mc 45 At 1200 C / C & Wc 25 Is For Supporting The Main Frame.. Synthetic Poly Fiber Anutone Pf 5 X 50 Mm Thick Adhered On Strand Tracks By Following The Fabric Thread Line Or Pattern. The Fabric Nrc Is Stretched & Tucked Into The Stretch Tracks & Secure Into The Locking Jaws So That It Will Be Smooth, Free Of Wrinkles With The Tucking Tools. Note - Minimum 50 Mm Additional Fabric Is Required For Tucking Hence Maximum Module Wall Fabric Width Would Be 1600 Mm The Technical Parameters Of The System Are Core - Pinewood Fibre & Polyfiber Fire - 1 Acoustic - Nrc 0.85 Climate Ocrh - 49, 90 Termite Resistance - Yes , Light Reflectance - Colour Dependant , Green Rc % - 25 , Hygiene ( Voc , Clean Room ) - Low , Class 1. Test Certificate Will Be Submitted After Procurement Of Materials. , Wooden Panelling With Veener. , Providing, Fitting And Fixing Full Height Wooden Paneling To Walls And Columns Wher Ever Necessary From Floor Lvl To Ceiling Ht Or As Per Drawing / Design Made Out Of 50.8Mmx25.4Mmx1.34Mm Thick Aluminium Rectangular Sections Placed@ 600Mm C / C Both Ways On Grid, On Top Of Grid 12Mm Fire Resistant And Termite Proofply ( Conforming To Is Code :5509 ) To Be Provided With 4Mm Thk Veneer Of Approved Shade And Colour Finished With Melamine Polish As Per Design / Drawing Or As Directed By The Architect / Engineer-In- Charge. The Rate Includes Cost Of Cutouts For Electrical Switches, Light Fixtures, Wall Bracket Fans If Any, All Complete With Materials, Labour, T&P, Taxes Etc. , Auditorium Chairs , Providing And Fixing Of Auditorium Chair Of New Click -Mb Audi, Click Medium Back Auditorium Chair , Fabric Upholstered Cushion Seat, Tip Up Seat Fixed Arms Size-H-1200 X D-450 X L650 Etc Including Cost Of Chair, Materials And Installation Labour Complete :- Featherlite Or Equivalent. ( Model- Venus-Sch Without Writing Desk Push Back ) , Anti-Termite Treatment , Pre-Construction Anti-Termite Treatment To Your Site With Lmidachloprid 30.5 Sc Or Chloropyrifos 20% Ec As Per Is 6313 Part-Iii ( 2013 ) Revision Including All Materials And Labour Cost Etc. , Flush Door Shutter , Providing And Fixing Factory Made Flush Door Shutter Of 35Mm Thick Including 1Mm Th Laminate Both Side And All Stainless Steel Hardware Fitting, Labour, Carrage Of All Materials Etc. Complete As Per Direction Of Engineer-In-Charge, Manufactures Specification& Drawing. , Providing And Fixing Pristine White Upvc Doors & Windows , Providing And Fixing Pristine White Upvc Doors & Windows Make: Fenesta. Company Must Have Own Production Facilities ( Extrusion & Fabrication ) & Control The Entire Cycle From Extrusion To Installation To Post Sales Service. Providing And Fixing Of Factory Made Upvc Sliding Window ( White Colour ) Complete, Comprising Upvc Multi-Chambered Frame Having In-Built Upvc Roller Track On Top And Upvc Sash With Wall Thickness Of 2.0Mm ( +-0.2 Mm ) Duly Reinforced With G.I. Section1.6 Mm ( +-0.2 Mm ) , Profile Shall Be Manufactured From Tropicalized Blend With Tio2 And Required Additives. Profile Must Be Colorfast And Conform To Standard En12608. The Profile Sections Should Have Multi Hollow ( Min 2 To 3 Chambers ) Chamber To Include Gi Reinforcement With 120 Gsm Zinc Coated, Fitted In Continuous Length, In Closed Chamber. The Thickness Of Gi Should Be Selected To Meet The Wind Load Requirement As Per Is 875- Part Iii On Sash / Mullion. Supplier Should Be Submitting Wind Load Calculation & Validation Complying With Is-875-Iii Before Material Supply. Minimum Steel Reinforcement Thickness Of 1.2Mm To 2.5Mm. Upvc Windows & Doors Must Be Fabricated With Fusion Welded Corners & Must Conform To The Strength Requirements Based On Wind Load As Per Is 875-Part Iii.All Hardware Fitted Should Be Non-Ss, Except Handles To Be Of Zinc / Al. Alloy Casted With Powder Coated.Glass Should Be Of 6Mm Single Clear Glass With Weather Seal ( Epdm / Tpe ) . There Would Be Warranty Of 10 Years On Profile & One Year On Hardware From The Date Of Installation. Upvc Windows & Doors Must Be Installed By Profile Manufacturer Only.Only Manufacturer Waranty Is Aceptable. After Placing 6 Mm Green Reflective Toughned Glass In The Sash, Upvc Glazing Bead, Interlock, Epdm Gasket, Brush Shall Be Provided Including Touch Lock ( Above 1500 Mm Multi Lock ) And Rollers & Proper Drainage System Shall Be Provided. Window Frame Will Be Fixed To The Wall With 100Mm Long And 8Mm Dia. Fasteners And After Fixing Frame The Gap Between Frame & Wall Should Be Filled With Silicon Sealant ( Not More Than 5 Mm X 5 Mm ) , Complete In All Respect As Per Direction Of Engineer-In-Charge. , G.R.C. Jali , Providing And Fixing Glass Reinforced Concrete ( G.R.C ) Screens In Approved Size, Pattern, Design, Shadeand Thickness Of 50Mm On Frame And Design Element In 30Mm Thick Have Weight Approximately Between 3.5 - 4 Kg Per Sq.Ft .And Color Of M / S Unistone Make Or Equivalent. The Above Weight And Having At Least 50% Void Space. The Screens Should Be Made From 53 Grade White Portlsnd Cement Manufactured By N.E.G Japan Or Equivalent, Super Plasticizers Manufactured By Basf Or Equivalent, Polymers Manufactured By Basf Or Equivalent And U.V Resistant Synthetic Inorganic Pigments Should Be Used For Pigmentation Manufactured By Bayferrox ( Germany ) Or Equivalent. The Matrial Casting Should Take Place In Frp Molds. The Fixing Of Screens Should Be Dry Fixing I.E. To Be Done With M.S Galvanized Clamps, Fixtures And Fasteners Of Hilti / Fischer. , Waterproofing Treatment :- Terrcae Roof Top Surface. , Waterproofing Treatment Of Terrace:- Ponding Test First To Be Done, Application Of Nerolac-Perma Coat & Seal In 2 Coats Over The Roof Slab & Continue Over The Parapet Wall Reinforced With Nerolac-Perma Non-Woven Polyester Fabric Coving With 1:4 C.M Admixed With Nerolac-Perma Plast-O-Proof Std @ 100 Gram Per 50Kg Cement Over The Joint Terrace To Parapet Over Bond Coat Nerolac-Perma Latex Sbr ( 1:4:6 ) Followed By A The Protection Screed ( 1:1.5:3 ) In Panel Of Size 2 Mtr X 2 Mtr To Drain The Water Towards The Rain Water Pipe & Finally Filled The Grooves 8Mm X 10Mm With Nerolac-Perma Polyseal ( Poly Sulphide Sealant ) Complete As Per Manufacture Specification & Direction Of Engineer In Charge. I ) - Waterproofing Of Roof Top--- Ii ) - Groove Filling & Sealing Exposed Screed Plaster- Iii ) - Admixture Nerolac-Perma Plast-O-Proof Std- ( Rate Excluding Protection Plaster ) N:B: All The Waterproofing Treatment Shall Be Executed By An Authorized Applicator Of Our Company. A Written Guarantee On Non-Judicial Stamp Paper Shall Be Submitted By The Applicator For A Minimum Period Of 5 ( Five ) Years From The Date Of Completion For The Satisfactory Performance Of The Entire Waterproofing Treatment System. , Luxture Stamp Concrete , Providing & Applying And Finishing The Top Surface Of Concrete, In Accordace With Sprinkling Of Luxture Colour Hardener At The Rate Of 0.390 Kg / Sqft, Floating The Surface With Different Types Of Floaters, Application Of Release Agent At The Rate Of 0.013Kg / Sqft. Stamping The Concrete With Stamping Tools, Cleaning The Surface With Water And Application Of Acrylic Based For Finishing The Wall, Ceilling, Piller Where Required Complete All As Per Instruction Of The Engineer-In-Charge. , Structural Glazing , Providing And Fixing Of Fixed Glazing With Part Top Hung Of Approved Make To Be Fabricated From Roll Formed Sections Made Of Pre-Painted Steel ( Base Steel As Per Is-513 Of 0.6 Mm Thick “D” Quality, Galvanized As Per Is-277 With Zinc Of 120Gm / Sq.Mtr ) With Paint Specification Being With Primer Of 5-7 Microns And Finished Paint With Polyster Paint ( Black / Pearl White / Chocolate Brown ) Of 12-16 Microns Alongwith The Alkyd Backer At The Back Of 5-7 Microns And The Sizes Of Outer Frame Being Of 46X52 Mm And With All Vertical And Horizontal Mullions Are Of 46X70 Mm And Fixed Beadings Are Of 18X25 Mm. Top Hung Shutter Should Be Of 46 X 46 Mm. Accessories / Gaskets Are To Be Used As Per The Manufacturer’S Supply And Specification Like Handle Being Made Of High Grade Aluminium Powder Coated And With Nylon Receiver And Gasket Will Be Made Of Epdm. All Corner Brackets Are To Be Made Of Crca With Zinc Phosphating.The Mullion Caps And Louvered-Clips Should Be Of Glass Filled Nylon. The Sections Are To Be Cut To Length , Mitre Joined With Corner Bracket And Frames Are Fixed To The Concrete / Masonry Walls By Means Of Self Expanding Screws And Glass To Be Used Of 5Mm Reflective With All Taxes Complete.