| 1 | Charges for carrying out the daily and routine maintenance of equipments in Effluent Treatment plant such as Effluent re-circulation cum disposal pumps, Sewage disposal pumps, CMB (Central Monitoring Basin), Tilted plate interceptor feed pumps, oily sludge disposal pumps, oily effluent disposal pump, Non oilyeffluent & sludge disposal pumps and Effluent disposal sump pumps (30Nos) in 15locations & sewage disposal sump pumps in 20locations and its auxiliaries, Dozing tanks & Dozing pumps and its agitators, Acid & Alkali loading pumps andValves and pipe lines as per the direction of Engineer in-charge including cost of labour lead, lift, consumable safety appliances and hire charges for Tools & Plants etc., complete. |
| 2 | Charges for carrying out overhauling/repairing works such as replacement of failed bearing replacement of worn-out shaft etc. by complete dismantling, inspection, replacement of worn-out parts if necessary and assembling, alignment, testing and commissioning activities for the equipments in Effluent Treatment plant - Effluent re-circulation cum disposal pump (Type Horizontal, Centrifugal, Pump capacity 250M3/hr, Motor capacity 75KW, RPM 1480) and its auxiliariesas per the direction of Engineer in-charge including cost of labour lead, lift, consumable safety appliances and hire charges for Tools & Plants etc., complete. |
| 3 | Charges for carrying out overhauling/repairing works such as replacement of failed bearing replacement of worn-out shaft etc. by complete dismantling, inspection, replacement of worn-out parts if necessary and assembling, alignment, testing and commissioning activities for the equipments in Effluent Treatment plant, Sewage disposalpump (Type - Horizontal, Centrifugal Pump, capacity- 50M3/hr, Motor capacity - 22KW, RPM 1475) and its auxiliaries and as per the direction of Engineer in-charge including cost of labour lead, lift, consumable safety appliances and hire charges for Tools & Plants etc., complete. |
| 4 | Charges for carrying out overhauling/repairing works such as replacement of failed bearing replacement of worn-out shaft etc. by complete dismantling, inspection, replacement of worn-out parts if necessary and assembling, alignment, testing and commissioning activities for the equipments in Effluent Treatment plant, Tilted Plate Interceptor feedpump (Type - Screw Pump, capacity- 10M3/hr, Motor capacity - 22KW) and its auxiliaries and as per the direction of Engineer in-charge including cost of labour lead, lift, consumable safety appliances and hire charges for Tools & Plants etc., complete. |
| 5 | Charges for carrying out overhauling/repairing works such as replacement of failed bearing replacement of worn-out shaft etc. by complete dismantling, inspection, replacement of worn-out parts if necessary and assembling, alignment, testing and commissioning activities for the equipments in ETP Sump pump(CPU Neutralized effluent pump) (Type - Submersible Pump, Motor capacity - 9.3 KW) and its auxiliaries and as per the direction of Engineer in-charge including cost of labour lead, lift, consumable safety appliances and hire charges for Tools & Plants etc., complete. |
| 6 | Charges for carrying out overhauling/repairing works such as replacement of failed bearing/mechanical seal replacement of worn-out shaft etc. by complete dismantling, inspection, replacement of worn-out parts if necessary and assembling, alignment, testing and commissioning activities for the equipments inEffluent / Sewage disposal submersible monoblock sump pumps (3 KW/3.7 KW - RPM 2900) (Discharge capacity 5m3/hr/10m3/hr)and its auxiliaries as per the direction of Engineer in-charge including cost of labour lead, lift, consumable safety appliances and hire charges for Tools & Plants etc., complete. |
| 7 | Charges for carrying out overhauling/repairing works such as replacement of failed bearing/mechanical seal replacement of worn-out shaft etc. by complete dismantling, inspection, replacement of worn-out parts if necessary and assembling, alignment, testing and commissioning activities for the equipments inEffluent disposal submersible monoblock sump pumps (22 KW - RPM 2900) (Discharge capacity 150m3/hr/ 100m3/hr) and its auxiliaries as per the direction of Engineer in-charge including cost of labour lead, lift, consumable safety appliances and hire charges for Tools & Plants etc., complete. |
| 8 | Charges for carrying out overhauling/repairing works such as replacement of failed bearing/mechanical seal replacement of worn-out shaft etc. by complete dismantling, inspection, replacement of worn-out parts if necessary and assembling, alignment, testing and commissioning activities for the equipments in oily sludge & disposal pumps, Non oily effluent & sludge disposal pumps and Effluent /Sewage disposal submersible monoblock sump pumps (1.5 KW - RPM 2900) (Discharge capacity 2m3/hr)and its auxiliaries as per the direction of Engineer in-charge including cost of labour lead, lift, consumable safety appliances and hire charges for Tools & Plants etc., complete. |
| 9 | Charges for carrying out overhauling/repairing works such as complete dismantling, inspection, replacement of worn-out parts if necessary and assembling, alignment, testing and commissioning activities for the equipments in Alum /Lime/ Poly dosing pump (0.18 KW) (Postive Displacement pump) and its auxiliaries as per the direction of Engineer in-charge including cost of labour lead, lift, consumable safety appliances and hire charges for Tools & Plants etc., complete. |
| 10 | Charges for carrying out overhauling/repairing works such as complete dismantling, inspection, replacement of worn-out parts if necessary and assembling, alignment, testing and commissioning activities for the equipments in Alum /Lime/ Poly Agitator Flocculator motor/ Flash mixer pump (0.37 KW) and its auxiliaries as per the direction of Engineer in-charge including cost of labour lead, lift, consumable safety appliances and hire charges for Tools & Plants etc., complete. |
| 11 | Charges for carrying out overhauling/repairing works such as replacement of failed bearing replacement of worn-out shaft etc. by complete dismantling, inspection, replacement of worn-out parts if necessary and assembling, alignment, testing and commissioning activities for the equipments in Oil disposal pump (0.37 KW - Centrifugal Pump ) (Discharge capacity 2m3/hr)and its agitatorsas per the direction of Engineer in-charge including cost of labour lead, lift, consumable safety appliances and hire charges for Tools & Plants etc., complete. |
| 12 | Charges for carrying out overhauling/repairing works such as replacement of failed bearing replacement of worn-out shaft etc. by complete dismantling, inspection, replacement of worn-out parts if necessary and assembling, alignment, testing and commissioning activities for the equipments in Acid / Alkali unloading pumps (3.7 KW - Centirifugal Pump ) (Discharge capacity 5m3/hr)and its agitatorsas per the direction of Engineer in-charge including cost of labour lead, lift, consumable safety appliances and hire charges for Tools & Plants etc., complete. |
| 13 | Charges for attending the choke/ puncture work of 250NB, 200NB, 65NB, 50NB Effluent buried M.S pipe line including cutting, welding and wrapping of anti-corrosive sheet as and when required as per the direction of Engineer in-charge including cost of labour lead, lift, consumable like welding rods, cutting gas, anti-corrosive sheet, safety appliances and hire charges for Tools & Plants etc., complete for 3mtr length of 2joints per work. |
| 14 | Charges for attending the choke / puncture work of 80NB & 65NBEffluent and Sewage buried UPVC pipe line including cutting and joining by using special paste as and when required as per the direction of Engineer in-charge including cost of labour lead, lift, consumable like paste, safety appliances and hire charges for Tools & Plants etc., complete. |
| 15 | Charges for excavation of earth to work in the underground pipe line and refilling for attending the choke/ puncture work/ for inspection work. |
| 16 | Charges for attending choke/ puncture work of 250NB, 200NB etc.., Effluent/ Sewage open areaMS pipe line including cutting , grinding & welding of 1 pipe 3mtr length of 2 joints. as per the direction of Engineer in-charge including costof labour lead, lift, consumable like paste, safety appliances and hire charges for Tools & Plants etc., complete |
| 17 | Charges for attending 300 NB ,250NB Butterfly valve along with NRV 1 set dismantling, inspection, cleaning, lapping, reconditioning and refixing in Effluent Treatment plant area as per the direction of Engineer in-charge including costof labour lead, lift, consumable like paste, safety appliances and hire charges for Tools & Plants etc., complete |