|
| 1 | Remuneration for Local Staff (inclusive of per Diem allowance) |
| 2 | PROFESSIONAL Staff |
| 3 | Team Leader cum Senior Bridge Engineer |
| 4 | Bridge Structural Engineer |
| 5 | Highway cum Pavement Engineer |
| 6 | Material-cum-Geotechnical Engineer-Geologist |
| 7 | Senior Survey Engineer |
| 8 | Senior Geologist |
| 9 | Environmental Specialist |
| 10 | Quantity Surveyor/Documentation Expert |
| 11 | Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate) |
| 12 | Assistant Bridge Engineer |
| 13 | Assistant Highway Cum Pavement Engineer |
| 14 | Assistant Material-cum-Geotechnical Engineer-Geologist |
| 15 | Survey Engineer |
| 16 | Assistant Quantity Surveyor/Documentation Expert |
| 17 | Support Staff (Fixed Rates) |
| 18 | Office Manager (1 No.) |
| 19 | Typist (1 No.) |
| 20 | Office Boy (1 No.) |
| 21 | Night Watchman (1 No.) |
| 22 | Transportation (Fixed Costs) |
| 23 | The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (3 Vehicle for 4months each) |
| 24 | Duty Travel to Site (Fixed Costs) |
| 25 | All Trips |
| 26 | Office Rent (Fixed Costs) |
| 27 | The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services. |
| 28 | Office Supplies, Utilities and Communication (Fixed Costs) |
| 29 | Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication |
| 30 | Office Furniture and Equipment (Fixed costs) |
| 31 | Office Furniture and Equipment |
| 32 | Reports and Document (Fixed costs) |
| 33 | Monthly Report (03 sets) |
| 34 | Inception Report & QAP |
| 35 | Environment and Social Impact Screening Report |
| 36 | Draft Feasibility Report |
| 37 | Final Feasibility Report |
| 38 | Survey and Investigation |
| 39 | A.Topographical Survey (Fixed Rate) |
| 40 | Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision. |
| 41 | B. Investigation (Fixed cost) |
| 42 | All investigations/surveys including Road and Bridge Inventory,FWD Test and Pavement Evaluation,Roughness Survey,Axle Load Survey,Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies,Land Acquisition Studies, etc. |
| 43 | Net Work Survey and GPR |
| 44 | Net work Survey of the existing Highways as arepository for civil work as per directions fromAuthority. |
| 45 | GPR Survey for detection of under ground utilities |
| 46 | Sub-soil Investigation & Other Works |
| 47 | Sub-Soil Investigation |
| 48 | a)Boring in all type of soils (other than hard rock) |
| 49 | b) Boringinhard rock |