Annual Maintenance Contract ( Amc ) Under B&A Department, Stg-I, 2X300mw Dec, China Units For All Boiler & Auxiliaries Equipments For 02 ( Two ) Years- 1 Mandatory Jobs: Daily Or Running Maintenanceof Boiler & Aux. System 2 Mandatory Jobs: Cost Of Safety Equipment 3 Rate Contract For Piecemeal Jobs: Coal Mill Full Overhauling As Per Scopeof Work In Annexure 2A Including The Supply Of All Consumables, Manpower, T&P, Measuring Instruments, Scaffolding Etc. 4 Rate Contract For Piecemeal Jobs:Coal Mill Mini Overhauling As Per Scopeof Work In Annexure 2B Including The Supply Of All Consumables, Manpower, T&P, Measuring Instruments, Scaffolding Etc. 5 Rate Contract For Piecemeal Jobs:Gear Box Replacement As Per Annexureincluding The Supply Of All Consumables, Manpower, T&P, Measuring Instruments, Scaffolding Etc. 6 Rate Contract For Piecemeal Jobs:Feeder Overhauling As Per Annexure 2D 7 Rate Contract For Piecemeal Jobs:Additional Tyre Servicing Of Coal Mill 8 Rate Contract For Piecemeal Jobs:Cleaning, Stacking, Loading, Carriageover Pucca Road And Unloading At Destination ( Within 5 Km Lead ) Ofash And Coal Mill Rejects From Rejection Conveyor Tunnel Andsurroundings With The Scope Of Supply Of Manpower, Tools Andtackles, Conveying Vehicle ( Like Tractor ) With Operator Andfuel. [ Per 500 M3 ] . 9 Rate Contract For Piecemeal Jobs:All Sadc Internal Checking In All Cornerof Boiler , Dismantling / Freeness Checking, Replacement Of Bush / Bearing, Repairing Of Erosion , Coupling With Power Cylinderoperation And Complete Box Up Of All Doors Of Secondary Air Ductwith Gasket And Necessary Scaffolding. 10 Rate Contract For Piecemeal Jobs:Hfo / Ldo / Air Nozzle / Coal Nozzle Systemtilting Checking By Opening The Boiler Door, Reach Rod Adjustment / Cleaning / Replacement ( Wherever Needed ) Necessary Full Welding, Door Repairing With Necessary Scaffolding And Complete Box Upof Doors, Scrap Removal & Checking Of Operation. 11 Rate Contract For Piecemeal Jobs:Coal Nozzle Tip, Oil Nozzle Tip, Airnozzle Tip, Checking By Opening Boiler Door At Bottom Hopper Withnecessary Scaffolding In Furnace Necessary Rectification , With Allkinds Of Allied Jobs, Angle Of Burner Tilting Adjustment Andcomplete Boxup. 12 Rate Contract For Piecemeal Jobs:Sky Climber Fitting In The Boilerdismantling For Burner Checkup & Operation During Burnerchecking. 13 Rate Contract For Piecemeal Jobs:Repalcement Of Damaged Coal Compartmentassembly With All Associated Work. ( Without Scaffolding ) . 14 Rate Contract For Piecemeal Jobs:Ccp Bend Dismantling Replacement, Welding, Pipe Alignment, With Hanger Support Adjustment With Necessary Scaffolding And Removal Of Scrap From Site To Scrap Yard. 15 Rate Contract For Piecemeal Jobs:Ccp Straight Pipe Dismantling Replacement, Welding, Pipe Alignment, With Hanger Support Djustment With Necessary Scaffolding And Removal Of Scrap From Site To Scrap Yard. 16 Rate Contract For Piecemeal Jobs:Replacement Of Seal Air Fan With New Bearing , Bearing Housing, Coupling, Impeller , Shaft Bearing Cooling Water Line Modification After Removal Of Old Seal Air Fan. 17 Rate Contract For Piecemeal Jobs:Duct Repairing 18 Rate Contract For Piecemeal Jobs:Replacement Of Aph ( Model: Lap10320 / 3883 ) Guide Bearing Assy. With All Associated Work. For Each Bearing. 19 Rate Contract For Piecemeal Jobs:Replacement Of Aph ( Lap10320 / 3883 ) Support Bearing Assy. With All Associated Work.For Each Bearing. 20 Rate Contract For Piecemeal Jobs:Gearbox Of Aph Model: Lap10320 / 3883 ) Gear Box Along With All Associated Work ( Time: 02 Days ) . 21 Rate Contract For Piecemeal Jobs:Water Wall Tube Joint Withoutscaffolding. Per Joint 22 Rate Contract For Piecemeal Jobs:Economiser Coil / Ltsh Bottom Bank / Steamcooled Wall Joint Without Scaffolding. Per Joint. 23 Rate Contract For Piecemeal Jobs:Roof Tube Joint Without Scaffoldingper Joint. 24 Rate Contract For Piecemeal Jobs:Spacer Tube Joint Without Scaffoldingper Joint. 25 Rate Contract For Piecemeal Jobs:Ltsh And Eco. Hanger Tube. Per Joint. 26 Rate Contract For Piecemeal Jobs:Screen Tube Joint Without Scaffolding.Per Joint 27 Rate Contract For Piecemeal Jobs:All Reheater Joint With Scaffolding Except Wall Reheater And Medium Reheater Where Extra Payment Will Be Made For Any Scaffolding Beyond 6 M Horizontal And 6 M Vertical ) . Per Joint. 28 Rate Contract For Piecemeal Jobs:Ltsh Middle / Top Bank / Wall Reheater Joint Without Scaffolding. Per Joint. 29 Rate Contract For Piecemeal Jobs:Other Superheater Joint Excluding Ltsh With Scaffolding Upto 6 M Vertical And 6 M Horizontal. Per Joint. 30 Rate Contract For Piecemeal Jobs:Division Panel Without Scaffolding. Per Joint. 31 Rate Contract For Piecemeal Jobs:Stress Relieving 32 Rate Contract For Piecemeal Jobs:Radiography 33 Rate Contract For Piecemeal Jobs:Vertical Scaffolding For Approaching Furnace / Roof Tube / Wall Reheater / Mrh / Platen / Division Panel.Per 6 Meter Vertical. 34 Rate Contract For Piecemeal Jobs:Horizontal Scaffolding For Approaching Medium & Wall Rh / Platen Sh / Divisional Panel / Scw / Rooftubes / Furnace ( Total To Exceed 10 M In Each Case ) . Per 6 Meter Horizontal. 35 Rate Contract For Piecemeal Jobs:Membrane Strip / Skin Casing Welding Per Meter. 36 Rate Contract For Piecemeal Jobs:Removal, Fabrication And Fitting Of Guard Tube And Guard Plate. Per Piece. 37 Rate Contract For Piecemeal Jobs:Build Up In Eroded Tubes As Found To Be Necessary. Per Sq. Inch. 38 Rate Contract For Piecemeal Jobs:Economiser Coil Lifting , Repairing, Fitting & Jointing With Proper Alignment. Per Coil. 39 Rate Contract For Piecemeal Jobs:Ltsh Coil Pulling , Inspection, Proper Alignment Of Coil & Panel With Clit And Support Welding. Per Coil. 40 Rate Contract For Piecemeal Jobs: Second Pass Scaffolding Per 6 Meter Horizontal / Vertical.